Klaim Artikel Anda
Verifikasi kepemilikan artikel akademik
Apakah artikel-artikel ini milik Anda?
Daftarkan diri Anda sebagai author untuk mengklaim artikel dan dapatkan profil akademik terverifikasi dengan fitur lengkap.
Badge Verifikasi
Profil terverifikasi resmi
Statistik Lengkap
H-index, sitasi, dan metrik
Visibilitas Tinggi
Tampil di direktori author
Kelola Publikasi
Dashboard artikel terpadu
Langkah-langkah Klaim Artikel:
- 1. Daftar akun author dengan email akademik Anda
- 2. Verifikasi email dan lengkapi profil
- 3. Login dan buka menu "Klaim Artikel"
- 4. Cari dan klaim artikel Anda
- 5. Tunggu verifikasi dari admin (1-3 hari kerja)
Menampilkan 1–4 dari 4 artikel
Cost Analysis Due to the Addition of Working Time on Periodic Road Maintenance Project on Jl. Ir. Soekarno Ruas 3 Blitar City
Eka Shodiq Permadi
; Hanie Teki Tjendani
; Budi Witjaksana
International Journal of Industrial Innovation and Mechanical Engineering
Vol 2
, No 3
(2025)
Prolonged road damage disrupts community mobility, logistics activities, and reduces road user safety. The road maintenance project on Jl. Ir. Soekarno in Blitar City, which was planned to be completed in 120 days with a budget of Rp1.16 billion, experienced a delay of 8 days due to time management constraints. This study aims to evaluate the use of the Time Cost Trade Off (TCTO) method to accelerate project completion without reducing the quality of work. The TCTO method is used to analyze the...
Sumber Asli
Google Scholar
DOI
Optimizing Time Calculation with Extended Working Hours in the Periodic Road Maintenance Project on Jl. Ir. Soekarno Ruas 3, Blitar City
Eka Shodiq Permadi
; Hanie Teki Tjendani
; Budi Witjaksana
International Journal of Mechanical, Industrial and Control Systems Engineering
Vol 2
, No 1
(2025)
Road maintenance is a strategic effort to support community mobility and economic development. This study aims to determine the optimal duration and analyze the cost impacts of implementing the Time Cost Trade Off (TCTO) method. The method is applied through critical path analysis and adding overtime hours to reduce the project duration. Data is collected from project documents such as daily reports, S-curves, and cost budget plans, then analyzed using Microsoft Project software. The results sho...
Sumber Asli
Google Scholar
DOI
Analysis of Project Delays Impact by Cost in The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method
M. Hery Indra Setiawan
; Budi Witjaksana
; Jaka Purnama
International Journal of Mechanical, Industrial and Control Systems Engineering
Vol 2
, No 1
(2025)
A factory is an industrial building that designed for processing raw materials into products, such as Light Weight Brick Factory that produce light weight brick and other products. The construction of a Lightweight Brick Factory plays a significant role in fostering regional economic development. However, the construction process for this factory has faced several issues leading to delays. This study focuses on the delays encountered in the lightweight brick factory construction project in Lamon...
Sumber Asli
Google Scholar
DOI
Analysis of Time Delays in The Implementation of The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method
M. Hery Indra Setiawan
; Budi Witjaksana
; Jaka Purnama
International Journal of Mechanical, Electrical and Civil Engineering
Vol 2
, No 1
(2025)
Factory is an Industrial Building that processing raw material. This Light Weight Brick Factory Constructions will help the region to develop their economies further. In this case, the Lightweight Brick Factory Constructions have several problem that cause construction delays. This research was carried out because of delays in the lightweight brick factory construction project in Lamongan which was scheduled for completion in the 15th week with a contract value of IDR 1,835,474,186. in week 10 t...