Analysis of Time Delays in The Implementation of The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method
M. Hery Indra Setiawan, et al. (2025). Analysis of Time Delays in The Implementation of The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method. International Journal of Mechanical, Electrical and Civil Engineering, 2(1). https://doi.org/10.61132/ijmecie.v1i1.149
M. Hery Indra Setiawan; Budi Witjaksana; Jaka Purnama, "Analysis of Time Delays in The Implementation of The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method," International Journal of Mechanical, Electrical and Civil Engineering, vol. 2, no. 1, 2025.
M. Hery Indra Setiawan; Budi Witjaksana; Jaka Purnama. "Analysis of Time Delays in The Implementation of The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method." International Journal of Mechanical, Electrical and Civil Engineering, vol. 2, no. 1, 2025.
M. Hery Indra Setiawan; Budi Witjaksana; Jaka Purnama. "Analysis of Time Delays in The Implementation of The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method." International Journal of Mechanical, Electrical and Civil Engineering 2, no. 1 (2025).
M. Hery Indra Setiawan, et al. (2025) 'Analysis of Time Delays in The Implementation of The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method', International Journal of Mechanical, Electrical and Civil Engineering, 2(1). doi: 10.61132/ijmecie.v1i1.149.
M. Hery Indra Setiawan; Budi Witjaksana; Jaka Purnama. Analysis of Time Delays in The Implementation of The Construction of A Light Brick Factory in Lamongan Using The Earned Value Method. International Journal of Mechanical, Electrical and Civil Engineering. 2025;2(1).
Evaluation of the Selection and Application of Environmentally Friendly Materials in Row Housing Design: A Case Study of Cemara Asri, Medan
Parlindungan Waruwu; Melly Andriana; Dara Wisdianti
Sowur (House) Residential Space System, in the Eucalyptus Oil Industry in Wasur Village, Merauke, South Papua
Cindy Priscillia Sinay; Tarcicius Yoyok Wahyu Subroto
Optimization Control PID With QHBM (Queen Honey Bee Migration) Algorithm in Heating Ventilating and Air Conditioning (HVAC) System
Wisnu Wahyu Nugroho; Aripriharta Aripriharta; Sujito Sujito
Design of Intercative Game to Train Children’s Skills Based on Microcontroller
Diyajeng Luluk Karlina
Experimental Study of Artificial Coarse Aggregate Materials Made from Fly Ash
Rajiman Rajiman; Ronny Hasudungan Purba; Inggit Anugriyya Netriza
Improvement of the Early, Middle and Final Patrol Check Process From Manual to Digital with the PDCA Method, Fishbone Diagram, and Why-Why Analysis at PT. Automotive Components Company
Chairul Alfatory; Bintang Rafly Aryansyah; Mahendra Mahendra; Andhika Danisvara; Yudi Prastyo