Publication Search

55,485 articles from 432 journals · 1,579 citations tracked

Showing 1-20 of 24

Analytics

Yunita Mauliana

Venus: Jurnal Publikasi Rumpun Ilmu Teknik 2023 Asosiasi Riset Ilmu Teknik Indonesia

Regency roads are local roads which do not include roads connecting the district capital to other districts, but their network is diverse as a link for local activities, namely connector roads between villages, between sub-districts, production center roads and environmental roads in residential areas. This research focuses on roads in Kaur Selatan District and Maje District, Kaur Regency, Bengkulu Province with a total length of 128.50 km with a total of 68 sections. There are several sub-district roads which are a road network that is integrated with national roads. In general, this road section is often used by various types of vehicles, from light to heavy vehicles. Utilization of roads that do not match their class and the influence of the weather climate in areas that are quite extreme result in landslides so that the road body becomes narrow and heavily damaged. As a result of damage to existing roads, community activities are hampered. The purpose of this research is to provide information to the Bengkulu Regency government in preparing priority planning, determining the type of pavement that is appropriate to the location of the road section and determining the calculation of the costs required. The results of research and calculations show that the cost required for road repairs is IDR. 70,788,844,000 for a period of 5 years. The priority scale consists of 17 sections with a cost of Rp. 57,541,204,000.

Fadilla Umeida Putri; RR. Rochmoeljati

Jurnal Kendali Teknik dan Sains 2023 International Forum of Researchers and Lecturers

PT Atlantic Anugrah Metalindo is a manufacturing company that produces costumize products, steel door systems and fireproof doors. Currently PT Atlantic Anugrah Metalindo is producing 100 units of pallet rack manufacturing with customers from PT X so that proper material requirements planning is needed. The purpose of this research is to determine the material requirements of pallet racks optimally and efficiently. This research requires calculating the Bill of Materials (BOM) using the Cutting plane method and controlling the production process to run effectively and efficiently. Based on the calculations that have been carried out, the results show that for 2 mm thick mild steel material requirements, 6 sheets of plate are needed, 3 mm thick mild steel requires 173 sheets of plate, 3.6 mm thick mild steel requires 12 sheets of plate and 5 mm thick mild steel requires 12 sheets of plate. So that from these calculations PT Atlantic Anugrah Metalindo is expected to minimize the material requirements of pallet rack products.

Elany Tri Yuliyanti; Ute Chairuz M. Nasution

Jurnal Manajemen Kreatif dan Inovasi 2023 International Forum of Researchers and Lecturers

This journal discusses the strategies applied to develop branding for Micro, Small, and Medium Enterprises (MSMEs) UD ALINDRA by updating the design of catalogs, label stickers, and Instagram content. The aim of this research is to enhance the effectiveness of promotion, marketing, and product sales for these MSMEs. The method employed involves interviews with the owners of MSME UD Alindra to gain in-depth knowledge about consumer perceptions and the current branding strategies, analyzing existing challenges, and planning for production, promotion, and design updates. Through a creative approach in designing product catalogs, eye-catching label stickers, and Instagram content that aligns with trends and consumer needs, it is expected that this research will significantly contribute to increasing product sales margins, optimizing MSME owners' understanding of strong and effective branding strategies, and reinforcing their awareness of the positive impact gained from product branding, including enhancing consumer appeal and the product image for MSMEs. The results of this study indicate that the implemented developments positively contribute to the promotion of products from MSME UD ALINDRA and offer valuable insights for MSME owners to improve and enhance their product branding strategies.

Nathania Ariyani Paramesti Anindya; Ni Made Ida Pratiwi

Jurnal Manuhara : Pusat Penelitian Ilmu Manajemen dan Bisnis 2023 Asosiasi Riset Ilmu Manajemen Kewirausahaan dan Bisnis Indonesia

Small and Medium Enterprises (SMEs) are one of several pillars that support the economy in Indonesia. The aim of community service through the Merdeka Entrepreneurial Internship activity is to provide assistance to SME partners, regarding innovation menus, flavors, products, as well as marketing methods via social media. With this service, it is hoped that it can be a solution in improving the welfare of SMEs. The partners who receive assistance in this service are UKM Pejuang Rasa which is located on Jalan Semolowaru No VIII, Sukolilo District, Surabaya City, East Java Province. The methods used in this activity are interviews, problem analysis, production planning, production and promotion. Their Entrepreneurship Internship activities are carried out by approximately 4-5 people per group for a total of 30 working days. After going through the observation stage during the activity, a product was produced in the form of a smoothie bowl which had environmentally friendly paperbowl packaging to become an innovation related to fruit processing at Pejuang Rasa UKM. It is hoped that the results of this product innovation can increase sales and business competitiveness with other SMEs.

Rizki Alfadillah Nasution; Elvira Iskandar

Jurnal Pengabdian Kepada Masyarakat 2023 Pusat Riset dan Inovasi Nasional

This service is about system utilization (enterprise resource planning) in micro, small and medium enterprises (MSMEs) in Indonesia. Applying enterprise resource planning to MSMES can help increase flexibility and integrate entire business processes, such as inventory management, finance, production, and sales. However, the implementation of enterprise resource planning requires mature preparation, including proper selection of suppliers, optimization of internal teams, and preparation of human resources. The research methodology used is a participatory action learning system with the active participation of MSMES stakeholders and enterprise resource planning providers. The implementation process of the ENERPRISE Resource Planning system in MSMES includes the phases of meetings, planning, system design, training, and support, as well as the use of the system in business operations. The implementation steps of the Enterprise Resource Planning system in MSMES include business information documents, functional requirements documents, user acceptance testing, training, and go-live.

Yulianti Fitriani

Jurnal Rumpun Ilmu Kesehatan 2023 Pusat Riset dan Inovasi Nasional

Bronchial asthma is a chronic respiratory disease that often impairs the quality of life of sufferers. Bronchial asthma is characterized by inflammation of the respiratory tract that causes narrowing of the bronchi, swelling, and increased production of mucus. The purpose of this study was to provide nursing care for the ineffectiveness of nasfas patterns with bronchial asthma in the Emergency Room of Patut Patuh Patju Hospital, Gerung, West Lombok. Researchers used a case study method with stages of the nursing process including assessment, formulation of nursing diagnoses, planning, implementation, evaluation and documentation. Nursing care for the ineffectiveness of breathing patterns in AI with bronchial asthma in the emergency room of the Patut Patuh Patju Hospital, Gerung, West Lombok, which was carried out for 3x24 hours, obtained the results that the patient was no longer short of breath, the rhythm of breathing was regular and there was no additional breath sound.    

Tasia Maidi Saputri; Imelda Raudati; Pradita Eko Prasetyo Utomo; Ulfa Khaira

Jurnal Sistem Informasi dan Ilmu Komputer 2023 International Forum of Researchers and Lecturers

This article aims to optimize the profit of seblak business through the application of Simplex method in linear program. Seblak is a popular business today with a wide variety of toppings such as meatballs, sausages, noodles, feet and many more, but efficient production planning and resource allocation can be challenging. In calculating this profit optimization, we use the Simplex method to identify production combinations that can generate maximum profit by considering various constraints related to raw materials, processing time, production costs to product selling prices. The result is expected to help seblak business owners in making smarter decisions regarding production, inventory, and pricing strategies, thus improving their business profitability.

Reza Argianto; Yasir Yasir

Harmoni: Jurnal Ilmu Komunikasi dan Sosial 2023 International Forum of Researchers and Lecturers

Pangkalan Kerinci is an area with many industries in it, including the pulp industry or paper pulp producer. PT RAPP is a company operating in the pulp sector. As a result of this industry, many people complain about air pollution due to industrial activities carried out by PT. RAPP. These activities are monitored by the Pelalawan Regency Environmental Service in collaboration with other stakeholders. The aim of this research is to find out how the planning, implementation and evaluation of communication from the Pelalawan Regency Environmental Service is in controlling industrial air pollution in Pangkalan Kerinci City, Pelalawan Regency. This research is a type of qualitative research with descriptive methods. The subject in this research is the Pelalawan Regency government (Environmental Service) with the determination using purposive techniques. Data collection techniques in this research are through interviews, observation and documentation. The number of informants in the study was 9 people according to the criteria determined through purposive sampling. The data analysis technique used uses the model from Miles and Hubberman and the data validity technique, namely triangulation. The result of this research is that the planning carried out by the Pelalawan Regency Environmental Service was carried out by listening to complaints from the surrounding community, always formulating objectives to provide understanding to the community and then develop message by conveying environmental messages in an informative, persuasive and cognitive manner, which is then continued with media production planning by the Pelalawan City environmental service. The Environmental Service carried out planning implementation after presenting the work program idea, then carrying out technical guidance outreach activities related to PP Number 22 of 2021, collaborating with NGOs and local communities and conveying environmental messages through billboards. Meanwhile, evaluation activities are carried out every six months.  

Muhamad Sidik; Hendri Rasminto

JURNAL ILMIAH SAINS TEKNOLOGI DAN INFORMASI (JITI) 2023 CV. ALIM'SPUBLISHING

Technology currently plays an important role for a company. The implementation of information systems in companies is very popular because performance activities will run well, including the ease of data processing. In this case the company that wants information technology is PT. Arrgo Surya Abadi. The inventory system used at PT. Arrgo Surya Abadi still uses notes in the form of spreadsheets which are summarized every day, making it prone to errors in planning raw material needs, and it is difficult to control the use of production raw materials such as dyes. From this phenomenon, of course, a capable raw material planning information system is needed to process data and create raw material reports automatically. The aim of this research is to provide report data regarding the amount and time of raw materials procured to smooth production activities. The method used in this research is Material Requirement Planning (MRP). The results of this research conclude that with the existence of a computerized system at PT. Arrgo Surya Abadi can assist the production process related to procuring the right materials, in efficient quantities and time.

Muhamad Sidik; Hendri Rasminto

JURNAL ILMIAH SAINS TEKNOLOGI DAN INFORMASI (JITI) 2023 CV. ALIM'SPUBLISHING

Technology currently plays an important role for a company. The implementation of information systems in companies is very popular because performance activities will run well, including the ease of data processing. In this case the company that wants information technology is PT. Arrgo Surya Abadi. The inventory system used at PT. Arrgo Surya Abadi still uses notes in the form of spreadsheets which are summarized every day, making it prone to errors in planning raw material needs, and it is difficult to control the use of production raw materials such as dyes. From this phenomenon, of course, a capable raw material planning information system is needed to process data and create raw material reports automatically. The aim of this research is to provide report data regarding the amount and time of raw materials procured to smooth production activities. The method used in this research is Material Requirement Planning (MRP). The results of this research conclude that with the existence of a computerized system at PT. Arrgo Surya Abadi can assist the production process related to procuring the right materials, in efficient quantities and time.

Ahsan Ama; Hamizan Rabban

Venus: Jurnal Publikasi Rumpun Ilmu Teknik 2023 Asosiasi Riset Ilmu Teknik Indonesia

With increasingly advanced technological developments, some of these problems can be minimized with the latest technology in the construction sector known as Building Information Modeling (BIM). With BIM, all parties involved in the project (stakeholders) can collaborate from the planning stage before the project is carried out, thereby reducing the potential for errors in development implementation (Mafrul, 2022). The use of BIM can provide the various functions necessary to model the entire life cycle of a building, while also providing a basis for dealing with changes and construction progress in positions and correlations between project teams. Proper implementation of BIM enables increasingly integrated design and construction processes, creating buildings with better quality, more efficient production costs, and shorter project completion times (Khairi et al., 2022b).

Ega Laksamana Putra

Mars: Jurnal Teknik Mesin, Industri, Elektro Dan Ilmu Komputer 2023 Asosiasi Riset Teknik Elektro dan Informatika Indonesia

The manufacturer's job is to distribute goods efficiently to meet consumer demand. If goods are delivered on time and are of acceptable quality and quantity, customers will be happy. As a result, a company's productivity levels can be greatly increased with a competent production system. This raises the issue that companies must be able to manage production schedules and prioritize client requests to avoid delivery delays, build excessive amounts of raw material inventory, and increase overall company profitability.

Louise Emmanuel Geraldo; Yanda Bara Kusuma

Jurnal Pengabdian Kepada Masyarakat 2023 Pusat Riset dan Inovasi Nasional

This journal discusses the use of Enterprise Resource Planning (ERP) systems in Small and Medium Enterprises (MSME) in Indonesia. Implementing ERP in MSME can help improve flexibility and integrate all business processes, such as inventory management, finance, production, and sales. However, implementing ERP requires careful preparation, including selecting the right vendor, optimizing internal teams, and preparing human resources. The research method used is the Participatory Action Learning System (PALS), which involves active participation from stakeholders of MSME and ERP vendors. The process of implementing ERP systems in MSME includes stages of meetings, planning, system design, education and mentoring, and using the system in business operations. The steps for implementing ERP systems in MSME include Sales Briefing Document, Function Requirement Document, User Acceptance Test, Training, and Go Live.

Moh Rizky Ainul Yakin; Enny Aryanny

Jurnal Kendali Teknik dan Sains 2023 International Forum of Researchers and Lecturers

CV Dafista Mulia is a drinking water producer company located in Lamongan Regency. The problem that is often faced by companies is the amount of waste that occurs in the process of producing bottled drinking water. The most critical percentage of waste in the bottled water production process (AMDK) is waste overproduction with a weighting percentage of 25.4%; waste defet with a weighting percentage of 16.2%; waste inventory with a weighting percentage of 14.9%; waste unnecessary motion with a weighting percentage of 14.1%; waste transportation with a weighting percentage of 11.7%; waste waiting with a weighting percentage of 9%; and waste excess processing with a weighting percentage of 8.7%. The initial activity time before the repair was 466 minutes (7 Hours 46 Minutes) and after the repair was reduced to 416 minutes (6 Hours 51 Minutes). Based on the Failure Mode and Effect Analysis (FMEA), it is known that the root cause of the problem with the highest waste is Overproduction, namely production planning that is not quite right with a Risk Priority Number (RPN) score of 396. Recommendations for improvements that can be proposed are to carry out production planning using data - historical data that exists and is adjusted to balance the purchasing of raw materials with orders from consumers so that the results of the Overproduction can become a safety stock so that the Overproduction can function in the next consumer order.

Wisnu Alfian Majid; Andung Jati Nugroho

JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI 2023 CV. ALIM'SPUBLISHING

A good facility layout will affect the smooth production process. Preliminary observations on CV Renjana Offset are still not good enough to apply because they do not take into account the degree of closeness. This can be seen from the location of the machine and work stations that look far apart and the existence of intersecting material flows resulting in backtracking, such as the printing work station to the coating work station, the material transfer distance is 12.4 m and has to pass through the garden and back of the CV Renjana Offset office with distances that are too long cause the production time to be longer. The method used to design the layout of production facilities at CV Renjana Offset is the Systematic Layout Planning and Blocplan methods. This method was chosen because it is in accordance with the characteristics of the company and can minimize the distance between production stations and no longer intersecting production process flows. This research was conducted with the aim of knowing and getting an increase in the efficiency of the initial material handling layout with layout suggestions. The results of the calculation of the total area needed for assistance are 171.5 m². The results of SLP and Blocplan processing are 10 alternative layouts and the Adjacency score, R Score, and Rel-dist score feature values ​​are presented for each layout alternative. Of the 5 alternative layouts produced, there is a layout for the production of yearbook products which is chosen as the best layout because it has an Adjacency Score of 1.00, layout 2 has an R Score of 0.87, and the Rel-dist Score of the second layout has a value of 202. Based on three parameters, The selected layout is layout 2. Calculation of distances using the rectilinear method at each facility for the yearbook product layout is 28.29 m.

Dewi Puspasari; Yus Djunaedi Rusli

Transformasi: Journal of Economics and Business Management 2023 Universitas 17 Agustus 1945 Semarang

The quality of a product depends on how the manufacturer applies the supply of raw materials used. The application of a good supply of raw materials can expedite the production process. There are many factors that affect the smooth production process. One of the factors that can affect the smoothness of the production process is the supply of raw materials. Raw materials in the production process include raw materials, semi-finished materials and finished goods. In running its business, Kedai Surabi Gapura experiences difficulties in terms of implementing raw material supplies considering the large number of orders that the shop receives every month so that Kedai Surabi Gapura cannot determine the number of priority raw material needs that must be purchased according to production needs. Surabi Gapura requires an appropriate method of supplying raw materials for production. By applying the raw material inventory classification method, it is hoped that Kedai Surabi can find out the priority classification of raw materials used based on raw material prices, in this case related to capital. Shop owners need to implement raw material inventory planning and control because to find out what the difference is between the costs incurred for purchasing raw materials and the amount of raw material requirements according to the daily production target. In addition to the raw material inventory classification method needed in an effort to expedite the production process, the shop also needs to apply the right raw material ordering method in order to save costs incurred such as transportation costs for sending raw materials, raw material storage costs, ordering costs, raw material maintenance costs arising from inventory. By applying the EOQ method for reordering raw materials, it is hoped that the Surabi Gapura Shop will place orders in economical quantities to determine the point of reordering raw materials so that the costs incurred by the Surabi Gapura Shop are efficient.The research method used in this study is to use a quantitative descriptive method. In this study the method used aims to determine the appropriate method of inventory of production raw materials with the raw material inventory classification method and the correct raw material ordering method in order to save costs incurred such as transportation costs for sending raw materials, raw material storage costs, ordering costs, maintenance costs for raw materials arising from inventory. By applying the EOQ method for reordering raw materials.From the results of calculations using the POM QM For Windows software based on the results of data processing using the ABC class classification analysis method for raw materials from 15 types of raw materials, they can be classified based on their respective classes according to the amount and investment value or rupiah spent to obtain these raw materials. Then by using the calculation of the EOQ method with the POM QM For Windows software, business owners can find out the optimal number of orders in the production process, namely the optimal number of orders is at 8,869.52 units, that is, if the demand in one day is 250 units.

Wahyu Ramadhan Cahaya Firdaus; Aris Heri Andriawan

JURNAL TEKNIK MESIN, INDUSTRI, ELEKTRO DAN INFORMATIKA 2023 Pusat Riset dan Inovasi Nasional

PAL Indonesia is one of the construction companies in the maritime industry that focuses on producing above and below the surface ships which the Indonesian government highly relies on, therefore the safety system there is very strict, including safety lighting. With good lighting, objects can be seen clearly, so that the operation of production equipment and work in the workshop is optimal. However, the company PT. PAL Indonesia has a problem, namely in the warship production workshop, workers often complain because the lighting in the workshop is not bright enough, which causes workers to experience red, watery and sore eyes. Therefore, researchers are interested in analyzing whether the existing lighting standard is in accordance with SNI 03-6197-2000, namely 350lux. From the research that has been done, it is found that the PT PAL workshop with an area of 2700m2 has an average light intensity measurement of 82.22lux, so re-planning is needed to produce a light intensity that is in accordance with the standards. Based on the results of calculations according to standards, 42 light points are obtained with an average lighting of 354 lux which is simulated using the dialux application. The addition of these light points had an impact on increasing electricity bill rates, which were initially IDR 624,575.34 per month to IDR 2,186,013.69 per month.

Kalam Nur Alif; Erifive Pranatal; Minto Basuki

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2023 Fakultas Teknik Universitas Maritim AMNI Semarang

Shipyards are often difficult to find information quickly and efficiently on every component of the workplace. A good information system is actually needed for the work process in the shipyard because the project head's planning for the distribution of the project workload being carried out will result in a smooth production process, which will affect the completion time of the work to be carried out. Each of these stages is the final result stage where at this stage the author will draw conclusions to answer the formulation of the packing report based on writing which is prone to loss and damage. The development of an android-based ship repair information system that can be used to quickly and accurately report data required by the central supervisor allows for full monitoring of the new ship building process, which is standard practice in many shipyards that have a research methodology to solve the problem.    

Arifa Yuriyadi; Siti Muhimatul Khoiroh

Jurnal Kendali Teknik dan Sains 2023 International Forum of Researchers and Lecturers

CV XYZ is a company engaged in manufacturing with production in the form of stacking chairs. This company has a production capacity of 200 units of stacking chairs every day. The company has 3 types of bunk chairs, namely CH-100 KR, CH-200 KR, and CH-200 PC. Customer demand at this company tends to be fluctuating (up and down) which results in the company experiencing difficulties in determining the optimal raw material inventory to meet customer needs. The Material Requirement Planning (MRP) method is an appropriate method for scheduling inventory. The result of this scheduling model is in the form of a master production schedule (JIP) which is used to determine the demand for chair products for the next 6 months. The results of data processing obtained requests for stacking chairs in the next 6 months for the type CH-100 KR 10.724 unit, CH-200 KR of 10.998 unit, and CH-200 PC of 9.687 unit. The demand is then calculated using the MRP approach with LFL and EOQ. An effective material requirements planning method with the lowest cost is to use the Lot For Lot (LFL) method which gives the lowest cost results IDR 7,475,617,611.

Aldito Hermawan; Siti Muhimatul Khoiroh

Jurnal Kendali Teknik dan Sains 2023 International Forum of Researchers and Lecturers

Company CV. AM Nanda Putra is located in Sidoarjo and operates in the scaffolding industry. Currently the company is experiencing losses due to a lack of optimization in planning the amount and time of ordering raw materials, which results in shortages and excess material inventory. To overcome this problem, the company uses the MRP (Material Requirement Planning) method in optimizing raw material planning. In terms of the lot sizing approach, the company applies the LFL and EOQ methods. The forecasting methods used are Moving Average (MA), Weight Moving Average (WMA), and Exponential Smoothing (ES). The smallest MAD results were obtained using the Exponential Smoothing (ES) method for all scaffolding products. The forecasting results are obtained to determine the MPS (Master Production Schedule) for the next 10 months. After the determination of  MPS, the results of Material Requirement Planning (MRP) were obtained, namely the supply of raw materials for MF 170 AM scaffolding of 35402 units or 17700 sets, MF 170 K1 scaffolding of 28906 units or 14453 sets, MF 190 AM scaffolding of 16250 units or 8125 sets, and MF 190 K1 scaffolding of 7656 units or 3828 sets. From the results of calculating the cost of raw material requirements using the Lot for Lot (LFL) method and the Economic Order Quantity (EOQ) method, it can be seen that the total cost of planning the smallest raw material inventory with an amount of Rp. 12,975,818,022.