Publication Search

56,082 articles from 441 journals · 1,579 citations tracked

Showing 41-44 of 44

Analytics

Giano Surya Pamungkas; Erwin Syahputra; Anita Sumelvia Dewi

Transformasi: Journal of Economics and Business Management 2023 Universitas 17 Agustus 1945 Semarang

Employee performance in a company that is not well managed can be one of the obstacles to company activities in achieving its goals. The purpose of this study is to explain the effect partially and simultaneously skills and work culture on employee performance. This type of research uses quantitative research. Source of data in this study using primary data and secondary data. The sample in this research is 40 employees of UD. Indokey uses a saturated sampling technique in which researchers use all UD employees. Indokey is a sample. The analysis technique used is validity test, reliability test, normality test, linearity test, multicollinearity test, heteroscedasticity test, t test, F test, multiple linear regression analysis, and coefficient of determination test (R2) using the SPSS version 25 program. The results of this study are that partially the skill variable has a positive and significant effect on the performance of employees at UD. Indokey, partially the work culture variable has a positive and significant effect on the performance of employees at UD. Indokey and simultaneously stated that the variable skills and work culture have a significant effect on the performance of employees at UD. Indokey

Farah Dina Eka Syamriati; H. Sulbahri Madjir; Djatmiko Noviantoro

Jurnal Publikasi Ilmu Manajemen 2022 Pusat Riset dan Inovasi Nasional

This study aims to determine and prove the influence of leadership, work environment and compensation on work productivity of employees of the Class II Railway Engineering Center for Southern Sumatra Region with Job Satisfaction as an Intervening Variable either directly or indirectly. The population in this study were all employees of the Class II Railway Engineering Center for the Southern Sumatra Region, while the sample was part of the population that would be the object of research. In this study, the total population was 91 people. Sampling in this study used the Saturated Sample technique, namely sampling was carried out as a whole from the total population. In line with the opinion above, in this study, by considering a population of 91 people, the authors took a total of 91 people as research samples. The data analysis used in this study was to use the Structural Equation Model (SEM) analysis method which was operated through the Partial Least Square (PLS) program.

Farina Jessen Yap; Ronauli Fransiska Pasaribu

Jurnal Manajemen dan Ekonomi Bisnis 2022 Pusat Riset dan Inovasi Nasional

This research was conducted at PT. Bangun Makmur Medan. Work productivity that has not reached the company's target because there are still shortcomings that occur to employees when viewed with data in the last 5 years, not all employees can achieve work productivity targets that have not reached the company's target because there are still shortages that occur when viewed with data in 5 years Finally, not all employees can reach the target. Compensation is still very low due to the bonuses made by companies that have not been maximal for employees who have worked optimally. Employees are not satisfied with what they receive from their co-workers who cannot work together and the lack of opportunities for employees to get promotion opportunities and the amount of bonuses received is not yet in line with expectations because the bonuses made by the company are not maximized with employees who have worked optimally. The population is 129 employees and the sample in this study was 98 employees. The sampling technique used is sample random sampling. The technique of collecting data is by pembainigain kueisoner, interviews and documentation studies. Data analysis uses validity and reliability test, classic assumption test, multiple linear regression analysis, determinant coefficient and hypothesis testing.Conclusions in the study that simultaneous Compensation and Job Satisfaction influence the Work Productivity of PT. Bangun Makmur Medan. Partially Compensation and Job Satisfaction influence the Work Productivity of PT. Bangun Makmur Medan. Partially Job Satisfaction influences the Work Productivity of PT. Bangun Makmur Medan. The magnitude of the coefficient of determination that value .10 means compensation and job satisfaction can explain employee work productivity by 31% and the remaining 69% (100-31) is influenced by other variables outside of this study such as: work motivation, career development, work environment and so on

Rangga Aditya Widodo; Haryani Haryani

JURNAL EKONOMI MANAJEMEN AKUNTANSI 2021 sekolah Tinggi Ilmu Ekonomi Dharma Putra Semarang

The desired objective of this research activity is to examine and analyze the effect of compensation, motivation and job satisfaction on the work productivity of employees at PT. Nusantara Plantation IX Ngobo Ungaran Plantation. The population in this study were all production employees at PT. Nusantara Plantation IX Ngobo Ungaran Plantation, totaling 50 people. In this study, samples/respondents were taken from the entire population of 50 respondents, using saturated sampling techniques. Based on the discussion, the following conclusions can be drawn: Testing the compensation hypothesis on employee work productivity shows that the value of t count = 2.805 > t table = 1.684 with a significance number = 0.007 <α = 0.05 (significant). Thus, the hypothesis (H1) that compensation has a positive effect on employee work productivity is proven. Testing the hypothesis of motivation on employee productivity shows that the value of t count = 3.972 > t table = 1.684 with a significance number = 0.000 < α = 0.05 (significant). Thus, the hypothesis (H2) that motivation has a positive effect on employee work productivity is proven.