Rishi Mardiningsih; Shafira Cournnyus Dwi Arta Gracia; Eko Muliawan Satrio; Kartono Wibowo

Jurnal Riset Rumpun Ilmu Teknik 2026 Pusat riset dan Inovasi Nasional

Construction project control requires careful planning to avoid delays and cost overruns. This study aims to evaluate the performance of the CBT Laboratory Building construction project at the Faculty of Medicine, Wahid Hasyim University, Semarang, in terms of cost and time using the Earned Value Analysis (EVA) method, and to analyze acceleration alternatives using the crashing method. The method used is a quantitative approach with a case study, based on project data such as the Budget Plan (RAB), S-curve, and work progress reports. The analysis was carried out using the Earned Value Analysis (EVA) method to assess project performance in terms of cost and time through indicators such as CV, SV, CPI, and SPI. Furthermore, an acceleration analysis was conducted using the crashing method to determine the optimal alternative for overcoming project delays by considering time and cost efficiency. The results of the Earned Value Analysis indicate that the project experienced delays and cost overruns, as shown by SPI < 1 and CPI < 1. The estimated project completion time increased to 227 days, longer than the initial plan of 217 days, while the estimated final cost reached RP 5,451,241,064.85, exceeding the initial budget. Acceleration efforts using the crashing method show that adding adding labor is more efficient than working hours (overtime), resulting in a project duration of 212 days with lower costs of RP 5,658,221,364.08. Thus, the Earned Value Analysis method is effective for evaluating project performance, while crashing can be a solution for acceleration by considering time and cost efficiency.

Eka Shodiq Permadi; Hanie Teki Tjendani; Budi Witjaksana

International Journal of Industrial Innovation and Mechanical Engineering 2025 Asosiasi Riset Ilmu Teknik Indonesia

Prolonged road damage disrupts community mobility, logistics activities, and reduces road user safety. The road maintenance project on Jl. Ir. Soekarno in Blitar City, which was planned to be completed in 120 days with a budget of Rp1.16 billion, experienced a delay of 8 days due to time management constraints. This study aims to evaluate the use of the Time Cost Trade Off (TCTO) method to accelerate project completion without reducing the quality of work. The TCTO method is used to analyze the relationship between time and cost. This research proposes additional overtime working hours of 2 hours per day with the assumption of resources according to the Cost Budget Plan (RAB). The results show that with this method, the project can be completed in 117 days at a total cost of Rp1,342,177,724. Although it requires additional costs, this acceleration allows the project to be completed faster than the previous condition

Eka Fitriana; Lydyana Trisnaeni Martin; Nur Aulia Lathifah; Roselia Ariyanti; Kuswan Hadji

Public Service And Governance Journal 2025 Universitas 17 Agustus 1945 Semarang

This research analyzes the legal provisions regarding the obligation to pay overtime wages and legal options for workers if the company fails to provide overtime compensation. Overtime wages are the right of workers regulated in Law No. 13 of 2003 concerning Manpower which has been amended by Law No. 6 of 2023 and Government Regulation No. 35 of 2021. This study uses a case analysis of PT X in Semarang, which was accused of not paying overtime wages in full to its employees. The findings show that despite clear legal regulations, implementation faces various obstacles, such as inadequate supervision and lack of legal awareness. Employees whose rights are not met can pursue out-of-court (e.g. bipartite negotiation, mediation, conciliation, arbitration) and court channels through the labor court. Non-compliance with regulations on overtime pay not only impacts the economic situation of employees, but also causes imbalances in labor relations. This research recommends strengthening the labor inspection system, increasing transparency in the handling of working hours, increasing legal awareness among employees, and developing a more accurate time recording system to ensure the fulfillment of employee rights according to the applicable regulations.

Silfiati Rohmah; Yunita Primasanti; Agung Widiyanto Fajar Sutrisno

Venus: Jurnal Publikasi Rumpun Ilmu Teknik 2025 Asosiasi Riset Ilmu Teknik Indonesia

Turnover intention is the tendency or intention of individuals to leave the organization for various reasons, one of which is the desire to get a better job. This study aims to examine the effect of overtime working hours and leader member exchange on turnover intention of finishing department employees of PT Ungaran Sari Garments. The sample taken was 144 finishing department employees. The sampling technique used the slovin formula with data analysis techniques, namely multiple linear regression using the SPSS 25 program. The results obtained that overtime working hours have a positive and significant effect on turnover intention, while lmx has a negative and significant effect on turnover intention. overtime working hours and leader member exchange have a simultaneous or joint effect on the dependent variable, namely turnover intention of pt usg finishing department employees.

Wolfgang Alexander Defara; M. Imam Firdaus; Trisnowati Rahayu; Sutoyo Sutoyo

Jurnal Riset Rumpun Ilmu Teknik 2025 Pusat riset dan Inovasi Nasional

This study aims to analyze the impact of overtime work on physical and mental fatigue of the crew of the MV ship. Manalagi Tisya, by identifying the causal factors and consequences that may arise due to additional working hours. In this study, the researcher will apply a qualitative research method with a descriptive approach. This research was conducted by the author on the MV ship. Manalagi Tisya owned by PT Pelayaran Manalagi which is a subsidiary of PT Salam Pacific Indonesia Lines, with the ship call sign "YBTL2" and a total load capacity of 52201 MT. Data collection techniques in this study used observation, interviews and documentation. Data analysis techniques used data reduction, data presentation, drawing conclusions. Testing the validity of this research data used source triangulation, technical triangulation, and time triangulation. Based on the results of the study, it explains that the Overtime Pattern: The crew of the MV ship. Manalagi Tisya experienced an average of 4.5 hours of overtime per day, with the Engine Department experiencing the highest overtime (an average of 5.2 hours). Overtime most often occurs during loading and unloading at the port (35%) and when facing bad weather (27%), Physical Impact: Continuous overtime causes significant physical impacts in the form of sleep disturbances (80%), back and waist pain (70%), and muscle pain (60%), Mental Impact: As many as 85% of crew experience moderate to severe mental fatigue due to overtime, with the main symptoms being difficulty concentrating (75%), irritability (65%), and decreased decision-making ability (60%). Safety: There is a strong positive correlation (r = 0.82) between the duration of overtime and the frequency of safety incidents. The risk of incidents increases by 28% for every additional 2 hours of overtime, Work Performance: Overtime has an impact on decreased work performance, especially in problem-solving skills (45%), compliance with procedures (41%), and effective communication (37%), Overtime Management: The most effective overtime management strategies are task rotation and fatigue management training, but their implementation is still not optimal. Limited number of personnel and operational demands are the main obstacles in minimizing overtime, Regulatory Compliance: Average working hours of MV ship crew. Keywords: Overtime Work, Physical Fatigue, Mental Crew.

Eka Shodiq Permadi; Hanie Teki Tjendani; Budi Witjaksana

Road maintenance is a strategic effort to support community mobility and economic development. This study aims to determine the optimal duration and analyze the cost impacts of implementing the Time Cost Trade Off (TCTO) method. The method is applied through critical path analysis and adding overtime hours to reduce the project duration. Data is collected from project documents such as daily reports, S-curves, and cost budget plans, then analyzed using Microsoft Project software. The results show that the project duration can be shortened to 117 days with an additional cost of IDR 176,614,724.00, which is lower than the potential delay penalty of 1% per day. This adjustment leads to a time savings of 8.6% without causing significant changes to the project's organizational structure. The TCTO method proves to be a practical solution for addressing delays while maintaining a balance between time and cost.

Afnan Ashiddiq Virgatara Setyawan; Titin Sundari; Totok Yulianto; Meriana Wahyu Nugroho

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2024 Asosiasi Riset Ilmu Teknik Indonesia

Time Schedule is used as a guide and control tool for work execution time and productivity of workers, work tools on the project. In terms of productivity control, there are several aspects involved in the monitoring system, such as materials, tools, resources, and scheduling of project activities. Scheduling is the arrangement of resources to complete tasks in achieving targets. by involving components of activities, and time, In order to determine the optimal scheduling and budget. in accordance with time and cost limitations, this study uses the PDM (Precedence Diagram Method) method and the Crashing method through alternative scheduling with the addition of overtime of 1 hour, 2 hours, and 3 hours and knowing the acceleration cost. for each alternative. The results of the acceleration alternative with optimal costs are, alternative 1 adding 1 hour of overtime, the total cost decreased by 0.19% to Rp 3,067,337,201, -. This means that alternative 1 saves costs of Rp 5,984,598, - and is estimated to be one day faster to 119 days.

Bintara Putra Dicya; Endang Pudji Widjajati

Jurnal Kendali Teknik dan Sains 2024 International Forum of Researchers and Lecturers

This research aims to analyze the workload of TruLaser Trumpf 3030 machine operators at PT. XZY using the Full Time Equivalent (FTE) Method. Data collection was carried out through interviews, direct observation, and lead time measurements in the Preparation Department, especially on the Trumpf TruLaser 3030 Machine. The results of the analysis showed variations in FTE values ​​over 3 days for 1 machine operator for 8 working hours. Although the majority of FTE values ​​are below the overload value, there is one case where the FTE value on September 20 2023 is 0.861, below the required standard. The conclusion shows that there is no problem of work overload for the Trumpf TruLaser 3030 machine operator, however, overtime or overtime is planned by the PPIC/Planner team to achieve production targets. Factors such as machine speed, machine errors, equipment delays, and hampered production processes cause operator idle time. The recommended solution is to maintain and repair machines regularly, plan a more efficient work flow, prepare materials well, improve facilities for material handling, and carefully plan the production process. To overcome idle time, it is recommended to provide additional work such as training for interns or administrative work during shift changes or the next day.            

Darmilisani Darmilisani; Dian Yulis Wulandari; Yohanes Parsaoran Tamba

Proceeding. of The International Conference on Business and Economics 2024 Universitas 17 Agustus 1945 Semarang

A person who achieves the best performance will be appreciated by the company with good rewards. And with poor performance, will get punishment. The extent to which they can give their best performance depends on how they want to improve their competence and willingness (motivation) to do their best work. The purpose of this study is to improve community performance through salary, work environment, and labor training in Sunggal District, Deli Serdang. This research is a qualitative descriptive study using the literature review method through library studies based on previous research journals. The results of this study explained that several things can improve community performance in Sunggal District, Deli Serdang Regency such as the amount of income or salary, a supportive work environment, and job training needed to improve skills and knowledge at work. To achieve an improved quality of community performance, it is necessary to do several things, namely reviewing the amount of salary as a reward to the community and paying overtime hours reasonably by the overtime time used, reviewing the workforce training program which is considered less attractive, unclear direction and objectives, so that interest in participating in the workforce training program is low. And open the widest possible space for outstanding people to get promoted to a higher career level.

Andri Herlambang; Yuli Setiawannie; Nita Marikena

Ekspresi : Publikasi Kegiatan Pengabdian Indonesia 2024 Asosiasi Seni Desain dan Komunikasi Visual Indonesia

Measuring the company level of productivity performance is a very important thing to do to see and evaluate achievements and improvements to productivity levels that are not yet optimal. This case study was taken from the leather bag UKM which is currently experiencing a decline in productivity during the 2020 period. With the increase in working hours, the company must increase workers' overtime costs. In this research, the method used to measure the level of company productivity is the objective matrix or OMAX method and this research refers to the OMAX steps, namely determining productivity criteria on the production line, determining weights, determining levels on the objective matrix, calculating the productivity index, and productivity analysis with a traffic light system. The research results show that the average value of overall productivity in 2020 is 4,388 The highest productivity index was achieved in August amounting to 67,01%. From the traffic light system, it is known that the worst indicator of productivity is the defect factor, so improvements need to be made regarding this.

Widiawati Widiawati; Etika Sabariah

JUREKSI (Journal of Islamic Economics and Finance) 2023 STIKes Ibnu Sina Ajibarang

 The background in this study is how important a leader is in applying motivation and work rewards to the company to improve the performance of his employees, because with motivation and work discipline, employees will feel responsible for all their duties. This study aims to determine the effect of work motivation and work rewards on employee performance partially, and to determine the effect of work motivation and work discipline on employee performance simultaneously. The conclusion from the results of this study is that increasing employee performance is inseparable from Work Motivation (needs, attitudes, abilities, payment or salary, job security, relationships with fellow workers), work rewards (providing overtime or wages given to employees) and employee performance (always arriving on time, always prioritizing attendance percentage, always obeying the provisions of working hours, always using working hours effectively and efficiently).

Thamrin Mansyur; Ahmad Ridwan; Muhammad Sanusi; Muhammad Ersadunas

Journal Innovation in Education (INOVED) 2023 STIKes Ibnu Sina Ajibarang

The aims of this study were 1) to determine the human resource management compensation system in education at MTs Nurul Huda Kempas Jaya Village, 2) to determine the inhibiting and supporting factors for the human resource management compensation system in education at MTs Nurul Huda Kempas Jaya Village, 3) to determine the implementation of the human resource management compensation system in improving teacher performance at MTs Nurul Huda Kempas Jaya Village. This type of research is field research, namely research conducted directly with the object of research and data collection is carried out in the field. Researchers are trying to uncover Public Relations Strategies in Increasing New Students at Madrasah Tsanawiyah Nurul Huda Kempas Jaya Village for the 2020/2021 Academic Year. The results of this study are (1) the human resource management compensation system in education at MTs Nurul Huda Kempas Jaya Village is all income in the form of money, direct and indirect goods received by teachers as compensation for services provided to MTs Nurul Huda Kempas Jaya Village . This compensation takes the form of salary, benefits, incentives, and benefits. (2) Inhibiting factors: delays in giving salaries because many SPP payments are in arrears and there are bailouts, there is often overtime work outside working hours so that more funds are needed for payment, employees are often absent without prior coordination so working hours are not filled by officers this results in reduced compensation. Supporting factors: not a large number of educational and educational staff so it is easier to coordinate internally. (3) Implementation of a human resource management compensation system in improving teacher performance, namely at MTs Nurul Huda Kempas Jaya Village, the provision of compensation can be said to be effective in increasing the performance of teachers and employees. Teachers feel more responsible for carrying out their duties and performance appraisals that can improve employment status can have an impact on the welfare obtained and continue to motivate teachers in carrying out their duties. The better the performance appraisal of a teacher, the increase in status and compensation received can be considered.

Bagas Ramadhani; Wateno Oetomo

Jurnal Sipil Terapan 2023 Fakultas Teknik Universitas Cenderawasih

The purpose of this study is to determine labor productivity against costs and time of implementation of the Watudakon River DPT project development work. The results of this study are the large number of labor productivity in the construction work of the Watudakon River DPT project, Mojokerto. With the results of calculating the overall productivity level, namely with an average of 2,228 m³/day, assuming 25% of formwork material shunting work and 75% installation of formwork, the calculation data is in accordance with what is carried out in the field. Duration of implementation according to a survey conducted on DPT Sungai Watudakon construction work, Mojokerto with an average value of duration for installation of pile cap formwork 1.013 days/hour, and for installation of DPT wall formwork 1.00 days/hour, then for pile repair work DPT cap and wall 1.00 days/hour, and also for pile cap casting work 1.166 days/hour, for DPT wall casting work 1.312 days/hour. The conclusion in this study is that the productivity of the workforce working hours is in accordance with the realization in the field and that work results can be increased by adding working hours or overtime.

Alden Nelson; Adeline Oktalia; Emilya; Lia Willyanto; Monica Ella

JURNAL ILMIAH EKONOMI DAN BISNIS 2023 LPPM Universitas Sains dan Teknologi Komputer

Provision of good working hours in accordance with standards must be maintained by businesses to fulfill all their goals, including the Indonesian manufacturing industry. The manufacturing industry in Indonesia must prioritize work standards, because these factors greatly affect a company's ability to achieve its goals. The purpose of this study was to determine the effect of working hours and overtime on resource management with industrial relations, to analyze working hours to attract employees and to analyze the calculation of employee wages. The author uses a qualitative descriptive method in this study. The result of this research is that everyone involved in industrial relations must understand the rules of the game and other regulations that apply in Indonesia. In terms of working hours or overtime policies, developing the quality of human resources, absenteeism and leave policies, and salary increases that are in accordance with industry standards, can improve employee welfare and productivity and maintain competitiveness in a company.

Kukuh Yulianto; Dety Mulyanti

JURNAL EKONOMI MANAJEMEN AKUNTANSI 2023 sekolah Tinggi Ilmu Ekonomi Dharma Putra Semarang

Productivity is something that many companies want to achieve, which will later affect the company's output in the form of results obtained, one of which is company profit, productivity is an indicator of employee performance at PT. XYZ, measured by the number of results obtained from daily activities which will impact on work results which will later be used as billing equipment for work results to customers. Taking a sample of employees in the report generation unit, the result is that the more working hours that employees go through will affect productivity the following day, this is due to employee eye fatigue working on reports in front of a computer screen. The more hours worked with additional overtime hours, the productivity will decrease.