SciRepID - Scientific Publication Search

Publication Search

44,347 articles from 397 journals · 1,447 citations tracked

Showing 1-20 of 70

Analytics

Moh Agung Maulana Iswanto; Cici Widya Prasetyandari; Yeni Kartikawati

Pemberdayaan Masyarakat: Jurnal Aksi Sosial 2025 Lembaga Pengembangan Kinerja Dosen

The welfare of the community in the economic sector is one of the benchmarks for the welfare of the community, there are many people who experience poverty which is motivated by economic factors, the national amil zakat agency offers the jatim Makmur program. a program that really needs manpower considering that there are several workshop equipment that must be distributed to mustahik to do business. The method of assistance in the activities carried out by the national amil zakat agency of East Java province is an annual program activity, namely the Makmur program, which is carried out from July 14-16. One of the programs of the national amil zakat agency of East Java province, namely the Makmur program, is a program that moves in the economic field, which has two objectives, namely the development and empowerment of the economy in the community, the Makmur program distributes work equipment assistance z auto, some of the work equipment assistance distributed is among others such as Grobak workshops, workshop tools, other than that the amil zakat agency not only provides assistance in the form of z auto repair shop equipment but along with the basic materials needed by the workshopsuchas stock oil, andso on, the distribution of work equipment assistance Z auto Makmur jatim program has a positive value for the community, namely providing benefits regarding the empowerment and development of mustahik so that z auto repair shop business actors are able to become muzakki and donate a little of their wealth to people in need, assistance in the distribution of the jatim Makmur program is in accordance with the category of 8 asnaf at least with the category of poor or underprivileged people.

Moh Agung Maulana Iswanto; Cici Widya Prasetyandari; Yeni Kartikawati

Pemberdayaan Masyarakat: Jurnal Aksi Sosial 2025 Lembaga Pengembangan Kinerja Dosen

The welfare of the community in the economic sector is one of the benchmarks for the welfare of the community, there are many people who experience poverty which is motivated by economic factors, the national amil zakat agency offers the jatim Makmur program. a program that really needs manpower considering that there are several workshop equipment that must be distributed to mustahik to do business. The method of assistance in the activities carried out by the national amil zakat agency of East Java province is an annual program activity, namely the Makmur program, which is carried out from July 14-16. One of the programs of the national amil zakat agency of East Java province, namely the Makmur program, is a program that moves in the economic field, which has two objectives, namely the development and empowerment of the economy in the community, the Makmur program distributes work equipment assistance z auto, some of the work equipment assistance distributed is among others such as Grobak workshops, workshop tools, other than that the amil zakat agency not only provides assistance in the form of z auto repair shop equipment but along with the basic materials needed by the workshopsuchas stock oil, andso on, the distribution of work equipment assistance Z auto Makmur jatim program has a positive value for the community, namely providing benefits regarding the empowerment and development of mustahik so that z auto repair shop business actors are able to become muzakki and donate a little of their wealth to people in need, assistance in the distribution of the jatim Makmur program is in accordance with the category of 8 asnaf at least with the category of poor or underprivileged people.

Maya Sofiana; Ulfi Pristiana; Estik Hari Prastiwi

International Journal of Entrepreneurship and Management 2025 Asosiasi Riset Ilmu Manajemen Kewirausahaan dan Bisnis Indonesia

This study aims to determine and analyze service waiting times, identify the root causes of long queues, and develop a strategy to improve service performance at the 5361137-gas station (SPBU) at the Surabaya-Gresik Toll Rest Area. The research method used is a mixed-methods approach with an exploratory sequential design. This study combines quantitative analysis using Queuing Theory to measure system performance (arrival rates and service times) and descriptive qualitative analysis using a Fishbone Diagram. Data were collected through direct observation, interviews, and g-form techniques. The results indicate that the current queuing system performance is in a critical or severe condition, indicated by a server utilization rate of 0.94 to 1.02 during peak hours. The average time spent by vehicles in the system is 14.3 minutes, of which 9.6 minutes (67%) is spent waiting in the queue. Fishbone diagram analysis revealed that the root cause of the main problem lies in the complex interaction of factors: Machine factors (EDC signal failure and pump repair downtime), Human and Method factors (implementation of static shifts and reactive maintenance), and Environmental factors (narrow layouts that hinder large vehicle maneuvers). As a solution, this study formulated a hybrid improvement strategy that includes short-term business process engineering (the use of Floating Staff and lane segregation) and long-term investment in additional pumps to change the queuing model from Single Channel to Dual Channel. This strategy is expected to reduce the utility level to a safe zone below 0.80 with a target waiting time of 3–5 minutes.

Muhammad Yusuf Prayitno; Syamsul Hadi; Bagus Prakoso; David Avelino Anugerah Krishna Pamungkas; Ahmad Zulfa Sibro Malisi

Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri 2025 Asosiasi Riset Ilmu Teknik Indonesia

The decline in the performance of the die casting machine in 1998 after a long period of producing copper terminals showed dimensional defects and instability in product quality, especially in nozzle clogging, reduced copper flow, crust buildup on the gooseneck, plunger movement obstruction, and hydraulic pressure leaks. The purpose of planning the replacement and repair of die-casting machine components is to obtain replacement and repair costs, replacement and repair schedules for the period 2026, and the ratio of maintenance costs to profits. The replacement and repair planning method includes collecting previous maintenance data, applying the inspection-replace-repair-overhaul (IRRO) method, evaluating component conditions, predicting component service life, predicting labor costs, predicting supporting equipment to be used in maintenance, predicting the time to replace spare parts or reinstall repaired components, estimating replacement and repair costs for the period 2026, and calculating the ratio of replacement and repair costs to profits. The planning results obtained replacement and repair costs for the 2026 period are 75.770.000,- IDR with an estimated die casting machine rental rate of  1,500,000 IDR/hour which has the potential to be rented for 1,200 hours/year, and the ratio of maintenance costs to profits is 10,02 % which implies that the die casting machine with a capacity of 40 units/hour is still suitable for use and has the prospect of generating profits for the next few years.

Reza Nandhika Putra Wijaya; Syamsul Hadi; Mochammad Reza Maulana Ramadhon; Bintang Erlangga; Yohan Nur Azizi +1 more

Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri 2025 Asosiasi Riset Ilmu Teknik Indonesia

The problem with a 4-stroke gasoline engine-driven electric generator is a decrease in tool performance due to wear on important components for the stator, cooling fan, air filter, oil filter, and gasket. The purpose of component replacement planning is to obtain replacement costs, maintenance schedules in 2027, and the ratio of maintenance costs to profits. The component replacement planning method includes collecting maintenance data from previous years, applying the inspection-replace-repair-overhaul (IRRO) method, assessing component conditions, predicting component lifespan, predicting labor costs, predicting supporting equipment to be used in maintenance, predicting spare part replacement times, predicting maintenance costs in 2027, and calculating the ratio of maintenance costs to profits. The results of the replacement planning obtained maintenance costs in 2027 amounting to IDR 570,007,- with an estimated electric generator rental rate of IDR 30,000,-/hour which has the potential to be rented for 128 hours/year, a profit of IDR 3,840,000,- was obtained, and the ratio of maintenance costs to profits was 14.84% which implies that a 2.5 kW electric generator that uses gasoline-pertalite fuel of around 1.5 liters/hour at maximum power is still suitable for use in the next few years and has the potential to generate profits.

Muhamad Dwi Kurniawan; Syamsul Hadi; Muhammad Rangga; Fernanda Yudha Firmansyah; Marcellino Yoga

Venus: Jurnal Publikasi Rumpun Ilmu Teknik 2025 Asosiasi Riset Ilmu Teknik Indonesia

The problem with a passenger car with a capacity of 15 people lies in its unscheduled maintenance and having broken down on the road. The purpose of component replacement planning is to obtain component replacement costs, maintenance and repair schedules for the 2026 period, and the maintenance cost-to-profit ratio. The planning method includes collecting previous maintenance data, applying the inspection-replace-repair-overhaul (IRRO) method, evaluating component conditions, estimating component lifespan, estimating labor costs, estimating supporting equipment to be used in maintenance, estimating the time to replace spare parts or reinstall repaired components, estimating maintenance and repair costs for the 2026 period, and calculating the maintenance cost-to-profit ratio. The results of component replacement planning obtained costs for the 2026 period are IDR 11,780,000 with an estimated passenger car rental rate of IDR 800,000/24 ​​hours (day) which has the potential to be rented for 4,320 hours/year, and the ratio of maintenance costs to profits is 10.33% which implies that passenger cars with a capacity of 15 people are still prospective to generate profits and are suitable for use for the next few years.  

Widdi Haddiq Firmansyah; Syamsul Hadi; Rikhy Sambora; Zidhan Muhammad Akbar; Mochammad Dimas Awalludin

Venus: Jurnal Publikasi Rumpun Ilmu Teknik 2025 Asosiasi Riset Ilmu Teknik Indonesia

Unexpected downtime of a 2 kg/hour coffee grinder is crucial in cafe operations, thus less guaranteeing the availability of the grinder. The purpose of component replacement and repair planning is to obtain a prediction of the maintenance and repair schedule and costs in the 2026 period. The component replacement planning method includes collecting previous maintenance and repair data, applying the inspection-replace-repair-overhaul (IRRO) method, assessing component conditions, predicting component life, predicting technician costs, predicting supporting work equipment and supporting materials to be used in maintenance, predicting the time to replace spare parts or reinstall components after repair, estimating maintenance and repair costs for the 2026 period, and calculating the ratio of maintenance costs to profits. The results of component replacement and repair planning obtained maintenance costs for the 2026 period are IDR 2,350,000, - with an estimated coffee grinder rental rate of IDR 25,000/hour which has the potential to be rented for 1440 hours/year, and the ratio of maintenance costs to profits is 6.5% which implies that the coffee grinder with a capacity of 2 kg / hour is still suitable for use for the next few years and still has the opportunity to make a profit.

Muhammad Raihan Abdillah; Syamsul Hadi; Rio Asyahdiky Al Faiz; Dhea Septa Ristiana; Khoirul Anam +1 more

Venus: Jurnal Publikasi Rumpun Ilmu Teknik 2025 Asosiasi Riset Ilmu Teknik Indonesia

The problems encountered are damage to the rubber wheel mount and universal/cross joints on the 90 m/hour capacity wood profile making machine, which can affect the uniformity and speed of wood profile making. Maintenance and repair planning aims to be able to create a maintenance and repair schedule for the 90 m/hour capacity wood profile making machine for the period 2026, estimate maintenance costs and the ratio of maintenance and repair costs to machine profits. The maintenance planning method includes collecting maintenance data from previous maintenance periods, reviewing the specifications of the wood profile making machine, estimating the age and price of components that are estimated to be damaged, estimating the cost and duration of dismantling and installing components that have been repaired in accordance with the provisions of the requirements for usable components or replacement spare parts, scheduling maintenance and repairs, estimating maintenance and repair costs for the period 2026, and determining the ratio of maintenance costs to profits. The planning results in the form of a maintenance-repair schedule for the period 2026; maintenance and repair costs in 2026, the ratio of maintenance costs to profits, and their implications indicate that the machine is still prospective and usable.

Adesta Dermawan Wicaksono; Syamsul Hadi; Asset Cahya Wardhana; Ajang Deng Arok; Atem Juacg Kelei Juach

Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri 2025 Asosiasi Riset Ilmu Teknik Indonesia

The problem faced is the decline in the performance of a 650 liter/minute centrifugal pump due to wear on components, especially the impeller, rolling bearings, and mechanical seals in supplying process water and clean water in industrial production systems. The planning objective is to obtain a maintenance schedule for a 650 liter/minute centrifugal pump for the operational period of 2026 and the ratio between maintenance costs and profits generated by the machine. The maintenance planning method includes collecting maintenance data from previous maintenance periods, reviewing centrifugal pump specifications, applying the inspection, replace, repair, and overhaul (IRRO) approach, estimating the age and price of components that are expected to be damaged, estimating the cost and duration of dismantling and installing components that have been repaired in accordance with the provisions of the requirements for usable components or replacement parts, scheduling maintenance and repairs, estimating maintenance and repair costs for the 2026 period, and determining the ratio of maintenance costs to profits. The planning results are in the form of a maintenance schedule for the 2026 period worth IDR 4,290,000,-, a maintenance cost to profit ratio of 7.44% and the implications indicate that the machine is still suitable for use and prospective for operations in the next few years.  

Fellezia Rahel Violeta Felle

Jurnal Riset Rumpun Matematika dan Ilmu Pengetahuan Alam 2025 Pusat riset dan Inovasi Nasional

Corrective maintenance is one of the maintenance strategies performed after system failures or malfunctions occur, particularly in diesel power plants (PLTD) that play a crucial role in supplying electricity to remote areas such as Jayapura. This study aims to identify the types of failures occurring in diesel engines at the Jayapura PLTD and to evaluate the corrective maintenance actions implemented. Data were collected through direct observation during an internship program, interviews with technicians, and analysis of historical maintenance and failure records. The results indicate that the most common failures occurred in the lubrication system, fuel system, and cooling system. Corrective actions included component repairs, spare part replacements, and system adjustments. The application of timely and appropriate corrective maintenance significantly reduced machine downtime and improved the reliability of the power generation system. This study recommends integrating corrective and preventive maintenance strategies to maximize operational efficiency of the PLTD.

Rekiana Jati Kusuma, Rekiana; Basuki, Minto

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2025 Fakultas Teknik Universitas Maritim AMNI Semarang

In this case, it refers to the purpose of the content in this final assignment, namely by compiling a schedule for the Implementation of KM.Mutiara Ferindo 5 Ship Maintenance during the docking process at the PT.PAL Indonesia shipyard. Making a schedule includes what components are repaired while the ship is in the shipyard, making a schedule for managing ship maintenance that has been carried out at the shipyard. The data used in this thesis is data from PT.Antosim Lampung Pelayaran Surabaya and the researcher himself. The type of data used in this study is Primary data, in this Primary data the researcher will obtain data obtained directly from the statements of the workers who will be related to the problem being studied and the results of questionnaires distributed to several employees related to this study. In the implementation of repairs, there is a list of jobs that show how many work items must be done. So this list of jobs has been approved to be carried out in the ship repair process. The repair work of the KM. Mutiara Ferindo 5 ship which carries out planned repairs both at the shipyard and when the ship anchors at sea carries out technical and economical maintenance. Repair work on RO-RO vessels involves extensive maintenance, as determined by the ship's office and authorized crew members. The repair work on the KM Mutiara Ferindo 5 was well-planned, including safety equipment and components that play a crucial role in the smooth operation of the ship (maintenance of the entire engine room, deck, safety equipment, and maintenance of the ship's interior and exterior). An economic system was implemented to estimate the remaining funds after maintenance at the shipyard.

Rismansyah Rismansyah; Syamsul Hadi; Muhammad Fauzan Hidayatu Ar Rijal; Venus Linggar Pribumi; Wildhan Hidayatullah

Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan 2025 Asosiasi Riset Ilmu Teknik Indonesia

The problem with the coconut grater machine is that the machine has decreased performance after being used for several years, especially in the mechanical components (electric motor, V belt, Pulley, grater knife, hopper) and its electricity. The purpose of maintenance and repair planning is to obtain costs, maintenance and repair schedules for the period 2026, and the ratio of maintenance costs to profit. The maintenance and repair planning method includes collecting previous maintenance data, applying the inspection-replace-repair-overhaul (IRRO) method, evaluating component conditions, predicting component lifespan, predicting labor costs, predicting supporting equipment that will be used in maintenance, predicting the time to replace spare parts or reinstall repaired components, estimating maintenance and repair costs for the 2026 period, and calculating the maintenance cost to profit ratio. The results of maintenance and repair planning obtained maintenance costs for the 2026 period were IDR 957,000 with an estimated coconut grater machine rental rate of IDR 10,000/hour which has the potential to be rented for 900 hours/year, and the maintenance cost to profit ratio was 10.6% which implies that the coconut grater machine with a capacity of 15 kg/hour is still prospective and feasible to use for the next few years.

Hafidah Muchlis

Kajian Ekonomi dan Akuntansi Terapan 2025 Asosiasi Riset Ekonomi dan Akuntansi Indonesia

This study aims to assess the quality of financial reporting at the Arda Jaya Diesel car repair shop on Jalan Dg Hayo Antang 3. The data used are numerical data or quantitative methods. The study was conducted by collecting data from the repair shop's financial reports, such as revenue, expenses, debt, inventory, and fixed assets. The assessment was carried out by examining whether the repair shop has followed accounting principles, how to record transactions, and whether the profit and loss statements and balance sheets are accurate and reliable. The method used is a case study supported by interviews and direct observations at the repair shop. The results show that many repair shops still record their finances simply and do not follow proper accounting standards. Therefore, financial reports need to be improved to assist business decision-making and meet the reporting needs of external parties such as creditors and investors.

Ula Aulia As Sanusi; Wasis Wijayanto

Imajinasi : Jurnal Ilmu Pengetahuan, Seni, dan Teknologi 2025 Asosiasi Seni Desain dan Komunikasi Visual Indonesia

This study looks at how the drum band at SDN 1 Kedungwaru Kidul supports the musical arts abilities of elementary school pupils as an extracurricular activity. It is anticipated that children's IQ would increase as they learn music. The growth of other intelligences is greatly aided by this intellect. Participating in extracurricular drumband training is one way to enhance musical arts abilities. participants in elementary school. On October 4, 2025, 24 grade VI students who had been actively involved in drumband activities for about a semester engaged in music art classes and conducted supervisor interviews in order to collect data. This study employs a qualitative methodology using a case study format to analyze data gathered by observation, documentation, and interviewing techniques. In research, data triangulation is used to verify the accuracy of the data. The study's findings demonstrate that the Drumband Extracurricular Program's implementation process has been proceeding smoothly. Damaged equipment, a shortage of practice time, and pupils who are not focused and diligent in performing the exercises are the challenges encountered. Increasing practice time, purchasing new equipment or repairing broken equipment, and providing constant guidance and direction are the strategies to get beyond these challenges and ensure that drum band practice runs well. The study's recommendations include the necessity of additional research to look at the factors that make drum band extracurricular activities successful and the execution of other arts extracurricular programs at the primary school level  

Muhammad Andriansyah; H.R. Adianto Mardijono

Federalisme : Jurnal Kajian Hukum dan Ilmu Komunikasi 2025 Asosiasi Peneliti dan Pengajar Ilmu Hukum Indonesia

Legal protection for consumers is a crucial element in the legal relationship between business actors and the public, particularly in high-risk service sectors such as gas stove repair services. In practice, many consumers still experience losses due to negligence by service providers, whether caused by inadequate technical handling or insufficient information regarding the condition of the stove after repairs. This study aims to identify and analyze the forms of legal protection available to consumers who suffer losses as a result of such negligence, as well as to determine the types of legal liability that may be imposed on gas stove repair service providers. Using a normative legal research method, this study applies both legislative and conceptual approaches. The legislative approach examines relevant laws and regulations concerning consumer protection, while the conceptual approach analyzes legal principles and expert doctrines related to liability. The findings indicate that consumer protection is provided in two forms: preventive protection, which ensures product and service safety in accordance with Indonesian National Standards (SNI), and repressive protection, which is implemented through enforcement mechanisms such as claims for compensation or dispute resolution through the Consumer Dispute Settlement Agency (BPSK) or the courts. Business actors who commit negligence in providing repair services can be held legally responsible based on the principles of negligence or strict liability. To strengthen consumer protection, the study recommends the establishment of derivative regulations concerning technician certification, standardized repair service procedures, and integrated supervision of safety compliance within the gas stove repair service industry.

Akmal Firdausy Fawaz Winahadi; Syamsul Hadi; Aufasiena Rafief Huda; Wahyu Endro Putra Rhendyansyah; Niki Cahyo Prasetyo

Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan 2025 Asosiasi Riset Ilmu Teknik Indonesia

Frequent damage to the grinding disc components and the transmission system of the 15 kg/hour rice flour grinder is a problem faced. The purpose of scheduling component maintenance and repairs is to obtain predictions of maintenance and repair schedules and costs for the period 2026. The component maintenance and repair scheduling method includes examining previous period maintenance and repair data, applying the inspection-replace-repair-overhaul (IRRO) method, assessing component conditions, estimating component life, estimating technician costs, estimating supporting work equipment and supporting materials to be used in maintenance, estimating the time for replacing spare parts or reinstalling components after repair, estimating maintenance and repair costs in 2026, and calculating the maintenance cost to profit ratio. The results of component maintenance and repair scheduling show that the maintenance cost in 2026 is Rp 1,370,000,- with an estimated annual profit potential of Rp 21,600,000, and the maintenance cost to profit ratio is 6.3%, which implies that the 15 kg/hour rice flour grinder is still quite prospective and feasible to use for the next few years.

Fahmi Faadhilah; Syamsul Hadi; Fitrianoor Anasia Pratama; Fajar Sugiharto; Arief Deny Setiawan +1 more

Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan 2025 Asosiasi Riset Ilmu Teknik Indonesia

Progressive wear on drive belt components, brake lining thickness, double lining bowl and other components of continuously variable transmission (CVT) on 160 cm3 automatic motorcycles are the problems faced. The purpose of component replacement planning is to obtain maintenance costs in 2026 and maintenance to profit ratio. The component replacement planning method includes collecting previous maintenance data, applying the inspection-replace-repair-overhaul (IRRO) method, evaluating component conditions, predicting component lifespan, predicting labor costs, predicting supporting equipment and supporting materials to be used in maintenance, predicting spare part replacement time, predicting maintenance costs in 2026, and calculating the maintenance cost to profit ratio. The results of component replacement planning obtained maintenance costs in 2026 are IDR 8.151.667,- with an estimated rental rate for Automatic Motorcycles of IDR 12,500/hour which has the potential to be rented for 3960 hours/year, and the ratio of maintenance costs to profits is 16.4% which implies that the 160 cm3 Automatic Motorcycle which was first used in 2021 is still prospective to generate profits and is suitable for use in the coming years.

Muchammad Firman Maulana; Syamsul Hadi; Ahmed Sahlur Rosyad; Muhammad Maulana Yusuf Aditya; Thilal Omar Syarif

Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan 2025 Asosiasi Riset Ilmu Teknik Indonesia

The problem with the sugarcane press machine is a decrease in performance in sugarcane pressing because it has been used since 2020 with an initial price of IDR 3,000,000, which is predicted to be IDR 5,500,000 in 2025 which occurs in the main components of the roler mill, V-belt, and bearings. The purpose of scheduling replacements and repairs is to obtain a schedule, estimated maintenance costs, and the ratio of replacement and repair costs to the profit of renting a sugarcane press for the period 2026. The scheduling method includes collecting data on the use of the sugarcane press machine, a list of replacements for 5 components for roler mills, V-belts, bearings, gasoline motor tanks, and engine frames from 34 components, component prices, estimated labor costs, equipment costs, supporting material costs, application of the inspection, replace, repair, and overhaul (IRRO) method, scheduling replacements and repairs, and calculating the ratio of replacement costs to profits. The results of the replacement and repair scheduling are in the form of maintenance costs of IDR 958,000, with a rate of IDR 10,000/hour for 588 hours/year, resulting in a profit of IDR 5,880,000, and a ratio of maintenance and repair costs to profit of 0.16%.

Bagus Prabowo; Syamsul Hadi; David Fajar Pratama; Fayshal Amirul Mu’Minin; M. Sofi Alfuadi Arif

Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan 2025 Asosiasi Riset Ilmu Teknik Indonesia

Problems in the meatball dough grinder are low production, increasing maintenance costs and disappointed meatball dough customers who receive orders late due to problems with the electric motor, Pulley, V belt, cutting knife. The purpose of the replacement scheduling is to obtain costs, maintenance-repair schedules in the period 2026, and the ratio of maintenance costs to profits. The replacement scheduling method includes collecting previous period maintenance data, applying the inspection-replace-repair-overhaul (IRRO) method, evaluating component working conditions, predicting component life, predicting repairman costs, predicting supporting equipment that will be used in maintenance, predicting the time to replace spare parts or reinstall components after repair, estimating maintenance and repair costs in 2026, and calculating the ratio of maintenance costs to profits. The results of the replacement scheduling show that the maintenance costs in 2026 are IDR 2,530,000 with an estimated rental rate for the meatball dough grinder of IDR 10,000/kg which has the potential to be rented for 1300 hours/year, and the ratio of maintenance costs to profits is 4.9% which implies that the meatball dough grinder with a capacity of 5 kg/hour still has the potential to sell well and is suitable for use in the coming years.

Dewa Hadi Prasetyo; Febi Rahmadianto

International Journal of Industrial Innovation and Mechanical Engineering 2025 Asosiasi Riset Ilmu Teknik Indonesia

Damage to rotable axle components on CAT KT4 Loaders in the mining industry is often the main cause of operational downtime. This study aims to analyze the frequency of damage to axle components and evaluate the effectiveness of preventive maintenance to reduce downtime duration and repair costs. Damage data collected from January to August 2024 were quantitatively analyzed to identify the most frequent damage patterns, especially seal leaks and brake modules. The results show that the implementation of preventive maintenance, such as regular seal replacement and hydraulic pressure checking, can significantly reduce the frequency of breakdowns and improve operational efficiency. The research also provides recommendations on maintenance strategies that can be implemented to extend component life and reduce overall downtime.