Maintenance and Repair Planning For Wood Profiling Machine With 90 Meters/Hour Capacity Using The IRRO Method
Muhammad Raihan Abdillah, et al. (2025). Maintenance and Repair Planning For Wood Profiling Machine With 90 Meters/Hour Capacity Using The IRRO Method. Venus: Jurnal Publikasi Rumpun Ilmu Teknik, 3(6). https://doi.org/10.61132/venus.v3i6.1232
Muhammad Raihan Abdillah; Syamsul Hadi; Rio Asyahdiky Al Faiz; Dhea Septa Ristiana; Khoirul Anam; Muhammad Finza Detri Pratama, "Maintenance and Repair Planning For Wood Profiling Machine With 90 Meters/Hour Capacity Using The IRRO Method," Venus: Jurnal Publikasi Rumpun Ilmu Teknik, vol. 3, no. 6, 2025.
Muhammad Raihan Abdillah; Syamsul Hadi; Rio Asyahdiky Al Faiz; Dhea Septa Ristiana; Khoirul Anam; Muhammad Finza Detri Pratama. "Maintenance and Repair Planning For Wood Profiling Machine With 90 Meters/Hour Capacity Using The IRRO Method." Venus: Jurnal Publikasi Rumpun Ilmu Teknik, vol. 3, no. 6, 2025.
Muhammad Raihan Abdillah; Syamsul Hadi; Rio Asyahdiky Al Faiz; Dhea Septa Ristiana; Khoirul Anam; Muhammad Finza Detri Pratama. "Maintenance and Repair Planning For Wood Profiling Machine With 90 Meters/Hour Capacity Using The IRRO Method." Venus: Jurnal Publikasi Rumpun Ilmu Teknik 3, no. 6 (2025).
Muhammad Raihan Abdillah, et al. (2025) 'Maintenance and Repair Planning For Wood Profiling Machine With 90 Meters/Hour Capacity Using The IRRO Method', Venus: Jurnal Publikasi Rumpun Ilmu Teknik, 3(6). doi: 10.61132/venus.v3i6.1232.
Muhammad Raihan Abdillah; Syamsul Hadi; Rio Asyahdiky Al Faiz; Dhea Septa Ristiana; Khoirul Anam; Muhammad Finza Detri Pratama. Maintenance and Repair Planning For Wood Profiling Machine With 90 Meters/Hour Capacity Using The IRRO Method. Venus: Jurnal Publikasi Rumpun Ilmu Teknik. 2025;3(6).
Analisis Lama Waktu Pemanasan dan Rasio Komposisi Oli terhadap Peningkatan Kualitas Batubara menggunakan Metode Upgrading Brown Coal
Ferry Samuel Maringan Siregar; Windhu Nugroho; Henny Magdalena; Agus Winarno; Rety Winonazada
Evaluasi Perhitungan Volume Stockpile Batubara dengan menggunakan Alat Total Station di PT. Bukit Baiduri Energi, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur
Muhammad Rofy Fauzan; Henny Magdalena; Lucia Litha Respati; Windhu Nugroho; Albertus Juvensius Pontus
Tiku, Kabupaten Agam Menggunakan Metode MNDWI dan Citra Landsat 8 Oli
Suci Ramayana; Fajrin Fajrin; Ilham Armi; Defwaldi Defwaldi
Analisis Korelasi Hasil Pengujian Unconfined Compressive Strength (UCS) & Point Load Index (PLI) Batuan pada Formasi Kampungbaru, Kabupaten Kutai Kartanegara
Akbar Nazaruddin; Albertus Juvensius Pontus; Agus Winarno; Tommy Trides; Lucia Litha Respati
Efektivitas Campuran Karbon Aktif Daun Nanas–Batubara dalam Peningkatan pH dan Penurunan Fe, Mn, serta TSS Air Asam Tambang PT Alreksa Bara Mitra
Ayu Ningtias; Lucia Litha Respati; Shalaho Dina Devy; Harjuni Hasan; Windhu Nugroho
Studi Pengaruh Derajat Kejenuhan Terhadap Kuat Geser Tanah
Anandyta Suci Ramdani; Revia Oktaviani; Ardhan Ismail; Tommy Trides; Albertus Juvensius Pontus