SciRepID - Scientific Publication Search

Publication Search

41,520 articles from 397 journals · 1,447 citations tracked

Showing 1-20 of 30

Analytics

Yunita Mauliana

Venus: Jurnal Publikasi Rumpun Ilmu Teknik 2023 Asosiasi Riset Ilmu Teknik Indonesia

Regency roads are local roads which do not include roads connecting the district capital to other districts, but their network is diverse as a link for local activities, namely connector roads between villages, between sub-districts, production center roads and environmental roads in residential areas. This research focuses on roads in Kaur Selatan District and Maje District, Kaur Regency, Bengkulu Province with a total length of 128.50 km with a total of 68 sections. There are several sub-district roads which are a road network that is integrated with national roads. In general, this road section is often used by various types of vehicles, from light to heavy vehicles. Utilization of roads that do not match their class and the influence of the weather climate in areas that are quite extreme result in landslides so that the road body becomes narrow and heavily damaged. As a result of damage to existing roads, community activities are hampered. The purpose of this research is to provide information to the Bengkulu Regency government in preparing priority planning, determining the type of pavement that is appropriate to the location of the road section and determining the calculation of the costs required. The results of research and calculations show that the cost required for road repairs is IDR. 70,788,844,000 for a period of 5 years. The priority scale consists of 17 sections with a cost of Rp. 57,541,204,000.

Lidia Murni Saruksuk; Lyany Cristin Banurea; Desi Rotua Simbolon; Hesekiel Sihombing

Jurnal Riset Rumpun Ilmu Sosial, Politik dan Humaniora 2023 Pusat Riset dan Inovasi Nasional

Coal in Jambi is a problem that people continually complain about and causes traffic jams and damaged roads. Until the end of 2022, there are 51 coal mining companies operating in Jambi Province, spread across Sarolangun, Tebo, Batanghari and Muaro Jambi. The Jambi provincial government is preparing alternative coal transportation routes via land and water. This research uses quantitative research with a descriptive format, aimed at explaining, summarizing various conditions, various situations or various variables that arise in the community which is the object of the research based on what happens. Then bring to the surface the character or description of the condition, situation or variable. The results of observations from questionnaires that have been distributed by students hope that this alternative will reduce the level of traffic jams and the number of accidents that occur in the community. The Governor of Jambi, Al Haris, has made various efforts in alternative development in his province. Students hope that this alternative will reduce the level of traffic jams and accidents that occur in society. The Governor of Jambi, Al Haris, has made various efforts in alternative development in his province. One of them is controlling the use of coal transport vehicle plates to repair roads. Apart from that, the provincial government is also discussing the issue of coal transport and the construction of special roads for coal transport. The Governor also admits that his authority is limited in matters of coal transport, but various efforts have been made. carried out, including opening alternative roads and giving lambuk numbers to coal transport. Apart from that, Governor Al Haris also stated the ban on coal transport via national roads and the importance of the progress of Jambi City as a barometer for the development of Jambi province. However, despite this, we can also feel that currently the accident rate is still there.

Dian Kurnia; Widya Mariyana; Mudy Oktiningrum

Jurnal ilmu Kesehatan Umum 2023 Asosiasi Riset Ilmu Kesehatan Indonesia

The maternal mortality rate of post-SC infection reaches 7.3%, and 90% causes postpartum morbidity. This study aimed to determine the factors associated with the SC wound healing process. This study used a quantitative method, a type of analytic survey research with a cross-sectional design approach. The population of this study were all post-SC mothers in the postpartum ward of Permata Medika Hospital. The sampling technique used was a consecutive sampling of 34 respondents. The research instrument was a questionnaire. Data analysis was done using univariate and bivariate (chi-square test, alpha = 0.05). The results of this study showed that there was a relationship between the SC wound healing process and early mobilisation (p-value 0.000 < 0.05), which means there was a relationship between the SC wound healing process and nutritional status (BMI) (p-value 0.04 < 0.05), and there was a relationship between the SC wound healing process and anaemia (p-value = 0.00 <0.05) because if p-value <  0.05, then Ha is accepted. Ho is rejected, meaning a significant relationship exists between early mobilisation, nutritional status, and anaemia in SC wound healing. Many factors affect the SC wound healing process, three of which are early mobilisation factors, which, if done before 6–8 hours after SC, has more potential to accelerate SC wound healing; normal nutritional status as an expression of a person's nutritional balance, which plays a role in the process of body tissue growth and has an impact on the duration of wound healing; and anaemia, which anaemia is a symptom of low haemoglobin levels in the blood and obstructs oxygen flow and prevents the growth and repair of tissue from the SC surgical incision.

Muhammad Risydan Al Amin; Widyasari Widyasari

Kegiatan Positif : Jurnal Hasil Karya Pengabdian Masyarakat 2023 Asosiasi Riset Ilmu Manajemen Kewirausahaan dan Bisnis Indonesia

Village development is a form of community service carried out by students by immersing themselves directly in the community environment so that when students study in the community and know the problems faced in that environment, the PKKM Village Development Program is expected to be a learning medium for students and the problems they face. The community can be helped and get solutions from the knowledge applied by students. PKKM Bina Desa Tawas 2023, which is located in Penanggungan Village, Trawas District, Mojokerto Regency, has been running a work program for 3 months from 21 August - 24 November 2023. One of the work programs I am working on is a program at the Dharmawanita Penanggungan Kindergarten educational institution, Problem What happened at the Dharma Wanita Penanggungan Kindergarten was the change in the mural on the classroom wall, where the previous mural had been damaged, peeling and there was a lot of graffiti from the kindergarten students, so the kindergarten team and I repaired and renovated the classroom wall. Therefore, the mural program on Kindergarten classroom walls can help Kindergarten students become enthusiastic about learning and we also provide empty walls that are not filled with murals to enable Kindergarten students to express themselves on the walls. The mural program at the Kindergarten has been completed on time and is being done as well as possible. Keywords: PKKM, Village Development, Penanggungan Village, Kindergarten, Mural.  

Tiara, Ernita Dita; Anderson, Irzal; Ichsan, Muhammad

Jurnal Global Citizen : Jurnal Ilmiah Kajian Pendidikan Kewarganegaraan 2023 Prodi PPKn Universitas Slamet Riyadi

The purpose of this study was to increase student learning independence in Civics subjects by applying the contextual teaching and learning (CTL) learning model in class X IPS 3 SMA Negeri 8 Muaro Jambi. This type of research is Classroom Action Research (PTK) with a research design using the Kemmis & Taggart spiral model. The research was carried out in 3 cycles where each cycle consisted of 3 meetings. Each cycle is carried out through 4 stages of activity, namely planning, implementing actions, observing (observation), and reflecting. The success criterion set in the research is 60%. The results showed that in cycle I the level of student learning independence increased from the initial condition of an average value of 23% to 49% but had not yet reached the established success criteria. Cycle I then made improvements to continue in cycle II. After the repairs were made, there was an increase in cycle II which increased by 9% to 58% but also did not reach the specified success criteria. Improvements were made again in cycle II to be continued in cycle III. The results of the research cycle III increased by 11% to 69%, which means that the action was declared successful because it had achieved the specified success criteria.Keywords: Independent Learning, CTL Learning Model

Tri Widodo; Ismail Fardiansyah

Jurnal Pengabdian Kepada Masyarakat 2023 Pusat Riset dan Inovasi Nasional

One of the work activities usually carried out to maintain and repair public facilities in residential communities is the welding process. Of course, correct knowledge is needed regarding a good welding process in order to produce quality welding results so that the object being repaired can last a long time. In the welding process there are several potential dangers which have risks both for the welding worker himself in terms of health and risks for the environment in the form of fire. Education to the public regarding the welding process so that it produces quality results in general includes: ensuring the work area is clean and safe, then the tools and materials used are according to specifications and correct welding techniques are very helpful to the public. Apart from that, recognition of the potential dangers and risks that may arise from the welding process can increase awareness in the community of the importance of implementing occupational health and safety principles.

Kevin Kurniawansyah; Noneng Marthiawati; Hetty Rohayani; Hafiz Nugraha

Karunia: Jurnal Hasil Pengabdian Masyarakat Indonesia 2023 Fakultas Teknik Universitas Maritim AMNI Semarang

At present, the Industrial Revolution 4.0 is not only happening in the industrial world but also in government agencies that apply technology to fulfill service needs to the community. The government is expected to answer all community needs by providing the best services based on information technology. One of them is the Jambi City Public Complaint Information System Applications or Online-Based Jambi City Community Complaint Application (SiKesal) is a form of information technology-based service application for incoming public complaints dominated by infrastructure, roads, drainage, cleanliness, street lights, clean water, and parking problems and about damage to be repaired. With the public complaint report, it will not be followed up by the relevant OPD admin, so it is necessary to train how to use the SiKesal application for OPD Admins in Jambi City so that each OPD admin knows what to do. On this basis, in the community service program (PkM) activities on this occasion, assistance in using the SiKesal application for OPD admins in the Jambi City which is one of the right solutions for the government to improve government services to the community so that public satisfaction and trust in the government can increase.

Rajinda Bintang

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2023 Asosiasi Riset Ilmu Teknik Indonesia

An investigation into the building is carried out to determine the suitability and safety of the building and the strength of the structure. The investigations to be carried out include field and laboratory investigations. This is done to determine the feasibility and safety of existing structures. Apart from that, it is also hoped that this investigation can provide recommendations regarding repair or strengthening methods if necessary, referring to the requirements for Structural Concrete for Buildings SNI 2847:2019 and Procedures for Earthquake Resistance Planning for Building and Non-Building Structures SNI 2847:2019. From the results of structural testing using UPV and Hammer Test, it was found that the structural system is an open frame consisting of plates, beams and columns using concrete material, while the joists use steel plinths. The reinforcing steel used uses plain iron U40 as flexible reinforcement with shear reinforcement with U24. The quality of concrete obtained respectively for column f'c 25 MPa, beam f'c 22 MPa and floor slab f'c 22 MPa. Based on the results of the floor leveling survey to record the potential for building subsidence or floor sagging using a water level, it was concluded that there was no slope found in the building as a whole. The deflection that occurs is local and relatively flat. To meet the requirements, strengthening was carried out by increasing the dimensions of the columns and beams, adding plates to the steel profiles on the flange and web.

Rizky Saputra Aminata; Minto Basuki

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2023 Fakultas Teknik Universitas Maritim AMNI Semarang

This final assignment compared the results of durations in the CCPM method and the Critical Path Method (CPM) by conducting a case study of ship repairs at Galangan Kapal Madura Ltd. Initial project scheduling employed the traditional method of a Gantt chart, which was then broken down in more detail and complete relationships among activities into CPM form. The results were then compared with the duration in CCPM scheduling by eliminating multitasking and safety time for each activity as well as providing a buffer in progress. The CPM method lasted for 30 days at a cost of IDR 246,600,000.00, while the CCPM method lasted for 20 days at a cost of IDR 215,600,000.00. In conclusion, the CCPM method was the most effective.

Arsil Arsil; Alimir Alimir; Jasmienti Jasmienti; Hamdi Abdul Karim

Jurnal Ilmu Sosial, Bahasa dan Pendidikan 2023 Pusat Riset dan Inovasi Nasional

Environmentally Caring Character is an attitude and action that always strives to prevent damage to the surrounding natural environment, and develops efforts to repair natural damage that has occurred. Based on initial observations, the facts that the author found in the field are that there are still some students whose character is still far from what was expected, even though they have received PAI learning at school, such as there are still some students who like to throw rubbish carelessly, there are still some students who damage facilities. At school, there are still some students who are reluctant to be involved in cleaning the school environment and there are still some students who lack awareness in maintaining and maintaining gardens at school. The aim of this research is to determine the efforts of Islamic Religious Education teachers in forming environmentally caring character in class VIII students at SMPN 1 Bukittinggi and to describe the supporting and inhibiting factors in forming environmentally caring character in class VIII students at SMPN 1 Bukittinggi. The research in this thesis uses qualitative research. This research is descriptive qualitative field research as a research procedure that produces descriptive data in the form of written or spoken words from the people and behavior being observed. Based on the results of this research, it was found that the efforts of Islamic Religious Education teachers in forming students' environmentally caring character at SMPN 1 Bukittinggi were carried out in various ways, starting from the school principal's efforts in providing support and appreciation to students and parents, teachers' efforts in synchronizing learning materials with the character of caring for the environment, reminding students when someone behaves that does not reflect concern for the environment and modeling and providing an example to students. Supporting factors in the character education process at SMP N 1 Bukittinggi are good, namely the presence of pre-school experience, the existence of good learning motivation, the existence of students' attitudes and habits in learning, the teacher has the ability to deliver the material and can adapt it to the needs of the students, the teacher has high enthusiasm. in teaching. Meanwhile, the inhibiting factor: the bad habits of some students from home who are brought into the classroom, thus affecting other students.

Wa’addulloh, Mu’izzaddin; Diansisti , Anisa; Purwanto, Purwanto

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2023 Fakultas Teknik Universitas Maritim AMNI Semarang

In the world of the PLTU industry, the need for material, especially the need for the sapot process and conveyor repairs, occurs in the world of PLTU, which is installed on the conveyor construction and when connecting materials, different grades are often used and this often occurs in the field during the process of combining plates with different grades. on the sapote. and for installing the plate on the sappot, use grade A and the plate that is often used is the plate for the machine foundation with grade B on the sappot material using low carbon grade A steel. In this research report, welding is carried out and combined with grade A steel which is usually used for sappots. the conveyor is combined with low carbon grade B steel in the construction of the PLTU sapot. Where welding is carried out 3x why this needs to be done is because to know the characteristics of low carbon grade A steel and low carbon grade B steel, whether the characteristics are the same or not because they are used in When grade A steel material runs out in the industry, the testing process uses 3 tests, namely to determine NDT testing (Non Destructive, test), tensile testing, and micro testing for the testing process. (DonyPerdana and Ahmad Bazy Syarif, 2017).

Afandi Putra Yuda; Seftiwan Pratami Djasfar

Jurnal Ventilator: Jurnal riset ilmu kesehatan dan Keperawatan 2023 Stikes Kesdam IV/Diponegoro Semarang, Indonesia

Pityriasis capitis (dandruff) is a scalp disorder characterized by white scales and itching which causes a dilemma for sufferers because it can reduce appearance or attractiveness and cause a student to lack self-confidence. Pityriasis capitis (dandruff) is experienced by all groups, from children, teenagers to the elderly, of all genders. Paskibra members are an example of teenagers who often do outdoor activities. This research aims to identify the fungus Pityrosporum ovale which causes dandruff in Paskibra members. The research design used was descriptive observational, where the main aim was to obtain an overview of the Pytorosporum ovale fungus on the scalp of Paskibra SMA “X” Tangerang City and the sample of this study were 19 Paskibra members. The repair materials were scalp scrapings on dandruff sufferers to do microscopic examination with 10% KOH and Lactophenol Cotton Blue then followed by culture on Sabouraud Dextrose Agar with chloramphenicol at 37OC for 2-5 days. The results of the research on 19 respondents conducted at SMA “X” Tangerang City showed that 18 respondents (95%) were positively infected with the fungus Pityrosporum ovale and 1 respondent (5%) was negatively infected with dandruff. Macroscopically Pityrosporum ovale has a morphological form that is white in color and fine textured and microscopically has morphological characteristics of microconidia oval and budding.

Chicka Willy Yanti; Putri Rahmadani; Ledy Yuhana; Zuhruf Salsabilla; Muhammad Syahrul Mukminin +6 more

Kegiatan Positif : Jurnal Hasil Karya Pengabdian Masyarakat 2023 Asosiasi Riset Ilmu Manajemen Kewirausahaan dan Bisnis Indonesia

The purpose of this activity is so that the environment of Batu Bersurat Village, XIII Koto Kampar District, Kampar Regency can become a clean and uncontaminated environment from cow dung. Cow dung can be processed into compost. Compost is an organic fertilizer made from animal waste that has undergone a fermentation process. The advantage of this compost is that it is environmentally friendly, can increase the income of farmers, and can increase soil fertility by repairing physical damage to the soil due to excessive use of inorganic (chemical) fertilizers. Batu Bersurat Village is an area with potential in agriculture, plantation and animal husbandry. The existence of cattle owned by the community has the potential to be used as compost which can be used for agriculture as well as for the fertility of plantation crops. However, the lack of knowledge of residents about the methods and benefits of making compost from cow manure causes cow manure to be thrown away, therefore people still use chemical fertilizers as a medium for the fertility of their plants. Therefore, a practice was held to make use of compost from cow manure in Batu Bersurat Village, District XIII Koto Kampar, Kampar Regency.

Muhamad Nur Fauzi

Mars: Jurnal Teknik Mesin, Industri, Elektro Dan Ilmu Komputer 2023 Asosiasi Riset Teknik Elektro dan Informatika Indonesia

As with the engine ignition system, the spark produced by the manufacturer's standard CDI is limited or known as a CDI limiter, in contrast to non-limiter CDI which has no limits or has a higher spark limit on the engine so that it can produce engine performance up to a higher RPM. higher and produces maximum engine performance. Weaknesses in the factory standard CDI can be overcome by replacing it with a racing CDI. Racing CDI has the same quality or even better than standard CDI. Racing CDIs are made by local manufacturers and from abroad and are now easily available in spare parts stores or motorbike repair shops throughout Indonesia.

Muhammad Rafli Ramadhani; Exda Hanung Lidiana

Journal of Educational Innovation and Public Health 2023 Pusat Riset dan Inovasi Nasional

Background of study: Diabetic ulcers is a complication of diabetes mellitus resulting from sensory, motor, autonomic neuropathy and/or vascular disorders of the limbs. One of the diabetic ulcer treatment techniques is using aloe vera gel. Aloe vera contains anti-bacterial, anti-inflammatory and can repair tissue damage of diabetic ulcers. Objective: to determine changes and developments after applying aloe vera gel to diabetic ulcer wound healing. Methods: This research uses descriptive case studies by observing nursing care for diabetic ulcer patients using aloe vera gel at the Rasika Gunungkidul Wound Clinic with an application 6x and application is carried out every 2 days using the Bates-Jensen Wound Assessment Tool. Results: The results of the assessment score before application in respondent 1 score 32 points with categories wound degeneration and respondent 2 score 21 points with categories wound degeneration. After application with aloe vera gel the score on respondent 1 was 21 points with categories wound degeneration while on respondent 2 was 10 points with categories wound regenration. The two respondents had a decrease in score which indicated that the wound had progressed significantly. Conclusion: The application of aloe vera gel can be used as an effective non-pharmacological method for diabetic ulcer wound.  

Syifa Anisa; Rita Riyanti

Jurnal Anestesi: Jurnal Ilmu Kesehatan dan Kedokteran, 2023 Stikes Kesdam IV/Diponegoro Semarang, Indonesia

Background : Based on data from the Indonesian Ministry of Health in 2018 the incidence of diaper rash in Indonesia alone has reached 7-35%, which affects male and female infants less than three years old. This is because there is a lot of interest in using disposable or disposable diapers. One of the treatments thatl can bel used tol treat diaperl rash in babies isl to use olive loil. Olive oil contains many active compounds that are beneficiall for thel skin, repairingl damaged skinl cells asl antioxidants neutralizingl free lradicals, reducing rednessl on thel skin andl can protectl the skinl from lirritation. Purpose : This studyl aims to analyzel the effectl of giving olivel oil to reduce thel degree ofl diaper rashl in toddlers. Research Methods: This type of research is pre-experimental using a one group pretest-posttest design with a total sample of 22 respondents. Results: The results of the Wilcoxon test before and after being given treatment showed a p value of 0.000 <0.05, meaning that there was a positive effect of giving olive oil on reducing the degree of diaper rash in toddlers.

Akhmad Miftahul Huda; Minto Basuki

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2023 Fakultas Teknik Universitas Maritim AMNI Semarang

. In the shipbuilding industry, the repair process is a series of jobs that require a relatively short time. Delays in repairs can occur due to weak management and also caused by less than optimal empowerment of human resources. This study aims to identify the risks found in four divisions, namely the Production Division, Warehouse Division, Finance Division and Purchasing Division. The study found 31 risk events. Determining the value of each risk is carried out using the Failure Mode and Effect Analysis method. There were 13 risks that had the highest Risk Priority Number, namely the length of approval for requests for goods (RPN = 522.88), delays in payment processes by customers (RPN = 504.64), requests for additional work from the owner (RPN = 477.128), fluctuations in the number of manpower (RPN = 454.08), Changes in material use related to the availability of materials in the warehouse (RPN = 411.768), Changes in material calculations related to design (RPN = 389.017), Length of decision making by the owner (RPN = 388.36), Long material delivery process (RPN = 388.36), Insufficient stock material (RPN = 357,588), Writing the amount on the Request for Goods Bill is not detailed (RPN = 357.71), Lack of availability of stock material (RPN = 349,524), Making and submitting late payment requests (RPN = 316.8), Placement of materials that are less efficient (RPN = 296.8) Risk mitigation is carried out using the Fault Tree Analysis method to find the main cause / basic event of each risk. And the mitigation step that needs to be done is by making changes to the warehouse layout. If the layout design of the warehouse is changed to be more efficient it will speed up the material retrieval process which has an impact on the ship repair process time.

Rekiana Jati Kusuma; Minto Basuki

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2023 Fakultas Teknik Universitas Maritim AMNI Semarang

In this case it refers to the purpose of the content in this final project, namely by compiling a schedule for the Implementation of KM.Mutiara Ferindo 5 Ship Maintenance during the docking process at the PT.PAL Indonesia shipyard. Making a schedule includes what components are repaired when the ship is in a condition shipyard, make a ship maintenance management schedule that has been carried out in the shipyard. The data used in this thesis are data from PT.Antosim Lampung Pelayaran Surabaya and the researchers themselves. The type of data used in this research is primary data. will be related to the problem being studied and the results of the questionnaire distributed to several employees related to this research. In carrying out repairs there is a work list that shows how many items of work work must be done. So this work list has been approved to be carried out in the ship repair process. KM ship repair work. Mutiara Ferindo 5 which carries out planned repairs both at the shipyard and when the ship anchors at sea carries out maintenance technically and economically. Repair work on RO-RO ships that carry out maintenance on a scale that has been determined by the office and ship crew who are authorized to help carry out ship repairs. Repair work on the ship KM. Mutiara Ferindo 5 is well planned in terms of safety equipment and also component equipment that plays an important role in the smooth operation of the ship (maintenance of the entire engine room, deck, safety equipment and maintenance of the inside and outside of the ship). Implementing an economical system of estimating the remaining funds after maintenance at the shipyard.

Muh. Adrian Ariq Maulana; Minto Basuki

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2023 Fakultas Teknik Universitas Maritim AMNI Semarang

In a shipbuilding industry, fast and efficient time is needed in carrying out construction projects and ship repairs. This is because it has been mutually agreed between the two parties, both the owner of the ship (owner), and the shipyard regarding the time to work on the project. By racing on the processing time, the level of productivity is an important point that must be considered by the shipyard. There are many factors that can affect the level of productivity of a shipyard. One of the factors, among others, is the determination of the number of man hours (man hours). In a ship building or repair project, the allocation of the number of man hours is very important, if the number of man hours (man hours) is not correct it will cause delays and decrease in productivity levels. The purpose of this study was to analyze the effect of man hours on the level of productivity in the KMP repair project. Cakalang and KMP. Gili Iyang by conducting a correlation test of the Product Moment method with the help of SPSS (Statistical Program for Social Science) v2.3 for windows software, with the independent variable (X), namely the number of man hours (man hours) and the dependent variable (Y), namely the level of productivity. And then a significant correlation value is generated between the number of man hours (man hours) and the level of shipyard productivity. The results of this study are the significance values obtained between the X and Y variables in the KMP repair project. Cakalang is 0.037 and at KMP. Gili Iyang is 0.026 which means that there is a significant correlation between the variable man hours and productivity with a very strong relationship category in KMP. Cakalang and strong links to KMP. Gili Iyang.

Sarah Munparidah; Kusuma Agdhi Rahwana; Barin Barlian

Maeswara : Jurnal Riset Ilmu Manajemen dan Kewirausahaan 2023 Asosiasi Riset Ilmu Manajemen Kewirausahaan dan Bisnis Indonesia

This study aims to determine the effect simultaneously and partially of Compensation and Work Discipline on Employee Performance at the Cahya Fajar Car Repair Shop, Magelang. The research method used in this study is to use quantitative research methods with a census approach. The population in this study were 44 employees of the Cahya Fajar Car Repair Shop. The type of data used in this study is primary data obtained through questionnaires. The data testing technique used in this study uses the validity test, reliability test and classic assumption test. Data analysis in this study used multiple regression analysis using SPSS software version 25. The results of the study show that compensation and work discipline simultaneously have a significant effect on employee performance at the Cahya Fajar Magelang Car Workshop. Partial compensation has a significant effect on employee performance at the Cahya Fajar Car Repair Shop, Magelang. Work Discipline partially has a significant effect on Employee Performance at the Cahya Fajar Car Repair Shop, Magelang.