Publication Search

73,319 articles from 712 journals · 2,111 citations tracked

Showing 1-11 of 11

Analytics

Fadillah, hasti; Adinda Tarisyah Hsb; Sriani Sriani

Mars: Jurnal Teknik Mesin, Industri, Elektro Dan Ilmu Komputer 2024 Asosiasi Riset Teknik Elektro dan Informatika Indonesia

Tea plantations are an important sector in Indonesia's agricultural industry that contributes significantly to the country's economy. The success of tea cultivation is highly dependent on the quality of the seedlings, making data collection and management of tea seedlings a crucial element. However, the manual data collection process still used at PTPN4 faces various challenges such as recording errors, data loss, and information delays, which will have an impact on operational efficiency and decision making. This study analyzes the application of a web-based information system for data collection of tea seedlings in PTPN4 plantations, with a focus on the provision or stocking of seedlings. The results show that a web-based system using the waterfall method can improve the efficiency, accuracy, and transparency of data management, while facilitating integration between units in the organization. Abstrak. Perkebunan teh merupakan sektor penting dalam industri pertanian di indonesia yang memberikan kontribusi signifikan terhadap ekonomi dalam negara. Keberhasilan budidaya tanaman teh sangat bergantung pada kualitas bibit, sehingga pendataan dan pengelolaan bibit teh menjadi elemen krusial. Namun, proses pendataan manual yang masih digunakan di PTPN4 menghadapi berbagai tantangan seperti kesalahan pencatatan, kehilangan data, dan keterlambatan informasi, yang nantinya akan berdampak pada efisiensi operasional dan pengambilan keputusan. Penelitian ini menganalisis penerapan sistem informasi berbasis web untuk pendataan bibit teh di perkebunan PTPN4, dengan fokus pada penyediaan atau stok terhadap bibit. Hasil penelitian menunjukkan bahwa sistem berbasis web dengan menggunakan metode waterfall dapat meningkatkan efisiensi, akurasi, serta transparansi pengelolaan data, sekaligus memfasilitasi integrasi antar unit dalam organisasi.

Naufal Iman Adzhan; Ary Setyawan; Koosdaryani Soeryodarundio

Venus: Jurnal Publikasi Rumpun Ilmu Teknik 2024 Asosiasi Riset Ilmu Teknik Indonesia

The construction industry in Indonesia is growing rapidly, playing a crucial role in the country's economic, political, and social development. However, alongside this rapid growth, issues such as project delays are inevitable. The construction project of the Indonesian Maritime Polytechnic, for instance, has experienced significant delays, which can lead to increased costs, waste of human resources, and disputes among the involved parties. Understanding the primary causes of these delays is essential for developing effective strategies to avoid future delays. This analysis uses both qualitative and quantitative methods to identify the root causes of delays. Data was collected through surveys of respondents involved in the project, including project managers, field staff, and consultants. The analyzed causes of delays include insufficient funding, increases in raw material costs, additional costs, contract document errors, poor communication, and slow decision-making. To minimize delays and their impacts, several recommendations can be made: effective strategic planning, improved communication, increased staff, accurate initial cost estimates, and good management. By implementing these recommendations, the Indonesian Maritime Polytechnic construction project can be completed more effectively and efficiently, and future delays can be avoided.

Sukron Makmun; Widyarini Indriasti Wardani

Jurnal Akta Notaris 2024 Program Studi Kenotariatan Program Magister

Keterlambatan pendaftaran akta peralihan hak atas tanah pada Kantor Pertanahan Kabupaten Batang dapat terjadi karena berbagai alasan. Faktor-faktor ini meliputi keterbatasan sumber daya manusia, prosedur administratif yang berbelit, hingga kesalahan dalam pengisian formulir atau persyaratan dokumen. Rumusan masalah yang diangkat meliputi: (1) Mengapa Pejabat Pembuat Akta Tanah (PPAT) dan Kantor Pertanahan Kabupaten Batang mengalami keterlambatan dalam Pendaftaran akta peralihan hak? (2) Bagaimana Tanggung Jawab dan Akibat Hukum keterlambatan akta peralihan hak yang didaftarkan pada Kantor Pertanahan Kabupaten Batang?, serta (3) Bagaimana implikasi hukum dan konsekuensi keterlambatan pendaftaran akta peralihan hak di Kabupaten Batang bagi pihak-pihak yang terlibat? Metode penelitian yang digunakan adalah yuridis empiris dengan pendekatan kualitatif, melalui studi kepustakaan dan wawancara dengan pihak terkait. Hasil penelitian menunjukkan bahwa PPAT dan Kantor Pertanahan Kabupaten Batang bertanggung jawab secara hukum atas keterlambatan pendaftaran akta, yang dapat menimbulkan sanksi administratif hingga pidana. Faktor utama penyebab keterlambatan adalah ketidak sesuaian administrasi, keterbatasan sumber daya manusia di Kantor Pertanahan, serta rendahnya tingkat kepatuhan hukum di kalangan PPAT. Solusi yang diusulkan meliputi peningkatan kapasitas PPAT melalui pelatihan, optimalisasi sistem pendaftaran elektronik, dan peningkatan koordinasi antara PPAT dan Kantor Pertanahan. Keterlambatan ini berdampak signifikan terhadap para pihak, termasuk kerugian finansial dan ketidakpastian hukum atas kepemilikan hak. Oleh karena itu, peningkatan kepatuhan dan efisiensi proses pendaftaran akta sangat diperlukan untuk mengurangi dampak negatif yang timbul.

Mahdi Hidayatullah; Hastin Umi Anisah

Jurnal Kajian dan Penalaran Ilmu Manajemen 2024 CV. Aksara Global Akademia

Penelitian ini mengeksplorasi adaptasi pasar terhadap tren makanan viral yang awalnya populer di Jawa dan kemudian diadopsi oleh usaha kecil di Banjarmasin, Kalimantan Selatan. Fenomena adopsi tren yang tertunda ini menghadirkan peluang bisnis bagi pengusaha kuliner lokal yang ingin menarik konsumen dengan produk yang telah terbukti laris di pasar. Pendekatan studi kasus kualitatif digunakan untuk menyelidiki faktor-faktor yang memengaruhi adaptasi pasar, strategi bisnis yang diterapkan, serta tantangan yang dihadapi dalam mengadopsi tren viral tersebut. Data dikumpulkan melalui wawancara mendalam dengan pemilik usaha kuliner di Banjarmasin, observasi lapangan untuk memahami perilaku konsumen, serta analisis dokumen dan media sosial untuk melacak penyebaran tren. Temuan menunjukkan bahwa adaptasi terhadap tren dipengaruhi oleh keterlambatan informasi, preferensi konsumen lokal, dan modal sosial. Para pengusaha lokal melihat keterlambatan ini sebagai peluang untuk mengurangi risiko investasi, meskipun tantangan tetap ada dalam hal orisinalitas produk dan mempertahankan minat konsumen.

M. Afif Salim; Defri Dwista Rahma

Journal of Civil Engineering and Technology Sciences 2024 Faculty Of Engineering University 17 August 1945 Semarang

Proyek Peningkatan/Revitalisasi Terminal Penumpang Tipe A Bobotsari mengalami hambatan di lapangan yang menyebabkan keterlambatan dalam pelaksanaan pekerjaan. Oleh karena itu, diperlukan peran manajemen konstruksi untuk pengawasan proyek demi mencapai hasil yang optimal. Tindakan yang diambil adalah merencanakan dan menganalisis estimasi waktu dan biaya konstruksi pada pekerjaan struktur dengan penambahan jam kerja dan tenaga kerja menggunakan metode time cost trade off dengan bantuan software Primavera Project Planner P6 agar proyek dapat selesai tepat waktu. Berdasarkan hasil analisis, estimasi waktu pelaksanaan pekerjaan struktur dengan metode time cost trade off adalah 124 hari kalender, yang lebih cepat  9 hari kalender dibandingkan durasi normal (133 hari kalender). Biaya yang timbul akibat penambahan jam kerja sebesar Rp2.641.480.280,00 yang lebih besar Rp97.126.530,00 dibandingkan biaya normal (Rp2.544.353.750,00), dan biaya akibat penambahan tenaga kerja sebesar Rp2.554.488.416,00 yang lebih besar Rp10.134.666,00 dibandingkan biaya normal (Rp2.544.353.750,00).

Sahri Wulandari; Sri Wahyuni; Faqih Hakim Hasibuan

Ta'rim: Jurnal Pendidikan dan Anak Usia Dini 2024 Sekolah Tinggi Agama Islam Yayasan Pendidikan Ilmu Qur'an Baubau

This research aims to find out how language development is delayed in children and the factors that hinder language development and support language development in children aged 5-6 years at Abizar Al Hafiz IT Kindergarten. This research uses a qualitative approach research methodology with a case study approach. This approach is carried out holistically, by explaining phenomena through words and language. The location of this research is at the Abizar Al Hafiz IT Kindergarten which is located in Terutung Payung Hilir Village, Bambel District, Southeast Aceh Regency. The time of this research is from July 2024 to August 2024, the data source in this research is the subject, there are 2 students and the object of this research is observing the language development of children who experience delays in children at the Abizar Al Hafiz IT Kindergarten. As well as teachers and parents of children who live in that place. The researcher's data collection process used observation, interviews and documentation. The results of the research revealed that young children with delays in language development find it difficult to communicate and mingle with other people, are less responsive when asked to communicate, pronounce words that are unclear or unclear, and have a very limited vocabulary. As well as factors that have the potential to cause delays in language development in children, namely the lack of children who are always given gadgets, the absence of peers to play with, the use of languages ​​other than Indonesian, the child's health history, and the lack of parental presence in the child's life.

Rosalia Indah Sari; Bugi Nugraha; Prima Yudha Yudianto; Intan Sianturi

Jurnal Bintang Pendidikan Indonesia 2024 Pusat Riset dan Inovasi Nasional

Delays in the completion of Port Disbursements in ship agency companies can interfere with operational performance in ship agency companies where this delay factor arises from internal and external parties. This article explains that there are still obstacles/factors that cause the process of completing a ship's Port Disbursement has not run on time due to obstacles between shipping agents, related agencies, and Port Business Entities, This research uses qualitative research with data collection and interviews, while the data collection in this study is by data reduction, and the existence of primary and secondary data sources. Based on the results of the research obtained by the researcher, the cause of the delay in completing Port Disbursement uses 4 (four) elements in the Fishbone Diagram, namely Man, Material, Method, and Machine. These factors cause operational performance in completing Port Disbursement on time which ultimately causes queues/piles of settlement files, so that this will have an impact on the company's cash flow to be unsmooth. The solution provided by the company is to continue to evaluate and improve what makes the obstacle factors experienced by the operational and financial divisions in completing the settlement.  

Risma Sisni Fadilla; Puteri Fannya; Noor Yulia; Lily Widjaja

Jurnal Kesehatan dan Kedokteran 2024 Lembaga Pengembangan Kinerja Dosen

Prompt return of patient medical records is an important step in the health records processing workflow. Speed is the key to meeting quality processing standards. The hospital sets a deadline for returning medical records within 2x24 hours after the patient is discharged. Delays can be caused by various factors, which are classified under the 5M management elements: man, materials, machines, methods, and money. The aim of this research is to identify aspects that are the root of the problem in delays in the process of returning medical records to the hospital. The methodology used is a literature review, with analysis of 17 journal articles from the Google Scholar database. The study results showed that human factors such as staff shortages, incomplete doctor signatures, and inadequate staff educational qualifications were the main causes of delays. Material factors often result in incomplete documents. The machine factor is related to the significant distance between the inpatient department and the medical records department. Meanwhile, the method factor, namely SPO socialization has not been carried out and the implementation of job descriptions has not been maximized.

Arif Fuddin Usman; St. Retno Ayuningtias; Andi Rustan; Febrian James; Mutmainna Rachman

Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan 2024 Asosiasi Riset Ilmu Teknik Indonesia

The purpose of this research is to determine strategies for addressing the delays in the arrival and departure times of KM Umsini and KM Dobonsolo owned by PT. Pelni (Persero) at the Port of Makassar based on SWOT analysis recommendations. The data processed includes qualitative data on estimated arrival times compared to the actual arrival times of the vessels, as well as estimated departure times compared to the actual departure times. The results show that the average delay in the arrival of KM Dobonsolo is 1 hour and 18 minutes, while the average delay in departure is 2 hours and 5 minutes. The average delay in the arrival of KM Umsini is 3 hours and 8 minutes, and the average delay in departure is 3 hours and 12 minutes. The strategies implemented to improve the factors affecting the punctuality of the vessels' arrival and departure times include the Embarkation/Debarkation Service Process, the Loading/Unloading Process, the Freshwater Bunkering Process, the Fuel Bunkering Process, and the delays in the IT system facilitated by Inapornet in handling Clearance Documents.

Nur Hapipah; Muhammad Azhar Shauqy; Rahman Raising; Arif Fuddin Usman; Febrian James

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2024 Fakultas Teknik Universitas Maritim AMNI Semarang

This research uses a qualitative method with a descriptive approach and data presentation in the form of Fish Bone diagrams with observation, documentation, and interview methods. The results of this study show that there are problems that occur in the process of extending the safety certificate of tugboats at KSOP Class I Balikpapan, namely in the lack of accuracy, less efficient, and less optimal in the process of extending the safety certificate of tugboats, in the results of the inspection report there is a lack of equipment on the royal tb 7 ship, lack of maintenance of equipment on board. The solution to improve performance in the process of tugboat safety certificate extension at KSOP Class I Balikpapan is by providing evaluation, training to develop skills, in the manual system it is recommended to be changed into an electronic system in order to optimize and streamline time in the payment process, and on the shortcomings on board are given evaluation and training on the importance of sailing safety to reduce the risk of accidents at sea, checking equipment that is almost expired, and conducting regular maintenance.

Sulaiman, Rahmat; Al Fathul, Rab Sahf; Raya, Agustina Mardeka

SABER : Jurnal Teknik Informatika, Sains dan Ilmu Komunikasi 2024 STIKes Ibnu Sina Ajibarang

Untuk memenuhi kebutuhan masyarakat yang ingin mendapatkan informasi dengan cepat, dan mudah, kebutuhan akan akses internet sangat tinggi. dengan demikian, kita harus terus mencari dan mengupayakan kualitas. Terdapat keterlambatan dalam komunikasi serta belum adanya pemfilteran terhadap perangkat yang terhubung dalam jaringan internet kantor lurah air Selemba. Hal ini dikarenakan belum ada untuk mengatur hak ases setiap perangkat yang ada dalam jaringan tersebut,oleh karena itu diperlukan penerapan metode Access Control List(ACL) pada jaringan komputer dengan tujuan agar para staff atau pegawai lebih stabil saat bekerja. Dalam mendapatkan akses internet yang pengembangan yang digunakan adalah NDLC terdiri dari Analysis, Design, Simulasi Prototyping, Implementation, Monitoring dan Management. Metode pengumpulan data adalah studi pustaka, observasi dan wawancara. Routerboard yang digunakan RB941- 2nd.Hasil yang didapat dari penelitian ini adalah metode ini sangat membantu dalam membatasi jumlah klien yang mendapatkan internet serta melakukan filtering terhadap paket yang tidak diizinkan