+62 813-8532-9115 info@scirepid.com

 
Venus - Venus Jurnal Publikasi Rumpun Ilmu Teknik - Vol. 3 Issue. 3 (2025)

Analisis Kelayakan Pembangunan PLTS pada Kafe Pondok Juice

Risse Entikaria Rachmanita, Syahrir Rojib, Nur Faizin, Ahmad Fahriannur,



Abstract

Indonesia, which is located on the equator, has great potential to utilize solar energy, with an average solar radiation reaching 4.80 kWh/m² per day. This provides an advantage in the development of Solar Power Plants (SPP), one of which is through the installation of rooftop on the roof of the building as a source of electrical energy. This study aims to analyze the feasibility of SPP development by considering the techno-economic aspects of the Pondok Juice cafe. The total real electrical energy consumption required by the Pondok Juice cafe is 32,548 Wh/day. Assuming a system loss of 15%, the total electrical energy requirement that must be supplied by the SPP is 37,430.2 Wh/day. The initial investment projection is IDR 204,265,197, with operational and maintenance costs for 25 years of IDR 105,760,028. The investment feasibility analysis shows NPV of IDR 441,523,820.10, BCR 4.11, DPP ±5 years, and IRR 15.55%, which proves that this SPP planning is feasible to implement.







DOI :


Sitasi :

0

PISSN :

3031-5026

EISSN :

3031-3481

Date.Create Crossref:

13-Jun-2025

Date.Issue :

22-May-2025

Date.Publish :

22-May-2025

Date.PublishOnline :

22-May-2025



PDF File :

Resource :

Open

License :

https://creativecommons.org/licenses/by-sa/4.0