Abstract
This research is qualitative with data obtained from observation, interviews, and documentation. The data analysis techniques used are data reduction, data presentation, and conclusions. This research will be conducted in July 2023 at PT. Merpati Angkasa Abadi at Sultan Muhammad Kaharuddin Airport Sumbawa.
The result of this study is the performance of Ramp Handling in handling aircraft is to ensure all tools, needs and employees are ready to be positioned with their respective duties, and monitor the weather for the aircraft in order to land. In addition, the Ramp Handling Unit serves as a liaison between operational activities at the facility and operational activities at the terminal. To provide or ensure all activities on the aircraft and in the terminal run properly. The achievement of On Time Performance has been maximally optimized according to the time given by the company for 20 minutes the aircraft while on the ground, the Ramp unit makes excellent use of this time. The achievement of punctuality has been carried out optimally starting from before the plane landed. All jobs such as, helping cabin crew pick up garbage from the plane, communicating with pilots, and communicating with engineers to ensure the condition of the engine to raise passengers into the plane.