Analisis Pengaruh Number of Cycles terhadap Pengujian Durability Slake Batulempung pada Formasi Balikpapan dan Formasi Kampung Baru Kabupaten Kutai Kartanegara Provinsi Kalimantan Timur
(Muhammad Ashar Alias Suara, Tommy Trides, Rety Winonazada, Revia Oktaviani, Windhu Nugroho, Lucia Litha Respati, Henny Magdalena)
DOI : 10.61132/globe.v3i3.957
- Volume: 3,
Issue: 3,
Sitasi : 0 28-Jun-2025
| Abstrak
| PDF File
| Resource
| Last.08-Aug-2025
Abstrak:
Durability is defined as a measure of a rock's resistance to weathering and disintegration when the rock undergoes weathering processes over a short period of time. The susceptibility of rocks to disintegration is related to their low durability. Rock durability is often measured using the slake durability test. The slake durability test is widely used to assess physical changes resulting from wetting-drying processes (Franklin and Chandra, 1972). Therefore, slake durability testing is conducted to understand the weathering of rocks caused by heat and water, particularly clay stones which are one of the constituent rocks on a slope. The sampling location is around Sanga-sanga and Muara Badak. Sampling was conducted with coordinate points and the Balikpapan and Kampungbaru formations. The claystone samples taken were then brought to the Mineral and Coal Technology Laboratory of the Engineering Faculty of Mulawarman University for Slake Durability tests. In this study, the lowest index value obtained was 45.7% and the highest value was 93%, indicating high to very high durability. The difference in the durability index values of claystone at the research locations indicates the presence of variables that can affect the slake durability index values of the claystone in the Balikpapan and Kampungbaru formations, including grain size and mineral content as well as geological conditions at the research site. Based on the results of the claystone durability tests, the durability index value (Id2) was obtained, indicating that the sandstone at the research location falls into the classification of high to low.
|
0 |
2025 |
Evaluasi Unjuk Kerja Alat Gali-Muat pada Kegiatan Penambangan Batubara di PT. Insani Bara Perkasa Site Kam 11 Loajanan Kalimantan Timur
(Ruslan Patur, Harjuni Hasan, Henny Magdalena, Shalaho Dina Devi, Ardhan Ismail, Tommy Trides)
DOI : 10.61132/globe.v3i3.950
- Volume: 3,
Issue: 3,
Sitasi : 0 26-Jun-2025
| Abstrak
| PDF File
| Resource
| Last.08-Aug-2025
Abstrak:
This study aims to evaluate the performance of the loading and unloading equipment in coal mining activities at the Mahakam Pit, PT Insani Bara Perkasa Site Km 11, East Kalimantan. The research was motivated by the importance of achieving mechanical equipment performance standards according to the Decree of the Minister of Energy and Mineral Resources No. 1827 of 2018. Data were obtained through direct observation and analysis of actual working time and evaluation of operational constraint factors. The results of the analysis showed that before the evaluation, the mechanical availability (MA) value was 87.24%, physical availability (PA) 88.51%, availability utilization (UA) 88.73%, and effective utilization (EU) 78.54%. After evaluating the constraint time, there was an increase in all parameters: MA to 88.71%, PA to 89%, UA increased to 90%, and EU reached 80%. This evaluation also had an impact on increasing the productivity of the loading and unloading equipment from 268.41 bcm/hour to 284.43 bcm/hour. Thus, the evaluation of work obstacles is proven to be effective in increasing the efficiency and productivity of the digging-loading equipment at the research location.
|
0 |
2025 |
Analisis Biaya Fuel Consumption Alat Angkut Dump Truck dalam Aktivitas Pengangkutan Overburden PIT A9 PT. Mitra Abadi Mahakam Jobsite PT. Bukit Baiduri Energi
(Fajar Ramadhan, Harjuni Hasan, Albertus Juvensius Pontus, Henny Magdalena, Ardhan Ismail)
DOI : 10.61132/venus.v3i3.934
- Volume: 3,
Issue: 3,
Sitasi : 0 19-Jun-2025
| Abstrak
| PDF File
| Resource
| Last.06-Aug-2025
Abstrak:
Mitra Abadi Mahakam as a contractor operating at PT. Bukit Baiduri Energi's jobsite, especially in the Pit A9 area, faces operational challenges related to variations in haul road grades. Differences in road gradients on the overburden hauling route have the potential to cause significant differences in fuel consumption between dump truck units, which ultimately affects the overall efficiency of hauling activities. The study was conducted quantitatively with primary and secondary data requirements and through 3 stages. The study resulted in an average fuel consumption value in loaded conditions of 1.41 liters and in unloaded conditions of 0.18 liters. The average fuel ratio value in loaded conditions was 0.62 liters/second and in unloaded conditions of 0.32 liters/second. The cost of fuel consumption in loaded conditions was Rp. 4,972,800 ($301.92) and in unloaded conditions of Rp. 2,607,360 ($158.30)
|
0 |
2025 |
Perbandingan Perhitungan Volume Stockpile Batu Andesit Menggunakan Alat Survey Terrestrial Laser Scanner dan Global Positioning Sistem Real Time Kinematik pada PT. Bara Tabang
(Gideon Samari Suno, Henny Magdalena, Windhu Nugroho, Agus Winarno, Tommy Trides)
DOI : 10.61132/venus.v3i3.932
- Volume: 3,
Issue: 3,
Sitasi : 0 19-Jun-2025
| Abstrak
| PDF File
| Resource
| Last.06-Aug-2025
Abstrak:
Stockpiles are accumulations of materials such as coal or ore stored at specific locations. Accurate stockpile volume measurement is crucial in the mining and logistics industries for inventory management and cost efficiency. Conventional methods like Real-Time Kinematic (RTK) GPS rely on surface coordinate measurements but require numerous points, especially for irregular-shaped objects. Newer technologies like Terrestrial Laser Scanners (TLS) offer high-precision alternatives by capturing thousands of points per second, expediting and enhancing the resolution of volume measurements. This study compares TLS and RTK GPS methods in measuring the volume of andesite rock stockpiles at PT Bara Tabang. This research uses a quantitative approach, involving six Ground Control Points (GCPs) measured using the Sokkia GRX2 RTK GPS on October 24, 2024. TLS generated over 8.6 million point cloud data filtered down to 35,197 points, while RTK GPS yielded 2,276 coordinates. Accuracy testing showed very small RMSE values (RMSEr: 0.008 m; RMSEz: 0.007 m), and both LE90 and CE90 demonstrated 90% confidence within a 0.012 m range. Volume calculation using Surpac software with the cut and fill method showed TLS produced a volume of 18,766 bcm (51,982 tons/m³), while RTK GPS resulted in 18,694 bcm (51,782 tons/m³), with a difference of 72 bcm or 0.211%.These results indicate that both methods offer acceptable accuracy; however, TLS provides greater data density, efficiency, and precision, particularly for complex or large-scale stockpile objects. Therefore, TLS is recommended for high-accuracy volume measurement in mining operations that require efficiency and detailed analysis.
|
0 |
2025 |
Evaluasi Kegiatan Rehandling Batubara dan Kesesuaian Rencana Crushing pada ROM Port Area 2 PT Multi Harapan Utama
(Nirwana Putri, Windhu Nugroho, Tommy Trides, Henny Magdalena, Harjuni Hasan)
DOI : 10.61132/venus.v3i3.928
- Volume: 3,
Issue: 3,
Sitasi : 0 17-Jun-2025
| Abstrak
| PDF File
| Resource
| Last.08-Aug-2025
Abstrak:
In rehandling activities In coal processing activities, mechanical tools such as crushers are needed to obtain production results in accordance with the company's desired targets according to the crusher target, therefore in processing it is necessary to carry out precise calculations, so that the ability of the tool (crusher) and know what things greatly affect the production processing process, so that it can be used optimally and has a high efficiency value for optimal production. Therefore, it is necessary to evaluate the results of the crusher production and the productivity of the support unit during rehandling activities in achieving the production target at ROM Port Area 2 in order to adjust the ability of the tool and other influencing factors with the crusher production target desired by the company. Actual rehandling productivity meets the crusher production plan target of 1100tph. Productivity in each zone with DT wheel 10, namely zone H there are 2 of 120,620 tph and 154,935 tph, zone L of 135,351 tph, zone M of 138,313 tph, zone I of 189,709 tph. And constraints on the crusher during a month that also affect obstacles in rehandling include schedule time with a total time of 176.72 hours, breakdown time with a total time of 4.84 hours, unscheduled time with a total time of 154.62 hours.
|
0 |
2025 |
Analisis Coal Recovery dan Coal Losses pada Rangkaian Penambangan PIT X PT. Jembayan Muarabara Kutai Kartanegara, Kalimantan Timur
(Evita Endar Apriliana, Windhu Nugroho, Henny Magdalena)
DOI : 10.61132/venus.v3i3.881
- Volume: 3,
Issue: 3,
Sitasi : 0 09-Jun-2025
| Abstrak
| PDF File
| Resource
| Last.06-Aug-2025
Abstrak:
In mining activities, there is often a discrepancy between the plan and the actual conditions in the field, this discrepancy was found after reconciliation at the end of the progress (month). From the mining activities carried out by PT. Jembayan Muarabara (JMB), coal roof floor data was obtained from the survey which was then used to find survey tonnage, model tonnage data and actual tonnage scales. Then from this data it can be used to obtain coal recovery, coal looses in coal cleaning, loading, and coal transportation. The results of the study obtained tonnage data from the survey of 26,201.50 tons, a model of 26,488.50 tons and an actual tonnage of 24,885.09 tons. From the data obtained, the coal recovery value at the research location was 94.98% with coal losses in coal cleaning activities of 4.52% or 1196.39 tons and in loading activities of 0.5% or 120.02 tons with a tonnage discrepancy between planning and actual in the field of 1603.41 tons.
|
0 |
2025 |