Evaluasi Unjuk Kerja Alat Gali-Muat pada Kegiatan Penambangan Batubara di PT. Insani Bara Perkasa Site Kam 11 Loajanan Kalimantan Timur
(Ruslan Patur, Harjuni Hasan, Henny Magdalena, Shalaho Dina Devi, Ardhan Ismail, Tommy Trides)
DOI : 10.61132/globe.v3i3.950
- Volume: 3,
Issue: 3,
Sitasi : 0 26-Jun-2025
| Abstrak
| PDF File
| Resource
| Last.08-Aug-2025
Abstrak:
This study aims to evaluate the performance of the loading and unloading equipment in coal mining activities at the Mahakam Pit, PT Insani Bara Perkasa Site Km 11, East Kalimantan. The research was motivated by the importance of achieving mechanical equipment performance standards according to the Decree of the Minister of Energy and Mineral Resources No. 1827 of 2018. Data were obtained through direct observation and analysis of actual working time and evaluation of operational constraint factors. The results of the analysis showed that before the evaluation, the mechanical availability (MA) value was 87.24%, physical availability (PA) 88.51%, availability utilization (UA) 88.73%, and effective utilization (EU) 78.54%. After evaluating the constraint time, there was an increase in all parameters: MA to 88.71%, PA to 89%, UA increased to 90%, and EU reached 80%. This evaluation also had an impact on increasing the productivity of the loading and unloading equipment from 268.41 bcm/hour to 284.43 bcm/hour. Thus, the evaluation of work obstacles is proven to be effective in increasing the efficiency and productivity of the digging-loading equipment at the research location.
|
0 |
2025 |
Analisis Biaya Fuel Consumption Alat Angkut Dump Truck dalam Aktivitas Pengangkutan Overburden PIT A9 PT. Mitra Abadi Mahakam Jobsite PT. Bukit Baiduri Energi
(Fajar Ramadhan, Harjuni Hasan, Albertus Juvensius Pontus, Henny Magdalena, Ardhan Ismail)
DOI : 10.61132/venus.v3i3.934
- Volume: 3,
Issue: 3,
Sitasi : 0 19-Jun-2025
| Abstrak
| PDF File
| Resource
| Last.06-Aug-2025
Abstrak:
Mitra Abadi Mahakam as a contractor operating at PT. Bukit Baiduri Energi's jobsite, especially in the Pit A9 area, faces operational challenges related to variations in haul road grades. Differences in road gradients on the overburden hauling route have the potential to cause significant differences in fuel consumption between dump truck units, which ultimately affects the overall efficiency of hauling activities. The study was conducted quantitatively with primary and secondary data requirements and through 3 stages. The study resulted in an average fuel consumption value in loaded conditions of 1.41 liters and in unloaded conditions of 0.18 liters. The average fuel ratio value in loaded conditions was 0.62 liters/second and in unloaded conditions of 0.32 liters/second. The cost of fuel consumption in loaded conditions was Rp. 4,972,800 ($301.92) and in unloaded conditions of Rp. 2,607,360 ($158.30)
|
0 |
2025 |
Evaluasi Kegiatan Rehandling Batubara dan Kesesuaian Rencana Crushing pada ROM Port Area 2 PT Multi Harapan Utama
(Nirwana Putri, Windhu Nugroho, Tommy Trides, Henny Magdalena, Harjuni Hasan)
DOI : 10.61132/venus.v3i3.928
- Volume: 3,
Issue: 3,
Sitasi : 0 17-Jun-2025
| Abstrak
| PDF File
| Resource
| Last.08-Aug-2025
Abstrak:
In rehandling activities In coal processing activities, mechanical tools such as crushers are needed to obtain production results in accordance with the company's desired targets according to the crusher target, therefore in processing it is necessary to carry out precise calculations, so that the ability of the tool (crusher) and know what things greatly affect the production processing process, so that it can be used optimally and has a high efficiency value for optimal production. Therefore, it is necessary to evaluate the results of the crusher production and the productivity of the support unit during rehandling activities in achieving the production target at ROM Port Area 2 in order to adjust the ability of the tool and other influencing factors with the crusher production target desired by the company. Actual rehandling productivity meets the crusher production plan target of 1100tph. Productivity in each zone with DT wheel 10, namely zone H there are 2 of 120,620 tph and 154,935 tph, zone L of 135,351 tph, zone M of 138,313 tph, zone I of 189,709 tph. And constraints on the crusher during a month that also affect obstacles in rehandling include schedule time with a total time of 176.72 hours, breakdown time with a total time of 4.84 hours, unscheduled time with a total time of 154.62 hours.
|
0 |
2025 |
Analisis Konsumsi Bahan Bakar Alat Gali Muat-Angkut pada Kegiatan Pengupasan Overburden PIT Seloklai
(Roland Fatar, Harjuni Hasan, Albertus Juvensius Pontus)
DOI : 10.61132/venus.v3i3.844
- Volume: 3,
Issue: 3,
Sitasi : 0 15-May-2025
| Abstrak
| PDF File
| Resource
| Last.06-Aug-2025
Abstrak:
Fuel consumption is a necessity in moving mechanical equipment, where fuel consumption is influenced by road conditions, horsepower, and load factors. PT. Mitra Indah Lestari uses Hyundai 480 and Sany750-H excavators. The transport equipment used is Wechai WT90, Tonly TLD90, and Quester CWE 330. This study uses a quantitative method and obtains fuel consumption results, where the fuel consumption of the Hyundai 480 and Sany 750-H excavators is 37.89 liters/hour and 59.91 liters/hour, respectively. The fuel consumption of the Wechai WT90, Tonly TLD90, and Quester CWE 330 transport equipment is 25.19 liters/hour; 27.53 liters/hour; and 10.66 liters/hour, respectively.
|
0 |
2025 |
Evaluasi Performance Ban Micheline dan Brigstone Alat Angkut pada Pengangkutan Overburden dari Front Kerja Ke Disposal PT.Kaltim Diamond Coal Kabupaten Berau Kalimantan Timur
(Yoga Achmad Rynaldy, Harjuni Hasan, Tommy Trides)
DOI : 10.61132/globe.v3i2.817
- Volume: 3,
Issue: 2,
Sitasi : 0 29-Apr-2025
| Abstrak
| PDF File
| Resource
| Last.08-Aug-2025
Abstrak:
Dump truck tires are an important component in the operation of wheel-type units that require routine inspection because they directly affect the availability and performance of the transport equipment. In the OHT 777 type unit, six tires are used with a configuration of two tires in the front and four tires in the rear. This study aims to evaluate tire performance through the analysis of Key Performance Indicator (KPI) parameters, namely Ton Kilometer Per Hour (TKPH), Tread Utilization Rate (TUR), and tire life (lifetime), in order to assess the achievement of performance targets. The research method uses a quantitative approach with actual data collection in the field, including the preparation stages, primary and secondary data collection, data processing, and preparation of the final report. The data is processed to obtain the tire KPI value. The results of the analysis show that the TUR value for MICHELIN brand tires is 68.9% and BRIDGESTONE is 70.7%, still below the company's target of 85%. The TKPH value for the OHT 773 unit is 149 (with a TKPH rating of 207) and the 777 unit is 241 (with a TKPH rating of 514). The actual lifetime of BRIDGESTONE tires was recorded at 1,698.6 hm and MICHELIN at 2,268 hm, far below the target of 8,500 hm. Tire damage found included impact (23%), sidewall damage (18%), run flat (18%), bread damage (18%), sounder cut (14%), and foreign object puncture (9%). This evaluation is expected to be the basis for improving tire management, so that tire performance in the future can be more optimal and support the smooth operation of the unit.
|
0 |
2025 |
Studi Sistem Drainase Air Tambang Batubara di Sump Pit Bara4 PT Berkat Anugerah Sejahtera
(Faras Dwi Putra, Salaho Dina Devy, Agus Winarno, Harjuni Hasan, Windhu Nugroho)
DOI : 10.61132/globe.v3i2.816
- Volume: 3,
Issue: 2,
Sitasi : 0 28-Apr-2025
| Abstrak
| PDF File
| Resource
| Last.08-Aug-2025
Abstrak:
Open-pit mining system mining is greatly influenced by surface runoff, rainwater and groundwater. This surface water runoff is highly dependent on rainfall catchment areas, climate, and land use. Handling surface water runoff entering the mining area by creating water channels in the form of open channels and closed channels. One of the mining methods that is generally carried out in Indonesia is the open-pit mining method, which is widely found in East Kalimantan. Large basins will be created as a result of this mining technique, which could eventually serve as a reservoir for water from both surface runoff and groundwater. Therefore, an analysis of the runoff water output in the sump is required, sump capacity and appropriate pumping ratio so that mining activities can continue. The results of the study obtained the runoff discharge value in the sump was 4,071.37 m3/day, the sump capacity was 207,474.07 m3, the water balance in the sump with a total runoff discharge of 5,871.37 m3/day, and the existing volume of water in the sump was 24,771 m3. evaporation of 4.36 m3/day, infiltration of 91.36 m3/day, and pump discharge of 8,229.27 m3/day. A pumping ratio of 0.71 was obtained.
|
0 |
2025 |
Pengolahan Air Asam Tambang dengan Limbah Tempurung Sawit untuk Adsorpsi Fe, Mn, dan pH Pond
(Evo Kristina, Agus Wirnarno, Harjuni Hasan, Windhu Nugroho, Lucia Litha Respati)
DOI : 10.61132/globe.v3i2.814
- Volume: 3,
Issue: 2,
Sitasi : 0 23-Apr-2025
| Abstrak
| PDF File
| Resource
| Last.06-Aug-2025
Abstrak:
One of the negative impacts of the mining process is acid mine drainage which is formed from the oxidation of minerals containing iron sulfur, such as pyrite (FeS2) and pyrothite (FeS) by oxidizers such as water and oxygen. To handle or control acid mine drainage, one way is to use activated carbon or often referred to as activated charcoal, which is a type of carbon that has a very large surface area. Charcoal is a porous solid that contains 85% to 95% carbon, produced from materials containing carbon by heating at high temperatures without oxygen (pyrolysis). Activated carbon made from palm shells is an adsorbent that can be used to treat coal mine acid water, so that the water meets standards for flowing into the environment. This study used concentration variants of 4 grams, 6 grams, 8 grams and contact times of 30 minutes, 60 minutes and 150 minutes. The results of this study show that the concentration of palm oil shell activated carbon adsorbent influences the reduction of iron (Fe) and manganese (Mn) metal levels as well as the pH conditions in acid mine drainage water. The higher the concentration and the longer the contact time, the more heavy metals are adsorbed, the contact time is the highest. The optimal concentration in this study was 150 minutes and the optimal concentration was 8 grams with physical activation.
|
0 |
2025 |
Pengaruh Total Resistance Terhadap Produksi Dump Truck Lgmg CMT96 Pada Pengangkutan Overburden PT Ansaf Inti Resources Kabupaten Kutai Kertanegara Provinsi Kalimantan Timur
(Arsuwendi Arsuwendi, Harjuni Hasan, Albertus Juvensius Pontus)
DOI : 10.61132/manufaktur.v3i1.773
- Volume: 3,
Issue: 1,
Sitasi : 0 27-Feb-2025
| Abstrak
| PDF File
| Resource
| Last.06-Aug-2025
Abstrak:
PT Ansaf Inti Resources is a company engaged in coal mining using the open pit method. In the process of mining in open pit mines, haul roads are indispensable in the process of transporting overburden and play an important role in the mining production cycle. The purpose of the study is to determine the total resistance to overburden production of the LGMG CMT96 conveyance based on the haul road segment that has been determined from the overburden loading point to the disposal of the material, then a calculation is made based on the standard number of good total resistance to the actual haul road. After calculating all segments of the haul road, the results of plotting the total obstacle graph against the speed, travel time, and production of the haul. So every 1% increase in total resistance will reduce the speed of the conveyance 1.346 km / h, while every 1% increase in total resistance will reduce the travel time of the conveyance 0.0464 minutes. The production results of the CMT96 conveyance before the improvement of the total obstacle to the road surface amounted to 55 lcm and 49 lcm, while after the improvement of the total obstacle to the road surface there was an increase in the production of the conveyance of 68 lcm and 62 lcm. So every 1% increase in total resistance will reduce the production of conveyance by 4.7429 lcm.
|
0 |
2025 |
Penentuan Geometri Jalan Akses Berdasarkan Aashto dan Kepmen 1827 di Pit A4 Benaung PT.Energi Cahaya Industritama
(Arya Mu’min Wally, Tommy Trides, Agus Winarno, Harjuni Hasan, Revia Oktaviani)
DOI : 10.61132/konstruksi.v3i1.716
- Volume: 3,
Issue: 1,
Sitasi : 0 14-Jan-2025
| Abstrak
| PDF File
| Resource
| Last.06-Aug-2025
Abstrak:
Mining roads are one of the most important facilities that greatly affect the smoothness of production and affect mining costs. Therefore, the construction of mining roads must be carried out carefully to meet technical and work safety standards. Road conditions, distance, road slope and road carrying capacity will greatly affect the production capacity of heavy equipment, especially the production capacity of transport equipment. The location of this research is at PT. Energi Cahaya Industritama, precisely in Palaran sub-district, Samarinda city, East Kalimantan province. After observations were made at the research location, it was found that the geometric conditions of the road did not comply with the standards based on the overburden transport equipment or the largest transport equipment, for example, the width of the road on bends and the slope of the road. After conducting the research, the results of the data from the geometry of the access road were obtained, namely, the actual condition of the geometry of the access road on the straight road width is divided into 6 segments with a width of 13.3 meters, 14.3 meters, 14.5 meters, 13.2 meters, 15 meters, 15.7 meters. Meanwhile, the width of the bend road is also divided into 2 segments with a width of 15.9 meters and 15.5 meters respectively. And on the slope of the road there are 2 segments with values ??of 11.1% and 14.8% respectively. Based on the results of the simulation software, the productivity of the transport equipment was obtained at 92.42 BCM/hour, which shows that productivity has increased by 12.23 BCM/hour from the actual productivity value of 80.109 BCM/hour. It has an average cycle time of 10.33 minutes, which shows a reduction in time or 6.01 minutes faster than the actual average cycle time of 16.34 minutes.
|
0 |
2025 |