+62 813-8532-9115 info@scirepid.com
Judul | Sitasi | Tahun |
---|---|---|
Operational Risk Analysis of kWh Addition Services Using the RCA (Root Cause Analysis) Method at PT XYZ
(Annisa Maudi Syafitri, Dira Ernawati)
DOI : 10.61132/ijmicse.v1i4.131 - Volume: 1, Issue: 4, Sitasi : 0 30-Dec-2024 | Abstrak | PDF File | Resource | Last.08-Aug-2025 |
0 | 2024 |
Analisa Penyebab Rework Pada Proses Produksi Produk Furniture Polo Showcase 2df Wht Menggunakan Metode Failure Mode And Effect Analysis (Fmea)
(Prastyo Utomo, Dira Ernawati)
DOI : 10.59581/jkts-widyakarya.v2i1.2415 - Volume: 2, Issue: 1, Sitasi : 0 02-Jan-2024 | Abstrak | PDF File | Resource | Last.02-Aug-2025 |
0 | 2024 |