SciRepID - Pemeliharaan Kubikel 20 KV di PT.Haleyora Powerindo

📅 04 December 2024
DOI: 10.61132/venus.v2i6.635

Pemeliharaan Kubikel 20 KV di PT.Haleyora Powerindo

Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Asosiasi Riset Ilmu Teknik Indonesia (ARITEKIN)

📄 Abstract

Maintenance of 20 kV cubicles at PT. Haleyora Powerindo is a crucial step in ensuring the reliability and safety of the electrical distribution system. This process includes preparation stages such as inspecting work equipment, coordinating power outages, and utilizing safety equipment (PPE) to minimize the risk of accidents. Subsequent steps involve voltage disconnection, verifying zero voltage using detection tools, cleaning components with specialized fluids, and drying to ensure that moisture does not cause disruptions. Once all stages are completed, the voltage is carefully reactivated, and a maintenance report is prepared to document the process. This study employs direct observation, interviews, and document analysis to evaluate the maintenance implementation and provide recommendations for quality improvement. The results are expected to serve as a guide for other companies in enhancing the efficiency and reliability of 20 kV cubicle maintenance to ensure a stable electricity supply.
 
 

🔖 Keywords

#20 kV cubicle; periodic maintenance; electrical distribution

ℹ️ Informasi Publikasi

Tanggal Publikasi
04 December 2024
Volume / Nomor / Tahun
Volume 2, Nomor 6, Tahun 2024

📝 HOW TO CITE

Johan Hidayat; Muhammad Fatkhurrokhman, "Pemeliharaan Kubikel 20 KV di PT.Haleyora Powerindo," Venus: Jurnal Publikasi Rumpun Ilmu Teknik, vol. 2, no. 6, Dec. 2024.

ACM
ACS
APA
ABNT
Chicago
Harvard
IEEE
MLA
Turabian
Vancouver

🔗 Artikel Terkait dari Jurnal yang Sama

📊 Statistik Sitasi Jurnal

Tren Sitasi per Tahun