Klaim Artikel Anda
Verifikasi kepemilikan artikel akademik
Apakah artikel-artikel ini milik Anda?
Daftarkan diri Anda sebagai author untuk mengklaim artikel dan dapatkan profil akademik terverifikasi dengan fitur lengkap.
Badge Verifikasi
Profil terverifikasi resmi
Statistik Lengkap
H-index, sitasi, dan metrik
Visibilitas Tinggi
Tampil di direktori author
Kelola Publikasi
Dashboard artikel terpadu
Langkah-langkah Klaim Artikel:
- 1. Daftar akun author dengan email akademik Anda
- 2. Verifikasi email dan lengkapi profil
- 3. Login dan buka menu "Klaim Artikel"
- 4. Cari dan klaim artikel Anda
- 5. Tunggu verifikasi dari admin (1-3 hari kerja)
Menampilkan 1–4 dari 4 artikel
Project Cost Analysis Using the Earned Value Method on the Bagor Bridge Replacement Project in Situbondo Regency
Yonandika Pandu Putranto
; Andi Patriadi
; Sajiyo Sajiyo
International Journal of Mechanical, Electrical and Civil Engineering
Vol 2
, No 1
(2025)
Delays in project implementation are caused by a lack of good control so that it affects the cost and completion time. The purpose of the study is to determine or predict how much a project will cost at the time of implementation and to determine the effectiveness of project control using the Earned Value Method. Aspects of project implementation time in weeks 2,4,5,9,11,13,16,17, 18,20,21,24 are slower than the planned schedule, this is indicated from the Schedule Variant (SV) indicator. While...
Sumber Asli
Google Scholar
DOI
Analysis of the Correspondence Between the Type of Road Damage and the Budget Costs Incurred in Handling on Provincial Roads in the Madura Region
Adi Kurniawan
; Andi Patriadi
; Sajiyo Sajiyo
International Journal of Mechanical, Electrical and Civil Engineering
Vol 2
, No 1
(2025)
This study aims to analyze the suitability between the type of road damage and the budget costs incurred on provincial roads in the Madura region. The research method used road condition survey and questionnaire distribution to contractors, consultants, budget users, and local communities. Data analysis was done descriptively qualitatively, including the type, volume, and location of road damage. The results showed that the three most common types of road damage were cracks, potholes and ravelin...
Sumber Asli
Google Scholar
DOI
Sensitivity Analysis of North Surabaya Hospital Investment Feasibility
Lestyanto Wahyu
; Andi Patriadi
; Sajiyo Sajiyo
International Journal of Mechanical, Electrical and Civil Engineering
Vol 2
, No 1
(2025)
The aim of this research is to analyze the feasibility of investing in North Surabaya Hospital, Bulak District, Surabaya City with the parameters Net Present Value, Internal Rate of Return, Benefit Cost Ratio (BCR) and Payback Period. This research focuses on the North Surabaya Hospital which was built by the Surabaya City Government Health Service with a budget for 2026. The research instruments used were interview guidelines and observation sheets, with data collection procedures via location...
Sumber Asli
Google Scholar
DOI
Analysis of the Sensitivity Level of Investment in the Development of Regional Public Hospitals (RSUD) Bhakti Dharma Husada Surabaya City on the Components of Revenue Costs, Management Costs and Interest Rates
Septi, Intan Anastasia
; Patriadi, Andi
; Sajiyo Sajiyo
International Journal of Mechanical, Electrical and Civil Engineering
Vol 2
, No 1
(2025)
Since its first operation in 2010, Bhakti Dharma Husada Regional Public Hospital (RSUD) has experienced an increase in patient demand for health services. Some services now require additional space. Moreover, there is a growing need for executive and VIP services. To address these needs, Bhakti Dharma Husada Regional Public Hospital is planning to enhance its services by constructing a new building. Based on the results of investment analysis obtained Net Present Value (NPV) of Rp. 1,373,606,103...
Sumber Asli
Google Scholar
DOI