Klaim Artikel Anda
Verifikasi kepemilikan artikel akademik
Apakah artikel-artikel ini milik Anda?
Daftarkan diri Anda sebagai author untuk mengklaim artikel dan dapatkan profil akademik terverifikasi dengan fitur lengkap.
Badge Verifikasi
Profil terverifikasi resmi
Statistik Lengkap
H-index, sitasi, dan metrik
Visibilitas Tinggi
Tampil di direktori author
Kelola Publikasi
Dashboard artikel terpadu
Langkah-langkah Klaim Artikel:
- 1. Daftar akun author dengan email akademik Anda
- 2. Verifikasi email dan lengkapi profil
- 3. Login dan buka menu "Klaim Artikel"
- 4. Cari dan klaim artikel Anda
- 5. Tunggu verifikasi dari admin (1-3 hari kerja)
Menampilkan 1–5 dari 5 artikel
Comparison Of The S Curve With The CPM Method In Analyzing Project Scheduling
International Journal of Industrial Innovation and Mechanical Engineering
Vol 1
, No 3
(2024)
Project management is managing projects by considering all aspects of construction projects. A project must run according to plan and can be completed on time, so planning is needed before a project runs; scheduling must be considered. Scheduling is an important step in determining the exact duration and sequence for each activity in the project to create a logically structured schedule that can be implemented realistically. Many methods can be applied in project scheduling, such as S Curve and...
Sumber Asli
Google Scholar
DOI
Analysis Of Labor Qualifications Using The Resource Leveling Method On The Main Structure Work Of Multi-Story Buildings
International Journal of Mechanical, Industrial and Control Systems Engineering
Vol 1
, No 2
(2024)
Construction projects are related to infrastructure development in Indonesia, which is an important foundation for economic growth by supporting mobility, trade, and connectivity between regions. Infrastructure development also supports the utilization of labor resources in Indonesia. This research aims to analyze the availability of labor in a construction project. The Resource Leveling method is used to level the labor needs in the project. The results showed that there was an allocation of la...
Sumber Asli
Google Scholar
DOI
The Risk Analysis of Work Accidents Using The Bowtie Method in The Ciputra Hospital Construction Project
Jurnal Teknik Sipil
Vol 17
, No 1
(2024)
The condition of work accident risk is a critical factor that needs to be taken seriously. Related to the construction of the Ciputra Hospital Project located on Jl. Made Selatan - Citraland Surabaya, the Ciputra Hospital project is planned to be built on nine floors with a building area of 23,000 m2, which will allow for various occupational accident risks. So, a risk analysis is needed to identify hazards that can occur. In this study, data collection was carried out through interviews and als...
Sumber Asli
Google Scholar
DOI
The Implementation of BIM Tekla Structure on Quantity Take Off for Structural Works of X Building Project
Jurnal Teknik Sipil
Vol 17
, No 1
(2024)
BIM technology in the construction world is growing. However, the application of BIM in Indonesia has not been carried out thoroughly. BIM technology can help quantity take off work that affects the success or failure of a project. BIM can reduce the error rate of quantity take off planning calculations compared to manual calculations. Tekla Structure is one of the software developments of BIM that can produce quantity take off building output along with 3D visualisation. This research conducts...
Sumber Asli
Google Scholar
DOI
Analysis of Domestic Component Level (TKDN) and Company Benefit Weight (BMP) in Construction Projects
International Journal of Mechanical, Electrical and Civil Engineering
Vol 1
, No 3
(2024)
In the world of construction projects, good project management is required, including the use of domestic products. The government encourages the use of domestic products through the program to increase the use of domestic production (P3DN). The amount of domestic content in commodities, services, and the combination of products and services can be used to measure the use of domestic products. This quantity is called the Domestic Component Level (TKDN). Company Benefit Weight (BMP) is an award g...
Sumber Asli
Google Scholar
DOI