Assyfa Hermalia Puteri; Ananda Edo Pratama; Indra Ginanjar; Defagy Faudril; Moch Paridzi Almauludy +3 more

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2026 Asosiasi Riset Ilmu Teknik Indonesia

Heavy equipment effectively plays a key role in ensuring productivity and efficiency in the precast concrete industry of spun pile concrete at PT Adhi Beton Purwakarta. One of the heavy equipment that plays an important role is the mobile crane, especially for moving large concrete components. In this study, field data was processed by analyzing the productivity and efficiency of the Tadano GR-500EXL type mobile crane with a capacity of 50 tons. Current problems are high idle time, lack of operational synchronization, and suboptimal utilization of technological features on the crane unit. The results show that spun pile concrete weighing 6.78 tons based on the analysis of heavy equipment productivity is 40.68 tons/hour with the number of mobile crane heavy equipment needed as many as 2 units, and the efficiency for crane heavy equipment reaches around 68%. The amount of productivity and needs are to support the target of achieving precast concrete production, especially spun pile concrete. Thus, it is expected that the amount of productivity and the number of mobile crane heavy equipment needs are optimal to support production.

Rika Fitri Destiana; Ayu Hapsari, Rahma Nindya

Journal of Civil Engineering and Technology Sciences 2025 Faculty Of Engineering University 17 August 1945 Semarang

Penelitian ini menganalisis kekuatan pondasi tiang pancang pada proyek pembangunan Apartemen Arjuna Bima di Kabupaten Sleman. Penyidikan tanah menggunakan boring pada titik B2 menunjukkan bahwa lapisan tanah keras maksimum berada pada kedalaman 25 meter, sementara hasil bor tangan mengidentifikasi tanah berupa pasir sedang berwarna coklat keabu-abuan. Tiang pancang dipilih karena kemampuannya untuk memadatkan tanah pasir sedang selama proses pemancangan. Penelitian ini menggunakan metode kuantitatif dengan teknik pengumpulan data sekunder melalui studi literatur dan dokumentasi. Semua perhitungan dilakukan menggunakan metode Meyerhof, sedangkan analisis pembebanan struktur dilakukan dengan perangkat lunak ETABS v22. Analisis ini mencakup perhitungan kapasitas dukung aksial, kapasitas dukung lateral, dan penurunan pondasi akibat beban struktur atas. Hasil analisis menunjukkan bahwa beban aksial (P) sebesar 710,77 ton. Kapasitas dukung aksial kelompok tiang pancang (Qg) dengan diameter 80 cm, 60 cm, dan 42,9 cm pada kedalaman 20 m berturut-turut adalah 2.125,87 ton; 1.347,68 ton; dan 710,51 ton. Kapasitas dukung lateral (Hg) untuk ukuran tiang yang sama berturut-turut adalah 1.169,9 ton; 877,4 ton; dan 627,4 ton. Penurunan pondasi kelompok tiang (Sg) masing-masing adalah 2,46 cm; 2,1 cm; dan 2,03 cm. Berdasarkan hasil analisis, pondasi tiang pancang dengan diameter 80 cm dan 60 cm memenuhi syarat keamanan baik dari segi kapasitas dukung aksial maupun lateral, serta penurunan pondasi. Namun, untuk tiang pancang dengan diameter 42,9 cm, kapasitas dukung aksial tidak memenuhi syarat keamanan (Qg < P), sehingga tidak direkomendasikan untuk digunakan.

Nayla Hanna Ariza; Wulandari Wulandari; Sandi Prayoga; Abdillah Mursyid; Deny Ernawan

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2025 Asosiasi Riset Ilmu Teknik Indonesia

This study aims to optimize the productivity of Crawler Crane heavy equipment in lifting precast concrete structural elements at PT Wijaya Karya Beton Tbk. The method used is a descriptive qualitative approach with data collection through direct observation in the field. The data is based on the equipment's operating cycle time and work efficiency. The results of the study show that the Crawler Crane heavy equipment used by PT Wijaya Karya Beton Tbk. produces a productivity of 20 tons/hour or 160 tons/day for 8 hours with the need for 2 units of crawler crane heavy equipment, resulting in a work efficiency of 80%. So the productivity results from the calculation have been optimal, so it is hoped that the results of this study can be a reference in the management of heavy equipment, especially Crawler Cranes in construction work at the Company PT. Wijaya Karya Beton Tbk.

PUTRA, FERDIANSYAH; Satria Pradana; Eza Dafa Pratama; Jessica Oktaviani Janny

Journal of Civil Engineering and Technology Sciences 2024 Faculty Of Engineering University 17 August 1945 Semarang

Pelaksanaan proyek konstruksi ini pada Proyek Pembangunan Gedung Resto Cafe 5 Lantai akan membutuhkan pendekatan inovatif untuk menyelesaikan masalah konstruksi yang tidak sesuai. Oleh karena itu, penerapan mode konstruksi dapat membantu menyelesaikan konstruksi. Pondasi merupakan bagian bawah bangunan bangunan yang menahan dengan gaya-gaya beban atas. Pemilihan metode konstruksi pondasi mempunyai pengaruh yang signifikan terhadap keakuratan konstrusksi. Tanah juga memiliki perbedaan kondisi dengan rencana seperti, kelembaban tanah akibat hujan, tiang yang menimbulkan kebisingan, pencemaran udara, dan faktor lainnya. Pondasi harus diperhatikan untuk menjamin kestabilan terhadap gaya luar seperti berat bangunan sendiri, beban isi bangunan, tekanan angina, dan gempa bumi. Pondasi terdiri dua jenis yaitu pondasi dangkal dan pondasi dalam. Dalam proyek ini berdasarkan data yang diperoleh hasil sondir untuk struktur angunan 44 meter. Dan proyek ini menggunakan tiang pancang karena relatif, pengirimian yang signifikan. Dan pada proyek ini menggukan metode konstruksi tiang pancang yaitu metode jack-in-pile yang dapat mengurangi polusi suara lingkungan.

Andrey Muhammad Nasution; Darlina Tanjung; Jupriah Sarifah

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2024 Asosiasi Riset Ilmu Teknik Indonesia

The foundation is a substructure which functions to support the loads and forces caused by the superstructure (superstructure) to the soil layer which will carry these loads and forces. Deep foundations are usually used to obtain a large enough soil bearing capacity and if the depth of the hard soil is far below the ground surface. The aim of this task is to analyze the bearing capacity of pile foundations using sondir data, standard penetration test (SPT) data, as well as the finite element method using the plaxis program. The method used in this final assignment is by studying literature, then collecting the necessary data, and after that carrying out calculation analysis using existing methods. From the results of the calculations carried out, different results were obtained. Where for sondir data at point S1 obtained Qu =115.80 tons; at point S2 obtained Qu = 104.80 tons; at point S3 obtained Qu = 105.50 tons. Meanwhile, based on SPT data at point BH-01, Qu = 398.23 tons, and using the plaxis program Qu = 425 tons

Hutasoit, Eva Olivia; Rizkiyah, Awaliatul

Jurnal Teknik Sipil 2023 Faculty Of Engineering University 17 August 1945 Semarang

The pile foundation is a deep foundation that is often used in the construction of high-rise buildings and small-scale buildings. The foundation is required to have a greater bearing capacity than the load on it. This study aims to determine the maximum bearing capacity of the foundation against the work load including the additional load from the 15-story Lamongan Muhammadiyah University building which was found to be cracked. Calculation of the bearing capacity of a single pile is carried out to determine the bearing capacity of a single pile using the Mayerhoff, Reese O'neil, and Reese and Wright method. Calculation of the bearing capacity of group piles is carried out to determine the bearing capacity of piles in one group using the Converse-Labarre, Los Angle Group, and Seiler-Keeney methods. Controlling the bearing capacity of single and group pile foundations, whether they are able to withstand the load on them using the axial loads and moments obtained. The results of the calculation of the bearing capacity of a single pile foundation at a depth of 30 m using the Meyerhoff calculation method obtained the carrying capacity of a single pile permit (Q_a) at point DB-1 of 916,80 tons and DB-2 of 916,80 tons, Reese and O' neil obtained Power single pile permit bearing (Q_a) at point DB-1 of 668,67 tons and DB-2 of 668,67 tons, Reese and Wright obtained single pile permit bearing capacity (Q_a) at point DB-1 of 1.070,08 tons and a DB-2 of 1.070,08 tons, while the shamanic strength of the largest pile group foundation was obtained using the Converse-Labarre method with ultimate bearing capacity using the Reese anad Wright method, bearing configuration from the pile group capacity (Q_g) (2 x 2) obtained at point DB -1 of 9.733,45 tons and DB-2 of 9.733,45 tons, configuration (2 x 3) at point DB-1 of 13.810,45 tons and DB-2 of 13.810,45 tons, configuration (3 x 2 ) at point DB-1 of 13.810,45 tons and DB-2 of 13.810,45 tons. The results of controlling the bearing capacity of the foundation by looking at the value of the allowable bearing capacity is greater than the value of the axial load (P ≤ Q_g). From the calculation of the bearing capacity of the piles it can be concluded that the pile foundations at points DB-1 and DB-2 are safe.

Aldo Dwizadana Akbar; Gede Sarya

Jurnal Teknik Sipil 2023 Faculty Of Engineering University 17 August 1945 Semarang

Abstract. Delays in project completion can be caused by ineffective project management, modifications to specifications made by planners, and delays in material procurement. SP road preservation construction project completion. ITCHI – SP. 3 Riko Segment II could be delayed as a result of alterations to piling specifications by the planner and delays in the procurement of piles. An effective and efficient network and the acceleration of project activities are required to prevent project completion delays. In this study, activities on the project's critical path are analyzed using the Critical Path Method and Microsoft Project 2013 software. The purpose of this research is to analyze the activities on the project's critical path, as well as the cost and duration of work items on the project's critical path. Additionally, the duration of the SP road preservation construction project will be analyzed. After expediting work along the critical path, ITCHI – SP. 3 Riko Segment II was completed. The original project completion time of 344 calendar days can be shortened to 240 calendar days for a fee of IDR 51,153,849,429.30. Keywords: Critical Path Method, Microsoft Project 2013, Project acceleration. Abstrak. Keterlambatan penyelesaian proyek dapat disebabkan oleh manajemen proyek yang tidak efektif, modifikasi spesifikasi yang dilakukan oleh perencana, dan keterlambatan pengadaan material. Penyelesaian proyek pembangunan preservasi jalan SP. ITCHI – SP. 3 Riko Segmen II dapat mengalami keterlambatan akibat perubahan spesifikasi tiang pancang oleh perencana dan keterlambatan pengadaan tiang pancang. Jaringan kerja yang efektif dan efisien serta percepatan kegiatan proyek diperlukan untuk mencegah keterlambatan penyelesaian proyek. Pada penelitian ini, aktivitas pada jalur kritis proyek dianalisis menggunakan Critical Path Method dan software Microsoft Project 2013. Tujuan dari penelitian ini adalah untuk menganalisis aktivitas pada jalur kritis proyek, serta biaya dan durasi item pekerjaan pada jalur kritis proyek. Selain itu, durasi proyek pembangunan preservasi jalan SP akan dianalisis. Setelah mempercepat pekerjaan di sepanjang jalur kritis, ITCHI – SP. 3 Riko Segmen II selesai. Waktu penyelesaian proyek yang semula 344 hari kalender dapat dipersingkat menjadi 240 hari kalender dengan biaya Rp 51.153.849.429,30. Kata Kunci: Critical Path Method, Microsoft Project 2013, Percepatan Proyek

Salim, Mukhamad Afif; Agus Bambang Siswanto; Hari Setijo Pudjihardjo

Journal of Civil Engineering and Technology Sciences 2023 Faculty Of Engineering University 17 August 1945 Semarang

Proyek Pembangunan Kantor Pemerintahan Terpadu (KPT) Kabupaten Brebes merupakan salah satu proyek fenomenal pemerintah daerah Kabupeten Brebes tahun anggaran 2021, pembangunan ini merupakan tujuan dari pemerintah Kabupaten Brebes untuk merealisasikan penataan kantor pemerintahan yang layak dan terpusat dalam satu kawasan sehingga dapat dijalankanya pelayanan masyarakat secara maksimal. Bangunan gedung pemerintahan ini direncanakan memiliki enam lantai dengan jenis pondasi yang digunakan ialah pondasi tiang pancang spun pile. Dalam penelitian ini yang akan dilakukan adalah mengetahui perbandingan sistem metode kerja pemancangan antara Diesel hammer dengan Hydraulic static pile driver dalam pembangunan. Penelitian yang digunakan adalah penelitian kualitatif dengan studi kasus. Data berbentuk kuantitatif (angka), pembahasan disajikan dalam bentuk data dengan membandingkan dari segi waktu, biaya, dan serta mutu dari masing masing metode kerja. Pembahasan dan tahapan analisis yang dilakukan antara lain mulai dari pengumpulan data, membuat metode pekerjaan, menghitung waktu pelaksanaan dan rencana anggaran biaya, mengidentifikasi mutu pekerjaan dan menganalisa kelebihan dan kekurangan dari kedua metode. Dari analisis diketahui bahwa penggunaan metode pemancangan Hydraulic static pile driver (HSPD) memiliki efisiensi pada waktu pelaksanaan pekerjaan yang lebih cepat dan hasil mutu pelaksanaan yang lebih bagus, serta ramah bagi bangunan di lingkungan sekitar. Tetapi kekurangannya adalah biaya yang dikeluarkan lebih besar. Sedangkan kelebihan utama penggunaan metode pemancangan Diesel hammer adalah rencana anggaran biaya yang lebih kecil daripada metode HSPD, tetapi metode pemancangan Diesel hammer memiliki banyak kekurangan, yaitu lama dalam proses pekerjaan, kurangnya mutu dari hasil pemancangan, dan proses pelaksanaan pekerjaan kurang ramah bagi bangunan di lingkungan sekitar. Bedasarkan analisa perhitungan waktu dan biaya penggunaaan metode Diesel hammer memiliki total waktu pekerjaan selama 39 hari dengan memakan biaya sebesar Rp. 184.619.000,00. sedangkan penggunaaan metode HSPD memiliki total waktu pelaksanaan selama 18 hari, dan memakan biaya pekerjaan sebesar Rp. 160.661.000,00. sehingga terdapat efisiensi waktu kerja dan penggunaan biaya dari kedua metode pemancangan

Jaenal Musianirudin; Mindiastiwi, Tigo

Jurnal Teknik Sipil 2022 Faculty Of Engineering University 17 August 1945 Semarang

Tanah Lempung adalah jenis tanah yang mempunyai sifat kohesif dan plastis yang tinggi, tanah lempung terjadi akibat pelapukan-pelapukan batuan akibat adanya reaksi kimia yang terdiri dari susunan partikel-partikel yang berukuran koloid artinya butiran penyusun tanah lempung ini berukuran <0,002. Tujuan penelitian ini untuk mengetahui karakteristik tanah serta mengetahui pengaruh campuran semen dan serbuk batu bata sebagai bahan stabilisasi dengan metode kuat tekan bebas. Metode yang digunakan dalam penelitian ini adalah metode uji laboratorium berupa pengujian sifat – sifat fisis dan mekanis tanah. Penujian dilakukan pada tanah asli dan tanah yang distabilisasi dengan semen dan serbuk batu bata. Hasil penelitian uji sifat fisis tanah asli dilaboratorium didapatkan nilai berat isi tanah (γb) 1,669 gr/cm³, (γd) 1,09 gr/cm³, kadar air 52,92% dan berat jenis 2,651. Berdasarkan hasil penyelidikan tanah dapat dikategorikan dalam tanah lempung organik. Hasil dari pengujian grain size tanah dapat di kategorikan dalam tanah lanau lempung. Pada uji atterberg limit tanah dapat dikategorikan ke dalam tanah lempung plastisitas tinggi dengan PI 26,54%, pengujian proctor dengan hasil berat isi kering maksimal (γd) 1,302 gr/cm³ dan kadar air optimum (w) 36,2%. Berdasarkan hasil pengujian kuat tekan bebas (Uncofined Compression Test) dengan bahan stabilisasi serbuk batu bata 5%, 7%, 10%, 12% dan 5% semen untuk masing-masing sampel, dengan nilai kuat tekan bebas (qu) yaitu 0,785 kg/cm², 0,872 kg/cm², 1,008 kg/cm², 1,120 kg/cm², dan nilai kohesi undrained (cu) sebesar 0,205 kg/cm², 0,390 kg/cm²,0,435 kg/cm², 0,505 kg/cm², 0,560 kg/cm². Berdasarkan rekap uji kuat tekan bebas  (qu) dan didapatkan persamaan  y = 0,2127ln(x) + 0,2153 R² = 0,9855.

Muhammad Babul Uyun; Titin Sundari; Totok Yulianto; Agus Wiyono

Jurnal Riset Rumpun Ilmu Teknik 2022 Pusat riset dan Inovasi Nasional

Rumah sakit Toeloengredjo terletak di Kecamatan Pare, Kediri dengan luas bangunan sebesar ±981,199 m2 yang memiliki ruang klinik pada lantai satu dan dua, dan ruang meeting room pada lantai 3. Gedung Rumah Sakit Toeloengredjo mengacu pada SNI 2847 : 2013, SNI 1727 : 2013, dan SNI 1726 : 2012. Dalam tugas akhir ini gedung Rumah Sakit Toeloengredjo di analisis dengan SNI 2847 : 2019, SNI 1727 : 2018, dan SNI 1726 : 2019. Struktur atas terdiri dari kolom, balok dan pelat, sedangkan sloof dan pile cap dengan pondasi tiang pancang adalah struktur bagian bawah. Dengan menggunakan software SAP 2000 untuk analisis struktur diperoleh hasil perhitungan yaitu struktur pelat tipe S1 ø10 – 150 mm, balok tipe B.1 5 D16 dan 4 D16, kolom tipe K.1A 12 D19.