SciRepID - Scientific Publication Search

Publication Search

35,802 articles from 393 journals · 1,447 citations tracked

Showing 1-2 of 2

Analytics

Eka Aprillia; Pahang Putra, I Nyoman Dita

Jurnal Teknik Sipil 2024 Faculty Of Engineering University 17 August 1945 Semarang

BIM technology in the construction world is growing. However, the application of BIM in Indonesia has not been carried out thoroughly. BIM technology can help quantity take off work that affects the success or failure of a project. BIM can reduce the error rate of quantity take off planning calculations compared to manual calculations. Tekla Structure is one of the software developments of BIM that can produce quantity take off building output along with 3D visualisation. This research conducts 3D modelling and discusses the comparison of quantity take off using BIM-based software Tekla Structures with a recap of the manual calculation contained in the initial Bill of Quantity for the X Building Project planning. This difference can be used as a consideration for the application of BIM in the initial calculation of project planning. The percentage difference obtained for the pile cap  resulted in concrete volume deviation of 0.69% and -19.1% for reinforcement volume. The spun piles work resulted in a concrete volume deviation of -0.8% and reinforcement volume of 8.45%. In the calculation of column work, the deviation value for concrete volume is 3.14%, while the volume of reinforcement is -12.2%. The results of the BIM quantity take-off are deemed more reliable due to the 3D visualization of BIM objects and the ability to adjust the detail of work elements.

Rizqi Rahayu; Priyo Suseno, Dhony

Jurnal Teknik Sipil 2023 Faculty Of Engineering University 17 August 1945 Semarang

Umumnya quantity take off di Indonesia menggunakan spreadsheet Microsoft Excel berdasarkan pada gambar dua dimensi dengan berpedoman pada SMM (Standard Method of Measurement). Dalam industri konstruksi saat ini penggunaan aplikasi komputer untuk profesi quantity surveyor sangat disarankan, yaitu dengan menggunakan Building Information Modeling (BIM). BIM merupakan suatu sistem atau teknologi yang mencakup beberapa informasi penting dalam proses Design, Construction, and Maintenance yang terintegrasi pada pemodelan tiga dimensi (3D). Glodon Cubicost adalah salah satu dari berbagai jenis BIM untuk pekerjaan Quantity Take Off (QTO). Pada penelitian ini, analisis perbandingan quantity take off pada proyek tender pembangunan pabrik “X” di Jawa Timur menggunakan Microsoft Excel dan Glodon Cubicost. Hasil perbandingan tersebut untuk pekerjaan struktur beton bagian struktur atas (kolom, balok, dan lantai) diperoleh selisih 0,58% untuk pekerjaan beton, 0,18% untuk pekerjaan bekisting, dan 1,15% untuk pekerjaan pembesian. Hasil selisih menunjukkan bahwa quantity take off menggunakan Microsoft Excel lebih besar dibandingkan menggunakan Glodon Cubicost. Quantity take off menggunakan Glodon Cubicost dapat mengurangi budget RAP (Rencana Anggaran Pelaksanaan) 0,511% dari RAB (Rencana Anggaran Biaya).