Amelia Oktavia; amaliyya, nita; Rindiani Indah P

Jurnal Nusantara Berbakti 2026 Universitas Kristen Indonesia Toraja

Sukabanjar Village is one of the villages striving to improve basic infrastructure quality, particularly in drainage construction and road repair. However, limited understanding among village officials and communities regarding standardized construction cost estimation methods, specifically the Unit Price Work Analysis (AHSP), has become an obstacle in preparing accurate and efficient Budget Plans (RAB). This community service program (PKM) aims to improve the understanding of village officials, village hall staff, and Sukabanjar Village community regarding AHSP-based construction cost estimation planning as the standard reference for construction work cost calculation in Indonesia. The program involved socialization and training for 20 participants, consisting of village officials (RW/RT), village hall staff, and general public, introducing the basic concepts of AHSP, RAB component elements, and simple simulations of drainage and road work cost calculations. Evaluation was conducted through pre- and post-tests. The results of the activity showed a very significant improvement in participants' understanding. The average pre-test score was 42, which then increased to 75 in the post-test, reflecting an increase of 33 points (78.6%). In conclusion, the AHSP-based cost estimation planning socialization was effective in improving the village community's understanding of construction infrastructure budget management, although continued mentoring is still needed for optimal and sustainable implementation.

Heru Fahrudin Faiz; Rika Ampuh Hadiguna

JURNAL WILAYAH, KOTA DAN LINGKUNGAN BERKELANJUTAN 2026 Fakultas Teknik Universitas Cenderawasih

Road improvement projects require consistency between technical planning documents and field implementation to ensure that service quality, structural performance, construction time, and user safety are achieved. This article evaluates the conformity between planning and realization in the Pangkalan-Batas Jambi road improvement project in Rawas Ulu District, North Musi Rawas Regency. The study used a descriptive-quantitative evaluative approach based on field monitoring, project technical documents, comparative quantity analysis between contract and Contract Change Order (CCO), and identification of implementation constraints. The results showed that several work items changed during construction because initial planning data did not fully capture actual field conditions. Quantities increased for drainage excavation (+18.87%), roadbed preparation (+8.99%), aggregate class A base course (+12.51%), and AC-Base (+11.98%). Conversely, reinforced pipe culverts decreased (-58.33%), unsealed aggregate base/sirtu decreased (-43.50%), and tack/prime coat volume slightly decreased (-0.47%). The time schedule showed a minor delay of -0.13% in the first week but recovered in the second week, indicating effective field coordination. Main constraints included traffic interference, limited worker visibility, and equipment visibility. The study recommends more detailed site surveys during planning, stronger traffic management, stricter occupational safety implementation, systematic progress control, and routine post-construction maintenance to maintain road service life.

Agustina, Resti

ISAINTEK: Jurnal Informasi, Sains dan Teknologi 2026 Politeknik Negeri FakFak

The area and distance between buildings at POLINELA Campus make the presence of adequate connector roads an important necessity to support the mobility of the academic community. This study aims to optimize the scheduling of flexible pavement construction for the POLINELA Connector Road using the Critical Path Method (CPM) based on Microsoft Project 2021. The research method used is descriptive quantitative by processing the Budget Plan (RAB) data into a project schedule consisting of 11 main activities. CPM analysis is used to determine the sequence of work, dependencies between activities, the critical path, and project completion time. The results show that the total project duration is 23 calendar days (May 11–June 6, 2026). CPM analysis identified 10 activities on the critical path with zero float, while embankment work is a non-critical activity with time flexibility. Applying a Start-to-Start (SS) relationship with a 3-day lag between excavation and embankment work allows parallel implementation, reducing the project duration by 4 days (14.8%) compared to the conventional Finish-to-Start (FS) scenario. These results indicate that implementing CPM through Microsoft Project 2021 can increase execution time efficiency, simplify schedule control, and support decision-making in road construction project management.

Widya Lestari; Hepriyandi Luwyk Djanas Usup; Yustinus Hendra Wiryanto; Novalisae Novalisae; I Putu Putrawianta

Jurnal Riset Rumpun Ilmu Teknik 2026 Pusat riset dan Inovasi Nasional

Coal hauling activities are an important part of mining operation because they affect production continuity, cycle time efficiency, and operational safety. This study aims to analyze the requirements of road support equipment on the coal hauling road from Sector 4 to the new Coal Processing Plant (CPP) at PT. Asmin Bara Bronang, Central Kalimantan. Based on road geometry, traffic density, California Bearing Ratio (CBR), and Unsurfaced Road Condition Index (URCI). The research method used was applied research with a quantitative approach. Primary data ware collected through field measurements consisting of road geometri observations, traffic density observations, Dynamic Cone Penetrometer (DCP) testing to obtain CBR values, and road surface condition assessment using the URCI method. Secondary data were obtained from the company records. The results showed that the hauling road has a total length of 9.1 km with an average width of 16 m, and grade values ranging from -7.68% to 10.52%, which are still below the maximum standard of 12%. Traffic density reached 184 dump trucks/day, for coal hauling and 62 units/day for construction material transportation, indicating high traffic intensity. CBR values ranged from 7% to 100%, showing variations in subgrade bearing capacity. The URCI value ranged from 72,50 to 91.00, indicating fair to good road conditions. Based on the analysis of road conditions and maintenance area requirements, the recommended support equipment for maintaining the hauling road consists of 1 motor grader unit, 1 compactor unit, 1 bulldozer unit, and 1 water truck unit.

Siti Nurhalizah Hutagalung; Shofia Amin; Feny Tialonawarmi

Ebisnis Manajemen 2026 Fakultas Ekonomi & Bisnis, Universitas Nusa Nipa

This study aims to examine the implementation of the Integrated Dynamic Archival Information Sistem (SRIKANDI) application in digital archive management at the Public Works and Public Housing Agency (PUPR) of Jambi Province. This study applies a qualitative approach using descriptive methods. Data collection techniques were carried out through observation, in-depth interviews, and documentation of informants directly involved in archive management and the use of the SRIKANDI application. The analysis of policy implementation in this study is based on Edward III's theory, which covers the dimensions of communication, resources, disposition, and bureaucratic structure. The findings of the study show that the implementation of the SRIKANDI application in the Road Construction Division has been carried out, but it has not been running optimally. The use of the application is still mostly focused on correspondence activities, while the comprehensive archive management function has not been optimally implemented. Factors supporting implementation include the existence of clear regulations, leadership commitment, and the availability of socialization and training activities. Meanwhile, the obstacles found include limitations in internet network quality, application stability, and differences in the level of human resource capabilities and adaptation to digital sistems. This study concludes that the successful implementation of SRIKANDI is not only influenced by the availability of technology, but also by the readiness of organizations and human resources in supporting the transformation of digital archive management. In addition, this study also provides several strategic recommendations to improve the effectiveness of implementation.

Nur Anggita Rahmadani; Riri Maria Fatriani; Suci Rahmadani

Desentralisasi : Jurnal Hukum, Kebijakan Publik, dan Pemerintahan 2026 Asosiasi Peneliti dan Pengajar Ilmu Hukum Indonesia

Slums are an urban issue that arises due to rapid population growth and the limited capacity of local governments to provide adequate housing and basic infrastructure. This leads to areas with low environmental quality, limited access, poor drainage, and high socio-economic vulnerability. A similar phenomenon occurs in Jambi City, which requires a sustainable handling strategy. This study aims to analyze the strategies implemented by the Department of Public Housing and Settlement Areas of Jambi City in addressing slums and assess their contribution to environmental quality. A descriptive qualitative approach was used to understand the policies, program implementation mechanisms, and institutional challenges. Data was collected through interviews with government officials, field observations, and analysis of planning documents. The results indicate that the strategy focuses on improving basic infrastructure, such as road construction, drainage rehabilitation, and the provision of settlement facilities. This program enhances environmental quality and accessibility but faces challenges such as budget limitations, suboptimal inter-agency coordination, and the socio-economic conditions of the community. Addressing slums requires a more comprehensive approach, including collaborative governance, increased community participation, and adaptive policies to ensure sustainable improvements.

Baneftar, Bobby S H; Thambas, Arthur H; Kumaat, Ellen J

Jurnal Riset Rumpun Ilmu Teknik 2026 Pusat riset dan Inovasi Nasional

An essential stage in road infrastructure development is land acquisition, which frequently causes project delays due to its complex legal, social, and economic challenges. This study aims to identify the factors that hinder the land acquisition process in the Manado Outer Ring Road (MORR) 3 Phase 4 Construction Project and to assess how these constraints affect the progress of construction activities. The research was conducted using a qualitative case study approach, with data collected through field observations, document reviews, and interviews. The findings indicate that delays in land acquisition are caused by discrepancies in legal status and land ownership, differing perceptions of compensation value, insufficient public socialization, and weak institutional coordination. These issues lead to disruptions in the construction schedule and potential increases in project costs. The study demonstrates that land acquisition necessitates a more cohesive strategy, facilitated by enhanced communication and community engagement, fortified land acquisition management frameworks, and precise verification of ownership data. The results indicate that there must be broader mitigation strategies to prevent similar challenges in future infrastructure projects.

Titirlolobi, Angelina I; Thambas, Arthur H; Kumaat, Ellen J

Jurnal Riset Rumpun Ilmu Teknik 2026 Pusat riset dan Inovasi Nasional

This study evaluates the implementation of spot-check testing for road preservation works in Manado City, specifically on the Kairagi–Mapanget segment, the Manado City–Wori boundary, and the Liwas Terminal Access Road, to identify existing problems and assess the effectiveness of engineering-based mitigation efforts. The objective is to examine construction quality compliance with technical specifications and identify operational challenges encountered on site. The methodology encompasses the measurement of asphalt layer thickness and density via a core drill, the examination of contract documents, the analysis of laboratory test results, and the execution of field observations. The findings show that most samples meet the required standards, although several locations require corrective action. Challenges arise from weather conditions, heavy traffic, equipment limitations, and the need for adaptation to updated technical regulations. Operational mitigation strategies, staff training, the use of core drill technology, and digital documentation were found to enhance accuracy and efficiency in evaluation. The research demonstrates the value of stakeholder collaboration and capacity building in supporting quality control for road preservation works. A multidimensional approach is effective in resolving technical and operational complexities in urban road projects.

Muhammad Ramandha Satrya; Wydyanto Wydyanto

Merkurius : Jurnal Riset Sistem Informasi dan Teknik Informatika 2026 Asosiasi Riset Teknik Elektro dan Informatika Indonesia

 Road infrastructure development is an important factor in supporting community mobility and equitable regional development. However, road construction data management in Palembang City still faces various problems, such as scattered data, lack of integration, and not yet presented in a map-based visual form. This study aims to implement a Geographic Information System (GIS) as a medium for location mapping and presenting road construction data information in Sematang Borang and Kalidoni Districts, Palembang City. The methods used include field observation, road construction data collection and verification, GPS coordinate point retrieval, spatial and non-spatial data processing, and the development of a GIS system based on interactive digital maps. The results of the study indicate that the system is able to present road construction information in a structured, accurate, and easily accessible manner. This GIS helps improve the efficiency of the monitoring process, data management, and preparation of road construction reports at the Palembang City Public Works and Housing Agency. Thus, the application of GIS can be a supporting solution in decision-making and encourage the digitalization of road infrastructure data management.

Dian Tangkeallo; Theresyam Kabanga; Ferdi Ferdi

Bumi: Jurnal Hasil Kegiatan Sosialisasi Pengabdian kepada Masyarakat 2026 Asosiasi Riset Teknik Elektro dan Informatika Indonesia

This community service activity aims to improve street cleanliness and encourage the use of home gardens to support a clean, healthy, and sustainable environment. The main problems faced by the community include low awareness of environmental cleanliness, the persistence of trash along the roads, and underutilized yards. The activity implemented a qualitative approach through field observations, community interviews, outreach, and direct mentoring. The community service activities included the Clean Friday program, the construction of neighborhood gates, the creation of flower pots from recycled materials, and the use of home gardens for vegetable cultivation. The results of the activities showed a significant improvement in street cleanliness, increased use of home gardens as productive spaces, and growing awareness and active participation of the community, particularly the younger generation, in environmental protection. Furthermore, this activity also strengthened the values of mutual cooperation and local wisdom, which align with the Tana Toraja Masero concept of clean, healthy, independent, and sustainable development. Thus, this community service activity contributes positively to creating a sustainable environment and improving the community's quality of life in a sustainable manner

Zanuar Ilham Mahendra; Ferida Yuamita

Jurnal Kendali Teknik dan Sains 2026 International Forum of Researchers and Lecturers

PT Adhi Karya (Persero) Tbk is a State-Owned Enterprise (BUMN) in Indonesia that operates in the construction industry. PT. Adhi Karya (Persero) Tbk. was awarded the contract for the Yogyakarta-Bawen toll road construction project, Package 1, Section 1. Construction safety is a very important aspect in the project. The toll road construction project involves work at heights, especially on erection grider work. Erection grider work is a high-risk job, so construction safety must be guaranteed. If construction safety is not guaranteed in the work environment, workers will be more careful in working to reduce risks so that work slows down. This can reduce work productivity. However, when safety is guaranteed, workers will feel safe to work so that it can increase work productivity. This study aims to determine the effect of construction safety (X) on work productivity (Y). The data collection method was carried out by distributing questionnaires to 30 respondents of erection grider workers. Data processing used the Structural Equation Modeling–Partial Least Squares (SEM PLS) method with SmartPLS 4.0 software. The results of data processing showed that construction safety had a significant influence on work productivity with a t-statistic value of 7.329 and a p-value of 0.000.  

Martalata, Andi; Thambas, Arthur Harris; Mananoma, Tiny

Jurnal Riset Rumpun Ilmu Teknik 2026 Pusat riset dan Inovasi Nasional

Road preservation is a type of maintenance that keeps roads in satisfactory working order by using preventive, corrective, rehabilitation, and reconstruction methods. This approach makes sure that the road stays usable for the entire time it is planned to be used. In practice, preservation projects often run into delays that can lead to important contract conditions. To avoid this, there needs to be a structured way to evaluate things through a Show Case Meeting (SCM). This study looks at how SCM was used in the 2024 Girian–Kema–Rumbia–Buyat Road Preservation Project to find out what caused the delays and how well the agreed-upon fixes worked. The method included looking at physical progress, differences between planned and actual performance, and how well the contractor did during SCM Stages I and II. The results indicate that the contractor failed to provide enough workers and move the right equipment, which led to the critical contract condition. SCM Stage I did not meet the required test-case target, but SCM Stage II did, showing that the contractor was able to meet the required performance targets and finish the work on time. These results show that SCM is an important way to control contracts and fix problems, which helps construction projects get done on time and well.

Lapadengan, Tania; Sangkertadi; Pandey, Sisca V

Jurnal Riset Rumpun Ilmu Teknik 2026 Pusat riset dan Inovasi Nasional

In engineering practice, various methods have been implemented to stabilize landslide-prone slopes, one of which is the use of bore piles. Bore piles are structures that hold back soil and make slopes more stable by reinforcing the ground inside them. However, the application of bore piles in landslide mitigation presents its own challenges, making it essential to identify and anticipate potential issues that may arise in field engineering practice. Bore piles are installed vertically, either parallel or staggered, at specific spacing and are often combined with capping beams and struts to resist soil movement and provide lateral restraint. This method is commonly applied to high-risk slopes or critical infrastructures such as roads, bridges, and buildings. Anticipation strategies in engineering practice consist of three stages: planning, implementation, and long-term maintenance, with this study focusing specifically on anticipation strategies during the implementation stage. Although bore piles serve as an effective solution to reduce landslide risk, their success depends heavily on proper planning, construction execution, and maintenance. Issues such as soil conditions, construction quality, and external factors must be addressed through a comprehensive engineering approach.

Ferly Oktavia; Dian Kharisma Dewi

Jurnal Riset Rumpun Ilmu Teknik 2026 Pusat riset dan Inovasi Nasional

Bintan Island has abundant bauxite soil resources; however, its utilization as road construction material remains limited. The scarcity of high-quality granular material in the region necessitates the use of available local resources, particularly for pavement subgrade layers. This article aims to analyze the classification and mechanical properties of native soils in Bintan Island through a systematic literature review. The reviewed literature includes laboratory test results of bauxite soil. The findings indicate that bauxite soil exhibits low plasticity, relatively high CBR values (±35%), and is classified as CL (USCS) and A-2-4 (AASHTO). These results suggest that bauxite soil is suitable for subgrade applications, although require stabilization with binding agents. The implication of this review highlights that the utilization of local materials could support sustainable infrastructure development in island regions by reducing dependency on imported materials.