Publication Search

71,387 articles from 644 journals · 2,111 citations tracked

Showing 821-840 of 893

Analytics

Nedra Neswita; Sahriyal Sahriyal; Sri Agustin; Arif Sudaryanto; Bobby Mauliantino +1 more

Pandawa : Pusat Publikasi Hasil Pengabdian Masyarakat 2023 Asosiasi Riset Ilmu Pendidikan Indonesia

The purpose of this community service activity is to train and guide the skills of students of West Rengat 1 Vocational School in an effort to increase competence in knowledge, skills and processing of measurement data using a waterpass measuring instrument in soil surveying subjects, because one of the competencies that must be possessed SMK students, especially those majoring in construction and housing engineering, are studying land surveying using a waterpass tool. The methods used in this training activity include presentation, demonstration, practice and evaluation. The results of the evaluation of this activity were obtained from the assignments given to each student. The instructor checks the calculated measurement results. From the initial observation to the final evaluation process, it was found that there was an increase in the knowledge and skills of the students. Initially the participants did not have the ability to do surveying using a waterpass, but after the training was given the participants were able to apply the program. The evaluation results showed that as many as 67% of the participants were able to carry out the measurement assignments that had been given.

Mutiara Oktaviani Putri; Ulviana Agustina; Hasna Lutfi Indriani; Ersha Wiriani Safitri; Siti Rodiah

Jurnal Pelayanan Hubungan Masyarakat 2023 International Forum of Researchers and Lecturers

Malakewi Mitra Abadi is a construction implementation company in the form of Commanditare Vennotschap. CV.Malakewi MItra Abadi has its address at Eka Tunggal Street, Pekanbaru City. For now the partner company or CV. Malakewi Mitra Abadi has problems, namely the lack of accurate financial information and financial records that are still basic. Therefore, the service team will create an information system that can produce appropriate, relevant, accountable and accurate information for internal and external interests. The first is providing assistance in the management of financial transactions carried out by Partners. Therefore, several approaches can be used to overcome this problem, such as counseling, socialization, methoring and implementation in assisting the preparation of financial reports.The results of this servive show that the knowledge and expertise on CV. Malakewi Mitra Abadi regarding the preparation of financial reports using the Miscrosoft Excel program or manually has increased. Financial reports that include accounting data are readily available to partners.

Koko Heru Satmoko; Achmad Djunaedi; Fitri Nugraheni

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2023 Fakultas Teknik Universitas Maritim AMNI Semarang

Tunneling construction is important to get more attention because considering the magnitude of the risks from this work such as the instability of the carrying capacity of the soil around the construction which can cause collapse during dredging or installation of tunneling walls, or and other problems such as lack of oxygen intake for workers who are carrying out tunneling excavations , the presence of toxic and flammable gases, or falling objects that can result in minor accidents or even death. The purpose of this study is to make a visual assessment through certain media (photos/videos) that can be done quickly regarding the existing conditions of the environment/work, whether the work carried out meets work safety standards, work safety regulations and so on. Rapid assessment can assume that what happened in the field at that time was a reflection of previous work. From the results of the study there were 58 variables which were divided into 4 main variables which were assessed based on the WBS and 26 photos of the environment of the Manikin Dam Tunneling development project taken from several sides. Calculations were made using the results of data from 6 informants, resulting in a P(H | Ecomb) value of 0.932 or a probability of 93.2%, which means that the tunnel work according to the 6 informants was carried out safely. The final value obtained from the analysis is almost close to 1 and all the results of the analysis from the 6 informants are more than 67%.

Occi Mardila Purwanti; Sujianto Sujianto

Jurnal Relasi Publik 2023 International Forum of Researchers and Lecturers

This research is motivated by the delay in fund disbursement, the lack of performance of the implementers and socialization to the community is still not optimal. This research aims to find out the implementation of livable house rehabilitation activities in Pekanbaru City. This research uses a descriptive qualitative method, with data collection techniques of observation, interviews and documentation. This research uses the theory of Charles O. Jones in Siti Erna (2009) with three indicators, namely: organization, interpretation and application. Based on the results of the research, it can be concluded that the implementation of livable house rehabilitation activities has not run optimally. This is because there are still misunderstandings between parties due to lack of coordination, the performance of the implementers is still not optimal, lack of socialization and delays in disbursement of funds, and development exceeds the target time. Suggestions from this study are to improve coordination and cooperation between parties and carry out their duties properly, need to hold socialization again, additional funds and construction can be completed on time.  

Ahmad Irwan Hanafi; Totok Yulianto; Titin Sundari

Jurnal Riset Rumpun Ilmu Teknik 2023 Pusat riset dan Inovasi Nasional

. In fulfilling occupancy eligibility, it is necessary to support facilities and infrastructure. The Bunda Asri housing complex, located in Bandarkedungmulyo, has a land area of ​​32 hectares with a planned construction of 3,000 residential units with 8 types of housing. Residential areas must have infrastructure with a minimum road width of 6 meters as stated in article 15 paragraph 3 of the 2019 Jombang Regency Regional Regulation concerning road infrastructure in residential areas. In this study, the planning used the pd T-2003 method which aims to determine the structure of the rigid pavement of the road at Bunda Asri housing. The results of this study are two types of roads, namely village roads and local roads. On rural roads, the thickness of the rigid pavement layer is 165 mm, the specification for the width of the plate is 2x3.5 m, the length of the plate is 4 m, and the tie rods use D13 threaded reinforcement (0.13 cm), 57.3 cm long, 0.75 cm spacing without using dowel spokes. Whereas for local roads, the thickness of the rigid pavement layer is 170 mm, the specifications for the width of the plate are 2x5 m, the length of the plate is 4 m, and the reinforcement thread D13 (0.13 cm) is used as tie rods, the length is 70 cm and the spacing is 0.75 cm using dowel spokes.

Bambang Laras Media; Abdul Latif N; Wahudin Diantoro; Abdul Khamid

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2023 Fakultas Teknik Universitas Maritim AMNI Semarang

Malahayu Reservoir is located in Malahayu Village, Banjarharjo District, Brebes Regency. Malahayu Reservoir was built in 1935. Malahayu Reservoir is planned to have a water storage capacity of 69 million m³ with a water surface area of 9.25 km². The main purpose of the construction of this reservoir is to supply irrigation water with a total area of 12,674 Ha, consisting of DI Kabuyutan of 4,166 Ha, DI Jengkelok of 6,173 Ha, and DI Babakan of 2,335 Ha. However, the water supply in Malahayu Reservoir continues to decrease, allegedly due to the high amount of sediment. The current problem is the occurrence of sediment in the Malahayu Reservoir. The pattern of operation using this reservoir needs to be studied because it is considered less optimal and because there needs to be a review of the use of reservoir water using newer data. That way, an operating pattern is needed to determine the reliability of reservoirs in their use as irrigation water providers. This study began by analyzing the secondary data obtained. Data is processed to obtain the amount of reservoir discharge and water needs for irrigation water. And the study ended with a simulation of the reservoir operation pattern. From the results of this study, it is expected to help provide solutions for the operation pattern of Malahayu Reservoir as an optimal reservoir. To improve the performance of the Malahayu Reservoir, supporting data such as reservoir operational systems and performance, hydrological data, reservoir operating procedures and patterns, and irrigation data are needed. The results of the analysis showed that the operation of the Malahayu Reservoir was less than optimal. Simulation of reservoir operation shows that the volume of water in Malahayu Reservoir is below the Minimum Operating Level (MOL), which is the minimum volume of water that should be in the reservoir. According to the records of the Cimanuk-Cisanggarung River Basin Center (BBWS), the condition of water supply in the Malahayu Reservoir continues to decline since this reservoir was built during the Dutch colonial rule until now.

Cesar Ivan Nugraha; Minto Basuki

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2023 Fakultas Teknik Universitas Maritim AMNI Semarang

The purpose of this study is to analyze the safety operational process in fiberglass shipbuilding, identify the types of risk causes that hinder the construction of fiberglass boats and propose recommended actions needed to overcome the risks in CV ERA FIBERBOAT by using theoretical research methods. Identification of risks in the process of building new ships, namely employees, materials, work equipment, payment of construction costs, working drawings have revisions. Determining the risk rating of the new ship building process: very high; inappropriate equipment, height; late payment / paying, medium; working drawings have revisions, low; materials arrive late, very low; employees procrastinate. Mitigating risks in the process of building new ships: employees delay work with mitigation, namely the director of the company provides the opportunity for employees to rest so that employees do not get sick, materials arriving late are mitigated by means of shipyard companies providing an easy-to-find address point so that the sender of materials does not having difficulty finding the address of the shipyard, working drawings have revisions that can be mitigated by means the company must always make an existence to the customer in every work process so that there is no miscommunication

Aulya Rachma Damayanti; Silvia Aluf; Nazwa Abidin Yunus; Muhammad Faiz Ferdi Rahman; Danendra Sakhi Rukmana +1 more

Journal of Creative Student Research 2023 Pusat Riset dan Inovasi Nasional

Waqf is one of the Muamalah activities that has spiritual, social and economic dimensions. Traditionally, waqf has so far only been interpreted as grants in the form of real estate such as land and buildings, whose purpose is limited to the construction of places of worship and educational institutions. Waqf is divided into several types based on purpose, time limit, and goods and their management. Management is the process of planning, organizing, directing and controlling an organization. Management occupies the most important place in the Waqf world because it can determine whether waqf assets are useful and developed depending on the management model.  The purpose of the research is to study waqf in management science, the principles of waqf management and the function of waqf management. This research uses qualitative methods where researchers must analyze theoretical sources from books and journals as well as materials and information from various other secondary data to answer the problems studied. The findings, and implications that arise are found in the professionalism of waqf management, asset management in waqf, financial statements, contributions and potential economic development of the community with waqf in the digital era.    

Erdin Fahlefi; Akhmad Suraji; Albani Musyafa

JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI 2023 CV. ALIM'SPUBLISHING

In construction procurement in Indonesia there are still deviations in the tender process. The deviation is caused by an opportunity during the construction bidding process.  The service providers are mutually looking for opportunities to seek personal or group benefits or from the working group that makes these deviations. This causes state losses due to deviations in the construction bidding process. This research was conducted by collecting data from institutions that have the authority to decide whether or not deviations occur in the auction process. The institution authorized to decide whether or not a deviation occurs is the Commission for the Supervision of Business Competition of the Republic of Indonesia (KPPU RI). This study uses a questionnaire to find out how much the causes and impacts on state losses are caused by deviations in the auction process and uses the Probability and Impact Matrix method to determine the level of implication values of the causes and impacts of deviations in each case using a case base analysis approach. The results obtained based on the decision are as many as 12 types of deviation based on the case decision. The impact of deviations that occur in construction procurement is material and immaterial losses. The causes of deviation in construction procurement are caused by four factors, namely the factor of wanting to obtain personal or group benefits, opportunities, pressure and business climate. The most contributing factor to the occurrence of deviation is the combined conspiracy and vertical conspiracy resulting in a value of 11.38%.

Puan Arliza Azmy; Tiara Arianti; Suci Wulandari; Nurliyani Malau; Hilda Aprilia Azizi

DIAGNOSA: Jurnal Ilmu Kesehatan dan Keperawatan 2023 International Forum of Researchers and Lecturers

Every hospital, industry and other sector experiences shifts in activity on a regular basis, and if the pace of construction and progress of the plant continues, this is absolutely necessary for the foreseeable future. Each individual's experience of fatigue is unique and subjective. Various conditions can result in fatigue accompanied by a decrease in body capacity and endurance while on duty. This study aimed to investigate the relationship between work fatigue and shift work in industrial plant employees. The research method used was a survey using questionnaires distributed to employees of industrial factories working in a shift system. The results showed a significant relationship between work fatigue and shift work in employees of industrial plants. High job fatigue can have a negative impact on employees' physical and mental health, as well as increase the risk of workplace errors and accidents. These findings point to the importance of effective shift management in reducing burnout and improving employee well-being. This research contributes to the understanding of the relationship between work burnout and shift work in employees of industrial plants. The practical implication of this study is the importance of greater attention to shift management in order to maintain employee well-being and productivity..

M.Gunawan Ridho Pribadi; Wire Bagye

Jurnal Sistem Informasi dan Ilmu Komputer 2023 International Forum of Researchers and Lecturers

The Public Works and Spatial Planning Office of Central Lombok Regency is one of the government agencies responsible for determining the addresses and coordinates of drilled wells in the area. Currently, data for the construction of drilled wells in Central Lombok Regency still uses a conventional system in which the data and information needed for the process of constructing drilled wells are recorded physically on paper documents. The drilled well data consists of coordinates, depth, location, work CV, and costs. If employees need drilled well data to compile reports, it takes a relatively long time. Therefore, to increase time efficiency, an information system website for the construction of boreholes was built at the Public Works and Spatial Planning Office of Central Lombok Regency using the Waterfall method.

Rani Hermita; John John; Wahyuni Latifah

SENIMAN: Jurnal Publikasi Desain Komunikasi Visual 2023 International Forum of Researchers and Lecturers

The growing development of shopping centers in the city of Medan creates business opportunities, starting from creating innovations in business opportunities. Currently, there are many kinds of markets emerging to accommodate business people, both new and old. So that many design problems have arisen in the display booth, the selection of appropriate materials and construction systems so as to answer the need for displays that have many functions (multifunctional), namely as accommodation for clothing display needs that are easy to disassemble (knockdown). In addition, to market their products, this market activity is an alternative to promote their brand, so that it can be known by the wider community. The method used in this design starts from the empathize and define stages starting from data collection, direct observation and interviews, both to tenants and pop-up market organizers. After the data collection stage is complete, the existing data is then analyzed. Then proceed to the ideate stage, through the process of brainstorming ideas, solving a problem, and determining the values ​​of the design. After the ideate stage, proceed to the prototype stage, where the process of visualizing ideas to get the desired results to the manufacturing stage is realized in the form of a prototype with a scale of 1:1. After the prototype is finished, a test is carried out to get feedback from users and refined through the implementation stage to perfect the product. The result of this design is that products that have been designed are oriented to be transformed into various models from the same material, with functions that can accommodate the needs of clothing displays that are still fulfilled in each module. The application of the modular concept is applied with a knockdown system, using a stalbuis pipe consisting of 3 sizes, namely, 40 cm, 21.2 cm, and 20 cm. To connect the stalbuis pipe using uno joker connections, nuts and bolts connections, and inner connections. As a flat cross section using canvas tarpaulin which consists of 2 sizes, namely, 13 cm x 51 cm and 4 cm x 51 cm.

Virna Yuniar; Didi Permadi; A. Zaini Bisri

Harmoni: Jurnal Ilmu Komunikasi dan Sosial 2023 International Forum of Researchers and Lecturers

Children who grow up in orphanages have the same rights as children who are in a family environment. Communication carried out by caregivers to provide motivation to foster children in terms of self-confidence. Based on this, orphanage caregivers need to carry out good communication patterns in increasing the confidence of foster children. The theory used in this study is the theory of social penetration popularized by Irwin Altman and Dalmas Taylor. This theory discusses the development of relationships through 4 stages, namely the orientation stage, the exploratory exchange stage, the affective exchange stage, and the stable exchange stage. This research uses a qualitative approach. Researchers use the constructivist paradigm, where knowledge is the result of human construction. Data collection techniques in this study through direct observation, in-depth interviews and documentation. The results showed that the pattern of communication of caregivers to foster children in increasing self-confidence in the Asyiyah orphanage was a wheel pattern, and a star pattern. The relationship between caregivers and foster children goes through 4 stages, namely the orientation stage, the exploratory exchange stage, the affective exchange stage, and the stable exchange stage. Factors that influence the increase in self-confidence in foster children are environmental factors and educational factors.

Aprilia Mawaddah; Maria Maya Lestari; Ledy Diana

Birokrasi: JURNAL ILMU HUKUM DAN TATA NEGARA 2023 Sekolah Tinggi Ilmu Administrasi (STIA) Yappi Makassar

Explanation of the Convention On Nuclear Safety 1994 Article 16 Number 1, 2 and 3 that States that have or will build Nuclear Power Plants (NPPs) in their territory must take appropriate measures related to facilities, security, emergency plans carried out in the event of an emergency in the vicinity of the NPP. Construction of Fukushima NPP The existing nuclear reactor at the nuclear plant was built with insufficient power to withstand the Earthquake and Tsunami that occurred in Japan on March 11, 2011 causing explosions and leaks in 4 nuclear reactors. Japan announced that tanks used to hold waste from leaking nuclear reactors could no longer hold it, so the waste had to be dumped into the sea. The main problem in this study is about the regulation of International Law violated by Japan based on its decision to dump nuclear waste into the Sea, and how the impact will be on the environment. The type of research used in this study is normative legal research or can also be called doctrinal legal research. Normative legal research is literature law research. The action that will be taken by Japan who want to dispose of nuclear waste that they have stored for years due to the Earthquake and Tsunami event has received a lot of resistance from various elements. Especially from the Japanese people themselves to protests from neighboring countries who are afraid that they will also be affected by the waste if it is thrown into the sea. It is hoped that Japan can take appropriate action before doing so because it will not only harm its country but also harm other countries that are disappointed with the actions that Japan will take.

Lisa Trisnawati; Erny Erny; Hazanawati Hazanawati; Nafriandi Nafriandi; Sri Guntur +1 more

Jurnal Pengabdian Masyarakat Sains dan Teknologi 2023 Fakultas Teknik Universitas Cenderawasih

The purpose of this community service activity is to train and guide the skills of West Rengat 1 Vocational School students in an effort to increase competence in the field of drawing with the AutoCAD program because one of the competencies that vocational students must have, especially those majoring in construction and housing engineering, is drawing using the AutoCAD application. The methods used in this training activity include presentation, demonstration, practice and evaluation. The results of the evaluation of this activity were obtained from the assignments given to each student. The instructor checks the images that have been made by all participants including the size and shape of the images. From the initial observation to the final evaluation process, it was found that there was an increase in the knowledge and skills of the students, who initially did not have the ability to draw using AutoCAD, but after the training was given the participants were able to apply the program. The evaluation results showed that as many as 64% of the participants were able to do the drawing assignments that had been given. Keywords: AutoCAD, Competency Improvement, SMK Students.  

Hindun Siva Afriani; Muhamad Rizal; Sari Usih Natari

Doktrin: Jurnal Dunia Ilmu Hukum dan Politik 2023 International Forum of Researchers and Lecturers

Contract work in construction is one of the common forms of work performed in the construction industry. In contract work, workers are hired to complete construction projects within a specified timeframe and agreed-upon cost. However, there are often cases where contract workers experience delays or wage payment postponements. The research aims to analyze the legal protection for contract workers in the construction industry concerning delayed wage payments. In Indonesia, there are labor regulations that govern the rights and obligations of workers, including wage payments. If there is a delay in wage payment, workers have the right to file a lawsuit or report the violation to the authorities. This research adopts a qualitative research method, analyzing data and gathering information from various sources. Legal protection plays a crucial role in safeguarding workers. Some relevant legal roles include employment agreements, which enable workers to enter into contractual agreements with employers that protect their rights.

Amany M A; Lintang Yudhantaka

Birokrasi: JURNAL ILMU HUKUM DAN TATA NEGARA 2023 Sekolah Tinggi Ilmu Administrasi (STIA) Yappi Makassar

The binding of the parties to the construction service business is contained in the construction work contract. The construction work contract contains an agreement between the employer and the executor, which generally discusses rights and obligations. The purpose of this study is to find out how the form and content of the cooperation agreement between CV. X and PT. Cipta Wisesa Bersama, as well as find out the efforts to resolve defaults that occurred between CV. X and PT. Cipta Wisesa Bersama. The results of this study can be concluded that the cause of default is CV. X did not pay the money for the completion of the work to PT. Cipta Wisesa Bersama.    

Wahyu Ramadhan Cahaya Firdaus; Aris Heri Andriawan

JURNAL TEKNIK MESIN, INDUSTRI, ELEKTRO DAN INFORMATIKA 2023 Pusat Riset dan Inovasi Nasional

PAL Indonesia is one of the construction companies in the maritime industry that focuses on producing above and below the surface ships which the Indonesian government highly relies on, therefore the safety system there is very strict, including safety lighting. With good lighting, objects can be seen clearly, so that the operation of production equipment and work in the workshop is optimal. However, the company PT. PAL Indonesia has a problem, namely in the warship production workshop, workers often complain because the lighting in the workshop is not bright enough, which causes workers to experience red, watery and sore eyes. Therefore, researchers are interested in analyzing whether the existing lighting standard is in accordance with SNI 03-6197-2000, namely 350lux. From the research that has been done, it is found that the PT PAL workshop with an area of 2700m2 has an average light intensity measurement of 82.22lux, so re-planning is needed to produce a light intensity that is in accordance with the standards. Based on the results of calculations according to standards, 42 light points are obtained with an average lighting of 354 lux which is simulated using the dialux application. The addition of these light points had an impact on increasing electricity bill rates, which were initially IDR 624,575.34 per month to IDR 2,186,013.69 per month.

Bagas Ramadhani; Wateno Oetomo

Jurnal Sipil Terapan 2023 Fakultas Teknik Universitas Cenderawasih

The purpose of this study is to determine labor productivity against costs and time of implementation of the Watudakon River DPT project development work. The results of this study are the large number of labor productivity in the construction work of the Watudakon River DPT project, Mojokerto. With the results of calculating the overall productivity level, namely with an average of 2,228 m³/day, assuming 25% of formwork material shunting work and 75% installation of formwork, the calculation data is in accordance with what is carried out in the field. Duration of implementation according to a survey conducted on DPT Sungai Watudakon construction work, Mojokerto with an average value of duration for installation of pile cap formwork 1.013 days/hour, and for installation of DPT wall formwork 1.00 days/hour, then for pile repair work DPT cap and wall 1.00 days/hour, and also for pile cap casting work 1.166 days/hour, for DPT wall casting work 1.312 days/hour. The conclusion in this study is that the productivity of the workforce working hours is in accordance with the realization in the field and that work results can be increased by adding working hours or overtime.

Shella Bunga Slamet Lantini; Arina Bunganingtyas

Jurnal Kajian dan Penalaran Ilmu Manajemen 2023 CV. Aksara Global Akademia

The PDAM service tariff covers the cost of water treatment, infrastructure management, and services to customers. In PDAM Magelang City, there are several public service tariffs, namely the service of drinking water needs to customers, new connection services, payment of drinking water accounts, water quality inspection services, and water tank services. In this case the author will discuss the public service tariff in the new connection service of PDAM Magelang City.For the research method in this case, the author analyzes the data from the research conducted using descriptive analysis method in which data from interviews and document studies are processed and analyzed to provide an overview of the factors that determine the new connection service tariff at PDAM Magelang City.The new connection service tariff of each PDAM is different, the PDAM Magelang City tariff is based on the customer class which has IV customer groups with different tariffs. The tariff for class I is lower and the tariff will be higher for each class II and so on. Classes are adjusted to the type of house, land area, building area, type of building, type of floor, and type of roof used. The factors for determining the tariff for new connection services at PDAM Magelang City are seen in terms of financial and non-financial factors. In terms of financial factors, it consists of registration fees, drawing planning fees, connection permit fees, transportation costs and construction costs of service and persil pipes. While in terms of non-financial factors in the form of inclusion of new prospective customers on the criteria of the group that has been determined.