Publication Search

70,857 articles from 624 journals · 1,760 citations tracked

Showing 41-60 of 145

Analytics

Dewi Rana; Virgiawan Virgiawan; Ananda Dwi Putri; Siska Amelia; Septiana Nadine +1 more

Jurnal Ekonomi dan Keuangan 2025 Asosiasi Riset Ekonomi dan Akuntansi Indonesia

A parabola is a curve that consists of points that are equidistant from a fixed point (focus) and a fixed line (directrix). This study aims to analyze the shape of the canopy roof of the UBB Medical Building using an analytical geometry approach on parabolas. The method used is a quantitative descriptive based on visual documentary online and proportional estimates against comparative objects. The parabola model is constructed from three key points and visualized using GeoGebra. The results show that the shape of the canopy can be accurately represented through the equation of a parabola, with a symmetrical and aesthetic structure. This research proves that mathematical concepts can be practically applied in architectural design.

M. Farid Mediatama; Aditya Hanum Widharsa

Misterius: Publikasi Ilmu Seni dan Desain Komunikasi Visual 2025 Asosiasi Seni Desain dan Komunikasi Visual Indonesia

The Archives and Library Office of West Sumatra Province is a government institution that serves as a center for archive management and public literacy services. This building is visited by various groups, including agency staff, students, university students, and the general public. However, based on preliminary observations, several issues were identified regarding the existing signage system in the building, which was found to be inadequate, lacking in informativeness, and in many cases, unfit for use—making it difficult for visitors to navigate the space. This study aims to design a more effective and communicative signage system using a visual communication design approach. Data collection methods included direct observation and SWOT analysis to identify the strengths, weaknesses, opportunities, and threats of the current signage conditions. The design process employed the Design Thinking method, consisting of five stages: empathize, define, ideate, prototype, and test. The outcome of this process includes five primary media: pictograms, floor plan boards, ground floor information boards, directional signs, and room information signs. Additionally, five supporting media were designed: staff ID cards, lanyards, library membership cards, folder maps, and bookmarks. The developed designs were evaluated through validation and feasibility testing involving two design experts and three visitors as respondents. Based on the assessment results, the design was rated as excellent, with an average score of 4.95 from the experts, and all general respondents gave positive feedback regarding the visual aspects, legibility, and informational function of the designed signage system.

Agustinus Sungsang Nana Patria; Amrita Winaya Shita Dewi; Pramesta Armanisag Pangestuti; Thomasonan Lutfie Prananto

Jurnal Suara Pengabdian 45 2025 LPPM Universitas 17 Agustus 1945 Semarang

Desa Kemuning merupakan salah satu Desa yang terletak di Kec. Ngargoyoso, Kab. Karanganyar Jawa Tengah. Desa Kemuning mempunyai potensi dalam bidang pariwisata yang dikenal luas oleh masyarakat. Dalam proses pengembangan desa, salah satu permasalahan yang ada pada Desa Kemuning adalah kurangnya perhatian masyarakat tentang pentingnya Keselamatan dan Kesehatan Kerja (K3) dalam proses konstruksi. Sehingga Dosen Program Studi Teknik Sipil Universitas 17 Agustus 1945 Semarang melaksanakan kegiatan pengabdian yang berlokasi di Desa Kemuning yang berupa penyuluhan terkait pentingnya Keselamatan dan Kesehatan Kerja (K3) dalam proses pembangunan dan pengembangan Desa Kemuning. Metode kegiatan yang digunakan untuk tercapainya tujuan Pengabdian kepada Masyarakat ini adalah survei untuk mengetahui kondisi masyarakat dan lingkungan, analisis mengenai penyuluhan yang terkait pengetahuan masyarakat mengenai Keselamatan dan Kesehatan Kerja (K3), penyusunan materi tentang Keselamatan dan Kesehatan Kerja (K3), serta melakukan sosialisasi kepada masyarakat Desa Kemuning. Berdasarkan hasil dari proses kegiatan pengabdian kepada masyarakat yang dilaksanakan di Desa Kemuning yang berupa penyuluhan mengenai pentingnya Keselamatan dan Kesehatan Kerja (K3) untuk pelaksanaan konstruksi, dapat memberikan tambahan pengetahuan dan peningkatan sikap kehati-hatian dalam bekerja dibidang konstruksi dan warga semakin tahu item-item yang wajib digunakan dalam memenuhi standar Keselamatan dan Kesehatan Kerja (K3).

Recta Yogi Widi Astutik; Tava Julia Putri; Muhammad Athoillah; Muhammad Shofaul Fahmi Priyono; Ariel Dimas Hidayatullah +2 more

Filosofi : Publikasi Ilmu Komunikasi, Desain, Seni Budaya 2025 Asosiasi Seni Desain dan Komunikasi Visual Indonesia

This research explores the role of the film Dilan 1990 in shaping the tourism imagination of Bandung through the interaction of its main characters and the representation of urban space within the narrative. Employing a descriptive qualitative approach with semiotic analysis and cultural representation theory, the research examines how visual and narrative elements in the film influence audience perceptions of Bandung as a cultural and nostalgic tourist destination. The findings reveal that Dilan 1990 successfully reconstructs collective memory of 1990s Bandung through cultural symbols, youth communication styles, and the depiction of urban spaces such as schools, streets, and city landmarks like Gedung Merdeka and Jalan Asia Afrika. The interpersonal communication between Dilan and Milea enhances the emotional depth and appeal of these urban settings, embedding them within a romantic narrative that resonates with viewers. This representation fosters an emotional connection between the audience and the locations portrayed, contributing to the emergence of film-induced tourism. The study concludes that film can serve as an effective medium for promoting cultural tourism, while also emphasizing the importance of interpersonal communication in enhancing tourism appeal through emotional and symbolic engagement.

Gazalba Imaduddin Sholeh

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2025 Asosiasi Riset Ilmu Teknik Indonesia

In the modern construction industry, accuracy and efficiency in volume calculations are crucial aspects of project success. This study compares two methods for calculating the volume of pile caps and reinforcement: the manual method and the Building Information Modeling (BIM)-based method. The manual method has long been used but has limitations in terms of time efficiency and a higher risk of errors. In contrast, the BIM method offers more accurate and efficient calculations through software-based digital modeling. This study employs a descriptive-comparative quantitative approach by analyzing volume calculation data using both methods. The results indicate that the BIM method has a higher level of accuracy, with a concrete volume of 1,822.87 m³ and reinforcement of 148,862.80 kg, compared to the manual method, which produced a concrete volume of 1,842.17 m³ and reinforcement of 150,279.05 kg. The comparison of pile cap volume calculations shows that the BIM method achieves 98.95% effectiveness in concrete volume calculations and 99.06% effectiveness in reinforcement calculations compared to the manual method. Additionally, the BIM method has proven to be more efficient in reducing calculation time and minimizing input errors. Thus, BIM is more recommended for large-scale projects that require high accuracy and efficiency in construction volume calculations. However, the manual method remains relevant as a validation tool and for small projects with technological limitations. This study highlights the importance of adopting digital technology in the construction industry to enhance productivity and project planning effectiveness.    

Muhammad Reky Alamsyah; Managam Rajagukguk; Danial Danial

Mars: Jurnal Teknik Mesin, Industri, Elektro Dan Ilmu Komputer 2025 Asosiasi Riset Teknik Elektro dan Informatika Indonesia

The Tanjungpura University Hospital building is located in the city of Pontianak, which is situated on the equator and often faces the potential of lightning strikes, thus requiring the installation of an external lightning surge protection system. This study aims to design an external lightning surge protection system capable of protecting the Tanjungpura University Hospital building using the rolling sphere method. In the rolling sphere method, calculations will be made for the lightning strike distance (R), protection radius (Rp), protection area (Ax), and determination of protection angle (α). The University Tanjungpura Hospital building is at protection level IV, with a current strength of I = 16 kA and a lightning strike distance to the ground of 60.63 meters. The results obtained for using finials with the same height, hp = 1 meter, require hundreds of finials, while using a combination of finials and towers requires 68 finials. In the case of tower finials with a height hp = 10 meters, additional conductor wires are added or the catenary method is used with 14 conductor wires connecting 28 tower finials with a height of 10 meters, due to the areas outside the protection zone between these 28 final towers, necessitating the addition of conductor wires to expand the protection area of the rolling sphere method to protect the areas of the Tanjungpura University Hospital building.

Fauziah Rahmawati; Iin Soraya; Cindya Yunita Pratiwi

Jurnal Penelitian Komunikasi dan Sosialisasi 2025 Asosiasi Peneliti dan Pengajar Ilmu Sosial Indonesia

Gandaria 8 Building is an office building that provides services for tenants with various business needs. One of the main focuses of Gandaria 8 Building management is to build good relationships with tenants and address their complaints through the Tenant Relations Division. This study aims to analyze the communication strategies implemented by the Tenant Relations Division in handling Tenant complaints at Gandaria 8 Building. The data collection methods used in this study include observation, interviews, and literature review, with a qualitative analysis approach. The Tenant Relations Division of Gandaria 8 Building implements communication strategies that involve the use of various communication media, such as telephone, email, and WhatsApp, along with a two-way communication approach that is friendly, open, and professional. The stages of handling Tenant complaints begin with complaint receipt, issue analysis, and resolution, ensuring prompt responses. The high level of empathy demonstrated by the Tenant Relations Division staff in responding to Tenant complaints is a critical factor in increasing Tenant satisfaction. However, challenges in documentation remain, necessitating improvements in the recording system to ensure complaints are well-documented and to facilitate monitoring of resolution status. By implementing effective communication strategies, the Tenant Relations Division of Gandaria 8 Building has successfully handled Tenant complaints, although there is still room for improvement, particularly in documentation management

Putu A.A. Aptiyasa; Cosmas P.Y. Pao Effi; Stefanus Rada

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2025 Asosiasi Riset Ilmu Teknik Indonesia

Implementation of the hospital building project, have a ways of estimation in accordance with the phases of the project. In the early stages of project planning, (owner) requires the estimated cost to construct the project budget. So it is necessary to develop cost estimation model that is easy to use, accurate and reliable. This research planning to develop a model estimation on stage initial project planning, easy with a fairly accurate result. Development method uses the principle of " Cost Significant Model" and the multiple linear regression. 6 data obtained using the method of work packages BoQ (Bill of Quantity) hospital building with details of data among 5 work packages that have been realized from fiscal year 2011 - 2014 were compared with 1 package of work to be performed

Aulia Khairi; Pristisal Wibowo; Rahmaniar Rahmaniar

Uranus: Jurnal Ilmiah Teknik Elektro, Sains dan Informatika 2025 Asosiasi Riset Teknik Elektro dan Informatika Indonesia

Energy audit is a technique used to obtain the efficiency of a building with a certain method. Continuous research implementation is expected to be able to identify electrical efficiency and the purpose of data analysis is to obtain electrical energy efficiency to calculate the Energy Consumption Intensity (IKE) value in the building. Energy audits can also be carried out at any time or according to a predetermined schedule. Regular monitoring of energy usage is a must to find out the amount of energy used in each part of the operation during a certain period of time. Thus, savings efforts can be made.

Senna Malik Ibrahim; Jundan Ahsana Muhammad; Kholis Widodo; Mochammad Luqman Ashari

Journal of Student Research 2025 Pusat Riset dan Inovasi Nasional

Fire is one of the serious threats to buildings, especially national vital objects such as Building B Administration Electric Company East Java. Evaluation of the fire protection system, which includes Portable Fire Extinguishers (APAR), hydrant systems, and Fire Alarm Systems (FAS), is important to ensure the readiness and suitability of the devices in dealing with potential fires. This study was conducted through direct observation and comparing the results with international safety standards such as NFPA 10, NFPA 14, and NFPA 72. The evaluation results showed that the level of suitability of APAR was 89%, the hydrant system 72.6%, and FAS 83.66%. Although most elements of the fire protection system have met the standards, improvements are needed, especially in hydrant accessibility, APAR maintenance, and the implementation of fire alarm simulations. This evaluation provides important input to improve operational security and safety at Building B Administration Electric Company East Java..

Nina Paramytha; Muhammad Hanif

Uranus: Jurnal Ilmiah Teknik Elektro, Sains dan Informatika 2025 Asosiasi Riset Teknik Elektro dan Informatika Indonesia

This project aims to design and develop a prototype system based on gesture sensors to monitor visitors and smoke sensors to detect the presence of smoke in designated smoking rooms. The system is designed to enhance comfort, safety, and operational efficiency in multipurpose buildings. Utilizing the Arduino Uno microcontroller, the device is equipped with various components, such as a gesture sensor to detect visitor movements entering and exiting the building, enabling visitor monitoring for resource allocation. Meanwhile, the smoke sensor is designed to identify and monitor smoke concentration in the smoking room to prevent the spread of smoke to other areas.The device also includes additional features, such as an automatic exhaust fan and an LCD display for process monitoring. Test results show that the developed prototype has a high accuracy rate in detecting visitor gestures and can reliably and quickly detect the presence of smoke. This system provides an innovative solution to support smarter, safer, and more eco-friendly management of multipurpose buildings. This research is expected to serve as a foundation for further advancements in the application of sensor technology in public facilities.

Revi Lasmita; Mela Ardeline

Jurnal Kendali Teknik dan Sains 2025 International Forum of Researchers and Lecturers

Along with the population and economic growth of West Sumatra, especially in Padang Panjang City, West Padang Panjang District, the need for public facilities is urgently needed, one of which is the Padang Panjang market. In a project, planning and controlling costs and time is part of overall project management, especially at the implementation stage of the case study reviewed by researchers, namely the Padang Panjang market building construction project. In this research regarding time and cost control, the earned value method is one method that can monitor project performance in terms of time and cost. Which aims to determine project performance in terms of time and costs each week and predict the time and costs to complete the remaining work. So that we can get corrective actions to be taken next to progress the project. In this research, to obtain a basic basis for writing, secondary data collection is used as supporting data for the analysis of the results themselves. The analysis and discussion carried out were calculating the BCWS value, BCWP value and ACWP value in order to obtain the time variance value (SV), cost variance value (CV), calculating the productivity index, calculating project performance and calculating the estimated analysis of total project costs and completion time. The results of the research carried out are, the overall BCWS value of the Padang Panjang market project is IDR 96,213,315,046.3, for the BCWP value at the end of the 22nd week of review IDR 12,688,575,967, the ACWP value at the end of the 22nd week of review is IDR. 12,389,476,444.2 . As for the analysis results obtained from several existing indicators, the SPI value was 1.384 > 1, while the CPI was 1.003 > 1, which means that the project was accelerated in terms of schedule but incurred actual costs that were smaller than the work that had been carried out. The ETC value is IDR 84,134,151,328.9 and the EAC value is IDR 96,523,627,773.1, while the ECD value is 373 days for the project completion time.

Sulton Habib Mubarok; Muhammad Abdus Salam Jawwad

Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan 2025 Asosiasi Riset Ilmu Teknik Indonesia

Currently, the need for office buildings in the city of Surabaya is increasing along with the development of the economy in the city of Surabaya. PT X plans to contribute to meeting these needs, namely by building an office building in the city of Surabaya. This research was designed to calculate and determine the estimated magnitude of the impact of noise levels resulting from PT X's operational activities. Based on the calculation of the estimated magnitude of the impact, it is known that the noise level at the activity location without any activity is 52.4 dB(A) with a medium environmental quality value category (scale 3) and with operational activities producing a noise level of 67.64 dB(A). with the environmental quality value category being very bad (scale 1), so that the difference in environmental quality value between the noise level with activities and the noise level without activities is 2 (Medium Negative). Meanwhile, the noise level in settlements around the activity location without any activity is 47.8 dB(A) with a medium environmental quality value category (scale 4) and with operational activities producing a noise level of 54.66 dB(A) with the category The environmental quality value is medium (scale 3), so the difference in environmental quality value between the noise level with activities and the noise level without activities is 1 (Small Negative).

Erdiansyah Putra, B; Indra Gunawan; Muh. Jamaludin; M Ikraman

Jurnal Teknik Sipil 2024 Faculty Of Engineering University 17 August 1945 Semarang

. Perancangan dan pemodelan struktur merupakan unsur yang esensial pada suatu bangunan agar dapat menghasilkan struktur yang kuat, stabil, dan awet. Pada dasarnya struktur adalah benda kontinum yang memiliki derajat kebebasan tak terhingga sehingga harus dinyatakan sebagai model derajat kebebasan banyak. Tujuan Penelitian ini dilakukan untuk menganalisis kinerja struktur Gedung 2 Universitas Muhammadiyah Bima. Metode yang digunakan yaitu dengan melakukan pendekatan secara analisis menggunakan pemodelan struktur yang meliputi pemilihan jenis struktur yang digunakan, penentuan material dan dimensi elemen struktur, sistem pembebanan pada struktur (beban mati, beban hidup, beban gempa dan lain-lain), analisis struktur, pengecekan kekuatan struktur. Hasil Analisis tegangan azial yang terjadi pada kolom sebesar -1475,761 kN, Gaya geser yang dihasilkan oleh balok dan kolom masing-masing sebesar 72,430 kN dan 62,080 kN. Momen lentur yang dihasilkan oleh balok dan kolom masing-masing sebesar 63.0184 kN-m dan 120,1879 kN-m. Momen torsi yang dihasilkan oleh balok sebesar 9,5972 kN-m. Lendutan yang terjadi pada balok dan sebesar 2,085599 mm lebih kecil dari L/360 batas yang diijinkan. Dari hasil perhitungan analisis struktur bahwa dimensi balok, kolom dan pelat layak digunakan untuk struktur konstruksi gedung. 

Made, I Made Arda Winata; Putu, Putu Gede Suranata; Eryani, I Gusti Agung Putu Eryani

Jurnal Teknik Sipil 2024 Faculty Of Engineering University 17 August 1945 Semarang

Pengendalian biaya dalam proyek konstruksi sangat penting untuk memastikan keberlangsungan proyek. Dalam proyek konstruksi, memilih bahan dan metode yang sesuai dapat membantu dalam efisiensi biaya selama pelaksanaannya. Pemilihan material dan metode alternatif tidak otomatis mengurangi fungsi atau kualitas proyek. Oleh karena itu, analisis biaya proyek diperlukan untuk mengawasi aspek – aspek tersebut. Metode yang digunakan untuk mengoptimalkan biaya dalam suatu proyek konstruksi adalah dengan menerapkan value engineering. value engineering merupakan upaya yang sistematis dan terorganisir untuk mencapai fungsi yang diinginkan dengan biaya paling ekonomis tanpa mengorbankan kualitas atau kinerja. Dengan menerapkan value engineering pada 3 item pekerjaan arsitektur pada proyek pembangunan SDN 2 Panjer dengan mengubah desain eksisting dengan alternatif desain  baru, mendapat penghematan biaya pada pekerjaan penutup atap sebesar Rp 21.862.305,86 atau 11,16% dari biaya pekerjaan desain eksisting, pekerjaan plafon sebesar Rp 1.228.792,01 atau 1,42% dari biaya pekerjaan desain eksisting, pekerjaan lantai dan dinding keramik sebesar Rp 9.835.732,08  atau 7,65% dari biaya pekerjaan desain eksisting, penghematan tersebut berdasarkan pada analisis Life Cycle Cost. Pengendalian biaya dalam proyek konstruksi sangat penting untuk memastikan keberlangsungan proyek. Dalam proyek konstruksi, memilih bahan dan metode yang sesuai dapat membantu dalam efisiensi biaya selama pelaksanaannya. Pemilihan material dan metode alternatif tidak otomatis mengurangi fungsi atau kualitas proyek. Oleh karena itu, analisis biaya proyek diperlukan untuk mengawasi aspek – aspek tersebut. Metode yang digunakan untuk mengoptimalkan biaya dalam suatu proyek konstruksi adalah dengan menerapkan value engineering. value engineering merupakan upaya yang sistematis dan terorganisir untuk mencapai fungsi yang diinginkan dengan biaya paling ekonomis tanpa mengorbankan kualitas atau kinerja. Dengan menerapkan value engineering pada 3 item pekerjaan arsitektur pada proyek pembangunan SDN 2 Panjer dengan mengubah desain eksisting dengan alternatif desain  baru, mendapat penghematan biaya pada pekerjaan penutup atap sebesar Rp 21.862.305,86 atau 11,16% dari biaya pekerjaan desain eksisting, pekerjaan plafon sebesar Rp 1.228.792,01 atau 1,42% dari biaya pekerjaan desain eksisting, pekerjaan lantai dan dinding keramik sebesar Rp 9.835.732,08  atau 7,65% dari biaya pekerjaan desain eksisting, penghematan tersebut berdasarkan pada analisis Life Cycle Cost.

Miftachudin Chakiki

Venus: Jurnal Publikasi Rumpun Ilmu Teknik 2024 Asosiasi Riset Ilmu Teknik Indonesia

The building to be utilized should undergo regular inspections and performance testing to determine whether it can function and operate according to its intended use. Compliance with administrative and technical regulations governing the utilization of buildings is demonstrated through the issuance of a Building Worthiness Certificate (SLF). This study aims to assess the compatibility of the building's function with the conditions during the planning phase and evaluate the structural feasibility of the building. It also seeks to implement the provisions of Government Regulation No. 16 of 2021 regarding the Implementation of Law No. 28 of 2002 on Buildings. Based on the research conducted, it can be concluded that the structural suitability of the MSC Indosat Baturaden building has changed compared to the planned building. Initially designed as a battery storage building, it is currently used as an MSC building or a facility for storing batteries and servers. Additionally, there are discrepancies in the area specified in the original Building Permit (IMB) compared to the current building. Further analysis of the building's structure and the application of current regulations regarding structural serviceability, including dynamic load analysis (earthquake), inter-story drift analysis, P-Delta analysis, and structural cross-section checks, concluded that the building is safe as it meets the requirements specified in SNI 1726:2019 and SNI 2847:2019. The highest structural cross-section capacity ratio was 0.2 < 1, and the inter-story drift value was 0.023 < 0.07. The existing concrete material meets the structural standards, with a characteristic compressive strength of 28.98 MPa. The results of the rebar scan detector test showed that the type of reinforcement used complies with the standards specified during the planning phase, referring to SNI 07–0408–1989. Overall, the structural analysis results for the MSC Indosat Baturaden building indicate that the building is safe and remains fit for use.    

Afnan Ashiddiq Virgatara Setyawan; Titin Sundari; Totok Yulianto; Meriana Wahyu Nugroho

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2024 Asosiasi Riset Ilmu Teknik Indonesia

Time Schedule is used as a guide and control tool for work execution time and productivity of workers, work tools on the project. In terms of productivity control, there are several aspects involved in the monitoring system, such as materials, tools, resources, and scheduling of project activities. Scheduling is the arrangement of resources to complete tasks in achieving targets. by involving components of activities, and time, In order to determine the optimal scheduling and budget. in accordance with time and cost limitations, this study uses the PDM (Precedence Diagram Method) method and the Crashing method through alternative scheduling with the addition of overtime of 1 hour, 2 hours, and 3 hours and knowing the acceleration cost. for each alternative. The results of the acceleration alternative with optimal costs are, alternative 1 adding 1 hour of overtime, the total cost decreased by 0.19% to Rp 3,067,337,201, -. This means that alternative 1 saves costs of Rp 5,984,598, - and is estimated to be one day faster to 119 days.

Solina Solina; Daffa Hibban Bahrisy; Rahmat Prayogi; Bambang Riadi

Indonesia is a country that has rich and diverse culture that has existed since ancient times. Every ethnic group in Indonesia certainly has its own cultural characteristics. Wealth like this is what makes Indonesia famous for its customs, culture, language and literature. With this culture, we as the younger generation should preserve and maintain the authenticity of Indonesian culture. One of them is tikew crafts. Tikew is a form of local culture of the Gedung Ratu community which is made using woven techniques. Tikew is a form of local culture whose existence should be preserved and maintained. This research aims to determine the cultural value of tikew crafts as a form of local wisdom. Efforts to preserve, maintain and develop local culture at Gedung Ratu village officials formed a community of tikew craftsmen as a form of cultural preservation. This research method uses qualitative research methods with interview techniques with one of the Tiyuh Gedung Ratu staff. This research focuses on tikew crafts by examining the cultural values ​​contained therein. As a form of preserving local wisdom in Indonesia.

Anila Ismi; Elviera Wilda Yanti; Alfan Mubarak; Sultan Sultan; M. Afdal S

Jurnal Ekonomi dan Pembangunan Indonesia 2024 Asosiasi Riset Ekonomi dan Akuntansi Indonesia

Universitas Bangka Belitung (UBB) is committed to improving the quality of facilities and infrastructure to support various academic and non-academic activities. This article discusses the feasibility of constructing a Multipurpose Building (GSG) designed to be a multifunctional activity center. This study uses a financial analysis method with parameters of Net Present Value (NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), and Payback Period (PP). The results of the analysis show that this project is feasible to be implemented with an NPV value of Rp1,059,940,033 (10% interest rate) and an IRR of 13.66%. The construction of this building is expected to have a positive impact on the academic community and the surrounding community.

Atika Masruroh; Hanifatun Nabilah; Miftahul Khairi

Abstrak : Jurnal Kajian Ilmu seni, Media dan Desain 2024 Asosiasi Seni Desain dan Komunikasi Visual Indonesia

This study aims to determine whether the implemented system complies with recommended standards and to find opportunities for improvement in terms of energy efficiency and overall system performance. Therefore, it is expected that the results of this analysis will help design a more sustainable and efficient library building management. This study uses a descriptive quantitative research study method, namely research that emphasizes the collection of existing building data and analyzes the data in accordance with SNI guidelines on the AC Utility system. Quantitative is a form of research activity whose specifications are planned systematically and clearly structured from the beginning to the making of the research design. This research shows that: (1) The Use of AC Types in Buildings, (2) Air Conditioning in Buildings, (3) Mapping of AC Utilities in Buildings, (4) Data Analysis based on SNI Guidelines for AC Utilities. The results of this study show that almost all rooms in the General Library Building have AC requirements that exceed the standard. This will certainly cause swelling of electricity costs. Therefore, it is expected that the General Library Building will reduce the capacity of air conditioners in rooms that exceed the standard capacity and install air conditioners in rooms that have not been installed, so that the distribution of air conditioners will be more evenly distributed and all can feel the comfort.