Publication Search

72,574 articles from 669 journals · 2,111 citations tracked

Showing 21-33 of 33

Analytics

khoirur_rozikin; khoirur_rozikin; Nuris Dwi Setiawan; Unang Achlison

Jurnal Elektronika dan Komputer 2023 STEKOM PRESS

A calendar is a system for naming a period of time and is known as a Calendar Date. The Gregorian calendar is used throughout the world including Indonesia, this calendar is calculated from the birth of Jesus from Nazareth, the calculation uses the pattern of the sun's movement. The Gregorian calendar has 12 months in a year and 7 days in a week. The Hijri calendar is a calendar system based on the circulation of the moon around the earth, called Hijiriah because of its first year when the migration of the Prophet Muhammad from Mecca to Medina took place in 662 AD. Due to the different intervals or repetitions between the day and the weton where the day will return to the same day after 7 days while the weton will return to the same weton after 5 days, it is quite difficult to find out the day and weton on a certain date that is hundreds or thousands of days apart from the current date. The Gregorian calendar program with weton is used to find out the day and weton of a date by specifying the month and year, a 1 month calendar will be displayed along with the day and weton

Rizqi Aji Saputra; Muhamad Yunus; Toto Mulyono

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2023 Fakultas Teknik Universitas Maritim AMNI Semarang

As the center of academic activities of Muhadi Setiabudi University with 101 lecturers, 1266 students and 94 employees must be supported by adequate parking infrastructure. Parking is an important infrastructure in an activity. One of the problems in parking is the lack of adequate parking space. For this reason, it is necessary to evaluate the characteristics of parking in the campus area. The evaluation results found parking characteristics at the location in the form of: motorcycle parking volume of 347 vehicles and cars of 28 vehicles. The maximum parking duration for motorbikes is 195,089 minutes and cars is 185,591 minutes. The maximum accumulated value of motorcycle parking is 267 vehicles and cars are 18 vehicles. The maximum static capacity on the motorcycle is 922 vehicles while for cars it is 41 vehicles. The maximum parking index on motorcycles is 89% as well as on cars is 130%. The maximum turnover on motorcycles is 1.16 times and for cars 2.16 times. The maximum parking space requirement on motorcycles is 294 vehicles, on cars is 20 vehicles. From the calculation results, it can be concluded that the capacity of the existing parking lot for motorbikes is adequate, but for cars it is not adequate.

Bagas Ramadhani; Wateno Oetomo

Jurnal Sipil Terapan 2023 Fakultas Teknik Universitas Cenderawasih

The purpose of this study is to determine labor productivity against costs and time of implementation of the Watudakon River DPT project development work. The results of this study are the large number of labor productivity in the construction work of the Watudakon River DPT project, Mojokerto. With the results of calculating the overall productivity level, namely with an average of 2,228 m³/day, assuming 25% of formwork material shunting work and 75% installation of formwork, the calculation data is in accordance with what is carried out in the field. Duration of implementation according to a survey conducted on DPT Sungai Watudakon construction work, Mojokerto with an average value of duration for installation of pile cap formwork 1.013 days/hour, and for installation of DPT wall formwork 1.00 days/hour, then for pile repair work DPT cap and wall 1.00 days/hour, and also for pile cap casting work 1.166 days/hour, for DPT wall casting work 1.312 days/hour. The conclusion in this study is that the productivity of the workforce working hours is in accordance with the realization in the field and that work results can be increased by adding working hours or overtime.

Nur Rahmi; Prof.Amir Imbaruddin,MDA,Ph.D.; Dr.Najmi Kamariah,SE,M.Si.

Jurnal Manajemen dan Ekonomi Kreatif 2023 Universitas Kristen Indonesia Toraja

One of the main activities of hospital nutrition services is the provision of meals for patients in the hospital. The goal is to provide quality food in accordance with the nutritional needs, cost, safety and acceptance of the patient to achieve optimal nutritional status The food management information system currently used in the Nutrition Installation of Rsud Prof. DR H M Anwar Makkatutu Bantaeng is still using a manual (conventional) system, starting from calculating the need for foodstuffs to ordering foodstuffs. This is due to the unavailability of applications that can more efficiently save energy and time. So far, calculating food needs requires a long time and energy is needed by more than one person. The type of research method used in this research is a quantitative quasi-experimental research method which aims to show a causal relationship and to investigate the relationship and clarify the causes of events, where in this study it focuses on the use of energy and the duration of time used before and after using the application. computers for food management activities in the Nutrition Installation, in this case the calculation of food needs. Based on the results of the research, before and after using a computer-based management information system application to improve the efficiency of food administration at the Rsud nutrition installation, Prof. DR. HM Anwar Makkatutu Bantaeng (SPMIG), there was a difference in time duration, where the time used in calculating the need for foodstuffs was shorter or shorter. Food administration at the Nutrition Installation of Prof. DR H Makkatutu Bantaeng Hospital before using the SPMIG application software an average of 180 minutes - 210 minutes and after using the SPMIG application software the average was 1 - 10 minutes, so the time difference used was 170 minutes.

Widya Amelia Krisnanda; Endang Pudji Widjajati

Jurnal Kendali Teknik dan Sains 2023 International Forum of Researchers and Lecturers

Machine maintenance must be carried out as a support for the reliability of a machine so that the production system can run smoothly to meet production needs. The fundamental problem of this study is in PT XYZ with the Roll Table 5Q machine, which frequently experiences sudden damage caused by critical components. The goal of the study was to determine the maintenance time interval of the 5Q Roll Table machine, the optimal age of the machine, and the number of mechanics based on the minimum total maintenance cost in an effort to improve the reliability of the machine using the Reliability Centered Maintenance (RCM) II methods and Life Cycle Cost (LCC) methods. From the results of research for critical components As Roll Table obtained interval value of 331 hours / 13 days once a year with the selection of action is Scheduled restoration task and for Bearing components obtained interval value of 109 hours/5 days once a year with the selection of action is Scheduled on-condition task. From the calculation of the total life cycle cost of Rp. 3,720,459,386 with the optimal number of mechanics on the Roll Table machine as many as 3 mechanics with an efficiency level of 9.63% with an optimal age for the Roll Table machine 5Q is 12 years.

Ridhwan Dwi W; I Nyoman Lokajaya

Jurnal Kendali Teknik dan Sains 2023 International Forum of Researchers and Lecturers

Miwon Indonesia is one of the companies that started as a company in 1973, the company finally changed the company's name with PT. Daesang Ingredients Indonesia The research method used is Preventive Maintenance, in this study researchers analyzed the time between laminating machine damage to the Chamber Box Heater component, the data taken was the Laminating machine down time data in July – December 2022 The results of analysis and data processing showed that the level of component reliability, namely for the chamber box heater component of 0.5892 occurred on day 5. And while the press roll rewinder component obtained a reliability level of 0.5925 on day 7. And the results of the calculation of costs before preventive maintenance are obtained at a cost of Rp. 47,953,572 per 6 months and costs after preventive maintenance are obtained at Rp. 29,677,876 per 6 months. With a difference of Rp.18,285,696. From the results of preventive maintenance costs, it can reduce maintenance costs at PT. Daesang Ingredients Indonesia than before preventive maintenance calculations are carried out.

Sugeng Purwosuwoyo; Aini Kusniawati

Master Manajemen 2023 Fakultas Ekonomi & Bisnis, Universitas Nusa Nipa

This study was conducted because several problems were identified where supervision carried out by the leadership was still not optimal. This is evidenced by the existence of violations committed by both those being supervised and those supervising. In addition, slightly loose supervision does not rule out the possibility of violations of the main duties and functions of inspectorate employees. Employee work motivation still fluctuates in the sense that it is not optimal. This can be seen from the attendance records and completion of work targets that are not in accordance with the time that has been determined. The performance of the Pangandaran Regency Inspectorate seems to be slowing down, many jobs are not completed on time and the targets that have been determined. Of course, it cannot be denied that with few personnel, and the implementation of supervision that must be carried out throughout the district, it certainly has an effect on all jobs that must be completed. The aim is to determine the effect of leadership supervision and work motivation on the performance of inspectorate employees in Pangandaran Regency. The method used in this study is qualitative descriptive research. Based on the results of the research and discussion, the following conclusions were obtained. Supervision of the leadership of the Pangandaran Regency Inspectorate tends to be very high, as well as employee performance which tends to be high. This provides a fairly strong relationship between leadership supervision and employee performance. The calculation results show that leadership supervision has a positive and significant effect on employee performance. The work motivation of Pangandaran Regency Inspectorate employees tends to be very high, as well as employee performance which tends to be high. This provides a fairly strong relationship between employee work motivation and employee performance. The calculation results show that employee work motivation has a positive and significant effect on employee performance.

M. Gemilang; Nedra Neswita; Sri Agustin

Jurnal Sipil Terapan 2023 Fakultas Teknik Universitas Cenderawasih

Building as an educational service requires maintenance so that the condition of the building remains fit for function. Without building maintenance activities, the function of a building will experience degradation over time. In this study, researchers focused on research on the Main Building of the Indragiri High School of Technology which was more than 10 years old to analyze the level of damage to the building and estimate the cost of maintaining the building. In the calculation that the level of damage is calculated based on the Regulation of the Minister of Public Works Number 24/PRT/M/2008 concerning Guidelines for the Maintenance and Care of Buildings, from the sum of all the components, 89.0% is categorized as Severely Damaged with the greatest damage in structural damage. The estimated maintenance cost for the main building of the Indragiri High School of Technology is Rp. 467,929,000.00 including Four Hundred Sixty Seven Nine Hundred Twenty Nine Thousand Rupiah    

Amanda Istianah Mutiawati; Eka Saputra

Jurnal Relasi Publik 2023 International Forum of Researchers and Lecturers

Problems related to labor or labor are problems that often occur in developing countries, one of which is Indonesia. Termination of Employment (PHK) is something that is feared by workers due to economic conditions which have an impact on companies that have to go out of business and this results in unilateral layoffs by the company. One of the implementing regulations for the Job Creation Law that has been issued is Government Regulation Number 35 of 2021 concerning Work Agreements for Specific Periods, Outsourcing, Working Time, Work Relations and Rest Periods, and Termination of Employment (PHK). Article 15 states that employers are required to provide compensation money to workers or laborers whose employment relationship is based on a Specific Time Work Agreement (PKWT). Compensation money as referred to in Article 15 paragraph (1) PP Number 35 of 2021, is given to workers/laborers who have had continuous service for at least 1 (one) month. Compensation is everything that is received by workers, both physical and non-physical. The form of compensation given can be in the form of money or goods that are given directly or indirectly. Regulations regarding compensation are regulated in Law Number 13 of 2003 concerning Manpower and Government Regulation Number 35 of 2021 concerning Work Agreements for Specific Periods, Outsourcing, Working Time and Break Time and Termination of Employment. The compensation given by Hotel X to Mrs. S is in accordance with Article 16 of Government Regulation Number 35 of 2021 concerning Work Agreements for Specific Time, Outsourcing, Working Time and Break Time and Termination of Employment. Where Mrs. S demanded compensation from Hotel X with the calculation of the remaining salary withheld due to covid reasons, overtime pay, and leave money.

Novia Dwi Susanti; Endang Pudji Widjajati

JURNAL TEKNIK MESIN, INDUSTRI, ELEKTRO DAN INFORMATIKA 2023 Pusat Riset dan Inovasi Nasional

CV. Daya Patra Sentosa is a company that produces paving. Of the several types of products available, T6 paving, T8 paving, and hexagon paving are the types of products with the most demand. CV. Daya Patra Sentosa has problems in production scheduling, namely there are frequent delays in product delivery because they do not yet have an optimal production scheduling system and still use FCFS rules. The purpose of this study is to provide alternative production scheduling suggestions in order to obtain optimal production processing time and prevent delays in product delivery. These problems are solved by the method of Campbell Dudek Smith and Palmer. These two methods are compared to find out the production process time and get the optimal choice of production time. The calculation results show that the application of the method applied by the company, namely FCFS is 12342.9 minutes, the Campbell Dudek Smith method is 11953.9 minutes, and the Palmer method is 12023 minutes. It can be seen that the Campbell-Dudek-Smith method provides a shorter time of 389 minutes (3.15%) to the company's schedule.

Silalahi, Radika; Hutagalung, Jeniusman Ahmad; Simatupang, Sahat

Jurnal Riset Rumpun Ilmu Ekonomi 2023 Lembaga Pengembangan Kinerja Dosen

Liquidity issues are important in maintaining the smooth operation of the company as well as in short-term and emergency needs as well as the growth function (investment) to develop owned assets in accordance with the expectations desired by the company. Information about budgeted cash flows can produce relevant information, because from this cash flow it can be known the need for the company's operations from the source of the recipient. Given the large number of cash receipts and disbursements managed, a list is needed that contains all cash inflows and cash outflows presented in the form of a cash flow statement. The results of the discussion concluded that cash management plays a role in the liquidity of CV. PSP Group, this can be proven from the results of research by calculating liquidity with the Current Ratio, Cash Ratio, and Quick Ratio, where the calculation results for 1 year, namely from January to December 2021 the calculation results for the liquidity ratio are > 1 as much as 75%, where with the existence of good cash management will have a positive impact, which means the application of cash management at CV. PSP Group is better, on company liquidity and financial conditions with a liquidity ratio of < 1 of 25%, which means that future conditions need to be improved in cash management to make it even better because there are still conditions that cash management in 2021 is not liquid or in the sense that CV. From July to September, the PSP Group was unable to pay its current debts in a timely manner, which resulted in obstacles to the company's payment of employee salaries and other important company expenses.

Risky Lazuardi Irsyad; Siti Mundari

Jurnal Kendali Teknik dan Sains 2023 International Forum of Researchers and Lecturers

PT. Nadha Karya Utama Indonesia, a company engaged in the manufacturing service industry that produces mild steel, located on Jl. Cold Hamlet, RT 04 RW 07, Ngronggot, Kab. Nganjuk, East Java. The purpose of this study is to plan the Roll Forming machine maintenance schedule in order to minimize maintenance costs. The method used in this study is using the Preventive Maintenance method. The calculation results obtain the reliability value of each component on the Roll Forming machine, namely 0.5 for the reliability of the Roll component, 0.5 for the Gear Box component, 0.5 for the Main Engine component, 0.46 for Bearings, and 0.5 for reliability Roll Stand. Determination of maintenance time intervals is based on Peventive Maintenance on Roll components for 37 days, Gear Boxes for 108 days, Main Machinery for 108 days, Bearings for 53 days, and Roll Stands for 146 days. Based on the calculation results, the total cost of maintenance before carrying out preventive with reliability is known to be Rp. 19,340,000, after carrying out preventive calculations with reliability is Rp. 13,120,139.10, it can be seen that before and after carrying out preventive calculations there is a difference in costs of Rp. 6,219. 860.9. From these results it is known that preventive maintenance can reduce the costs incurred by PT. Nadha Karya Utama Indonesia from before the Preventive Maintenance calculations were carried out.

Ningrum; Lilian Mega Puri; Eva Ratnasari

Journal of Student Research 2023 Pusat Riset dan Inovasi Nasional

Promotion is a communication activity carried out by a person or company with the broader community, where the aim is to introduce something (goods/services/brands/companies) to the community and at the same time influence the wider community to buy and use the product. Purchasing decisions are a process where consumers choose and evaluate products or services, often consumers consider various things that suit their needs in the purchase decision process. Every company built by a business entity or individual is generally the same, namely, to seek as much profit as possible by increasing purchases at the company, it takes various kinds of marketing activities, one of which is to hold promotional activities for the products produced, with the existence of marketing activities. Sales promotion in each company will indirectly help increase purchases of products. This study aims to determine how much influence promotion has on purchasing decisions at the Qolsa Fashion Store. The type of research used is quantitative research. The population in this study were all consumers of the Qolsa store in the metro city. In this study, samples were taken from many as 50 respondents. Data was taken through a questionnaire method. Data processing is done with the help of Microsoft Excel. The test includes a validity test, reliability test, normality test, homogeneity test, simple linear regression test, F-test, and t-test. The results show that there is a significant positive effect of promotion on purchasing decisions. The results of this study indicate that: There is a promotion effect on purchasing decisions for clothing at the Qolsa store in 2022 with the regression equation Y = 44.324 + 0.3233 X can be seen from the results of the analysis of the calculation of the value of t-count and t-tab above, it means that it is known that t-count > t-tab can be seen in the table of t point on the 5% significant list, namely 2.65> 1.68 also the Fcount value of 4.28 is greater than Ftab = 4.04 which is 4.28> 4.04 means There is a Significant Effect of Promotion on Purchase Decisions Clothing at Qolsa Stores in Metro City in 2022.