Publication Search

67,356 articles from 564 journals · 1,699 citations tracked

Showing 21-40 of 59

Analytics

Erika Noviyanti; Rustam Nawawi; Khikmawanto Khikmawanto

Lembaga Pengembangan Kinerja Dosen 2025 Lembaga Pengembangan Kinerja Dosen

This study aims to analyze the role of village government services in the development of infrastructure in Mekarwangi Village, Cisauk District. This research uses a descriptive qualitative approach with data collection methods through interviews with ten local residents. The results of the study show that village government services have made a significant contribution to the village's physical development, particularly in improving the accessibility and quality of basic infrastructure. Before 2015, road access in the village still used simple asphalt and lacked adequate drainage systems. Since 2016, the village government has begun concrete paving of roads and construction of drainage channels. Then, in 2022, road development using paving blocks was carried out in small alleys to facilitate mobility for residents, especially those living near plantation areas. Eight out of ten respondents stated that the development was very helpful, as previously they faced difficulties due to slippery and unsafe dirt roads, especially during the rainy season. These findings indicate that appropriate and responsive village government services can drive development that directly impacts the improvement of rural community quality of life.  

Fernando Putra.A; Titin Sundari; Totok Yulianto; Meriana Wahyu Nugroho

Jurnal Sipil Terapan 2025 Fakultas Teknik Universitas Cenderawasih

This lesson is to construct a durable and efficient form rigid pavement by utilizing the structural analysis and material performance approach. Rigid pavement is the main choice in highway construction because of its ability to bear heavy loads and its relatively long service life. The research methodology involves structural analysis to determine the optimal thickness and type of material for rigid pavement. This structural analysis considers various factors, including the estimated traffic load, subgrade characteristics, and local environmental conditions. In addition, material performance evaluation is also carried out to select materials that are appropriate to environmental conditions and meet technical requirements. The results of this study are recommendations for rigid pavement planning that include the right thickness, optimal material type, and construction specifications that are in accordance with applicable technical standards. The results of Rigid Pavement Thickness Planning using the Bina Marga 2003 Method on the Sumbermiri - Gudo Jombang Road case study produced a concrete slab thickness of  20 cm with K-300 concrete quality. In addition, the reinforcement used has a diameter of Ø 12 mm with a distance between reinforcements of  8,5 cm.

Romauli Situmorang; Mira Susila Warni; Sri Muthia Hasan; Tamim Hasyimi; Rohani Rohani

WISSEN : Jurnal Ilmu Sosial dan Humaniora 2025 Asosiasi Peneliti Dan Pengajar Ilmu Sosial Indonesia

The development of road infrastructure undoubtedly has a detrimental impact on society. The Serdang Bedagai Regency government's infrastructure development is an example of how something that is deemed beneficial by some always has a detrimental impact on others. This research intends to examine the influence of the building and operation of the Medan-Tebing Tinggi Toll Road on the socio-economic conditions of the community in the Pasar Bengkel area, Bengkel Village, Perbaungan District, Serdang Bedagai Regency. This study employed a qualitative descriptive case study methodology and gathered information via literature review, in-depth interviews, and direct observation. This study, which was carried out on February 15, 2025, involved three resource people who worked in Pasar Bengkel stores. According to the research, the toll road's construction and operation have a significant impact on Pasar Bengkel businesses. Prior to the toll road, Pasar Bengkel's average monthly income ranged from Rp10 million to Rp50 million, which suggests that local traders were enjoying rather favorable economic conditions. Around 80% of traders, however, reported a more than 50% decrease in income when the toll road opened, with the majority only making IDR3 million to IDR10 million a month.

Bodian Davin Panggabean; Frans Simbol Tambing

Jurnal Pengabdian Masyarakat Sains dan Teknologi 2025 Fakultas Teknik Universitas Cenderawasih

The impact of the landslide is very worrying for the entire community and the congregation of Dock Seven because the land has experienced very large erosion and splits from the edge of the river to the wall of the church building which can result in the collapse of the building wall and church tower. For this reason, fast handling is needed to anticipate a greater impact by making gabions reinforced with ironwood as retaining pillars, accompanied by material compaction and re-casting. The purpose of this community service activity is to minimize losses and damage due to landslides, and to restore the function of the road access as a means of community activities every day. The construction of this landslide handling is made simple, namely by installing ironwood pillars along the landslide area starting from the boundary of the church building wall to the edge of the river flow, then placing gabions filled with gravel material from the bottom of the landslide hole to near the ground surface, then filled with coral material and re-cast as road access. For the river bank wall, it is done by casting and installing embankments until it passes the road surface so that the river water does not overflow onto the road when the rainfall is quite high. The gabion used is a type of thick wire measuring 2 m x 1 m x 1 m with a side wire diameter of 3.4 mm, a braided wire diameter of 2.7 mm, a hole/mesh size of 8 cm x 10 cm, a number of turns of 3 and a weight/sheet of 18 Kg. The ironwood used as a support is 5 cm x 5 cm in size. The embankment material uses coral rock, while the casting of the river bank embankment uses a 12 mm iron frame combined with 5 cm x 5 cm ironwood. The height of the embankment from the bottom of the river to the road surface is 3.80 meters where the height from the bottom to the river to the road surface is 3 meters and from the top of the road surface is 80 cm. With the implementation of this landslide handling construction, the entire community and the congregation of Dock Seven can use the road access again for daily needs.

Dwiyono Waluyo; Isnaini Lilis Elviyanti; Titi Maemunah; Ahmad Aftah Syukron

International Journal of Mechanical, Electrical and Civil Engineering 2025 Asosiasi Riset Ilmu Teknik Indonesia

Concrete is an important aspect of building construction, one of which is road construction. Concrete is used for road construction because it has the advantages of high compressive strength, easy maintenance, ease of formation, and easy to obtain components. Road construction using concrete is applied to the reconstruction of the Kebumen South Ring Road, where the Kebumen South Ring Road is a 9.07 km long national road. National roads are arterial and collector roads in the primary road network system that connect provincial capitals, national strategic roads, and toll roads. Therefore, construction on national roads requires strong and good materials on the Kebumen South Ring Road to optimize road use. In this study, the concrete is composed of Bima cement as Portland cement, coarse aggregate from Kebumen, fine aggregate from the Progo River, and water from drilled wells. The admixture was obtained from a Conmix HK 2. Subsequently, all ingredients were mixed using a mixer truck. The concrete mixture was molded into cylinders and blocks. In this study, the average results of the 5-day concrete compressive strength test were obtainedwhich is 373.42 kg/cm2 and 28-day-old concrete is 442.32 kg/cm2. The average result of the 5-day concrete flexural test is50.65 kg/cm2 and that of 28-day-old concrete was 60.73 kg/cm2. The results are in accordance with the general specifications of the Bina Marga, namely, 45 kg.

Arya Mu’min Wally; Tommy Trides; Agus Winarno; Harjuni Hasan; Revia Oktaviani

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2025 Asosiasi Riset Ilmu Teknik Indonesia

Mining roads are one of the most important facilities that greatly affect the smoothness of production and affect mining costs. Therefore, the construction of mining roads must be carried out carefully to meet technical and work safety standards. Road conditions, distance, road slope and road carrying capacity will greatly affect the production capacity of heavy equipment, especially the production capacity of transport equipment. The location of this research is at PT. Energi Cahaya Industritama, precisely in Palaran sub-district, Samarinda city, East Kalimantan province. After observations were made at the research location, it was found that the geometric conditions of the road did not comply with the standards based on the overburden transport equipment or the largest transport equipment, for example, the width of the road on bends and the slope of the road. After conducting the research, the results of the data from the geometry of the access road were obtained, namely, the actual condition of the geometry of the access road on the straight road width is divided into 6 segments with a width of 13.3 meters, 14.3 meters, 14.5 meters, 13.2 meters, 15 meters, 15.7 meters. Meanwhile, the width of the bend road is also divided into 2 segments with a width of 15.9 meters and 15.5 meters respectively. And on the slope of the road there are 2 segments with values ​​of 11.1% and 14.8% respectively. Based on the results of the simulation software, the productivity of the transport equipment was obtained at 92.42 BCM/hour, which shows that productivity has increased by 12.23 BCM/hour from the actual productivity value of 80.109 BCM/hour. It has an average cycle time of 10.33 minutes, which shows a reduction in time or 6.01 minutes faster than the actual average cycle time of 16.34 minutes.

Gergorius Kopong Pati; Susanti Kaka; Ibrani Bili; Mikael Lede Mesa; Petrus Andi Kaza +4 more

Mars: Jurnal Teknik Mesin, Industri, Elektro Dan Ilmu Komputer 2024 Asosiasi Riset Teknik Elektro dan Informatika Indonesia

Village development is an effort to improve the quality of life and life for the greatest welfare of village communities. Meanwhile, the aim of village development is stated in article 78 paragraph 1, namely improving the welfare of village communities and the quality of human life as well as overcoming poverty through fulfilling basic needs, developing village facilities and infrastructure, developing local economic potential, and using natural resources and the environment in a sustainable manner. As is the case with village development, Watu Wona Village is one with a majority of farmers, which is an example of a road access development plan that really needs assistance from the government in its construction to support the production and sale of agricultural products. Infrastructure is still lacking, damaged infrastructure roads make access to the village difficult. As a result, the flow of goods and services to villages to transport agricultural products is also lacking and hampered. Based on the existing problems, village development planning is needed using a decision support system (SPK) so that village selection in Watu Wona village is faster and more accurate. By using the SAW method comparison

Amanda Amanda; Octavia Octavia; Aqif Abi Aufa; Ilham Maulana; M.Afdal S

Jurnal Ekonomi dan Pembangunan Indonesia 2024 Asosiasi Riset Ekonomi dan Akuntansi Indonesia

The road paving and ditch construction project in Balun Ijuk Village, particularly from Sahpire Boarding House Lane to Jerambah Gantung Road, aims to enhance transportation infrastructure to support mobility for local residents and students of Bangka Belitung University. This study employs a quantitative method with a financial feasibility analysis approach. Findings indicate that the total project cost is IDR 988,153,778 with an implementation duration of 2 months and 3 weeks. The financial analysis yields a Net Present Value (NPV) of IDR 481,705,602.62 (15%) and IDR 326,419,561.97 (20%), an Internal Rate of Return (IRR) of 18%, a Benefit Cost Ratio (BCR) of 1.48, and a Payback Period (PP) of 2 years and 7 months. Based on these results, the project is deemed economically viable with significant positive impacts on the community, including improved accessibility, reduced flooding risks via effective ditches, and enhanced connectivity and local economic activities. Additionally, the project implementation is expected to create temporary job opportunities and support sustainable infrastructure development in the region.

Muhammad Luthfi Asyir Suhaeb

Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan 2024 Asosiasi Riset Ilmu Teknik Indonesia

Work safety is an important aspect in the construction industry, especially in girder erection work that involves high risks due to the installation of large beams and the use of heavy equipment. This study aims to assess the implementation of work safety on the Solo-Yogyakarta-YIA Toll Road construction project by referring to safety standards from the Ministry of Public Works and related regulations. The research data consisted of 28 project photos covering girder erection preparation work, girder erection, and girder bracing. The assessment was conducted by three certified construction OHS experts using a checklist of work safety standards. The results of the Bayes Theorem analysis showed that all girder erection preparation work (7 photos) and girder erection (15 photos) were performed safely with a value of P(H|Ecomb) = 1. On girder bracing work, five out of six photos were rated as safe, while one photo showed unsafe work. This finding indicates that although most of the work has met safety standards, there are still aspects that require improvement. This study recommends a thorough implementation of safety attributes, especially on aspects that have not met the standards, to minimize the risk of occupational accidents on girder erection work in construction projects. This step is important to ensure worker safety and support the creation of a safer work environment.

Dita Irtanti Febrianita; Totok Yulianto; Meriana Wahyu Nugroho; Titin Sundari

Jurnal Sipil Terapan 2024 Fakultas Teknik Universitas Cenderawasih

Profitability analysis is a key factor in evaluating the success of construction projects. This study focuses on the profitability of the Banjaragung - Pulosari road rehabilitation project in Jombang. The rehabilitation project spans 1,566 meters in length and 3 meters in width, with a project value of IDR 1,534,120,251. To determine the profit level, a profitability analysis is required. The main objective of this report is to provide an understanding of profitability analysis in the construction industry, particularly in the Banjaragung - Pulosari road rehabilitation project in Jombang, by presenting the Return on Investment (ROI), Internal Rate of Return (IRR), and Benefit-Cost Ratio (BCR) methods as tools for evaluating profitability. The analysis results show a favorable outcome with an ROI of 29% and an IRR of 10.42% per year, which is higher than the East Java Regional Development Bank’s Prime Lending Rate (SBDK) of 6% per year. A BCR of 1.0669 also indicates that the benefits exceed the costs, signifying that the project has high investment return potential and is viable to undertake.

Dhovan Damara Santoso; Relita Buaton; Mili Alfhi Syari

Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika 2024 Asosiasi Riset Ilmu Teknik Indonesia

Every company is required to plan the need for goods as effectively as possible in order to maximize profits. Bintang Makmur Building Shop is a building shop that provides building materials, especially cement. Cement is one of the basic materials for buildings. The need for cement has recently continued to increase due to the large number of developments, both housing projects and road construction. In addition to the increasing demand for cement, cement prices also experienced price volatility which tended to fluctuate. This is done so that there is no stockpiling or even a shortage of cement. With prices that tend to go up and down if there is too much stock, it will cause losses if there is a price decrease. Vice versa if there is a shortage of cement stock, it can cause disappointment to customers. To deal with the above, it is necessary to build a prediction system that can predict cement needs in prosperous shops. The system that will be built uses an Artificial Neural Network (Artificial Neural Network) which is part of the science of artificial intelligence which has been widely used to solve various kinds of problems related to prediction or forecasting by utilizing the Backpropagation Method. The system is designed with the MATLAB programming application. From the results of the research that has been carried out, it was found that the total demand for Andalas cement for January of the following year is 0.2532 or 2532, thus the predicted total demand for Andalas cement is 2532 sacks.

Shelly Rasyta Ananda; Anindya Putri; Nabila Mauldy Erwanto; Nessa Dila Arifqi; Citrawati Nur Feby Dinata +4 more

Jurnal Kemitraan Masyarakat 2024 Lembaga Pengembangan Kinerja Dosen

The Community Service Program (KKN) implemented by universities in district or city areas is expected to provide change, sustainable development and have benefits for the community. In Group 2 KKN in Ringinanom Village, Tempuran District, Magelang Regency, several quality work programs have been implemented, one of which is the adiwiyata program which can be used to form and increase awareness of the people of Bedilan Hamlet and students of MI Al-Islam Ringinanom about the importance of protecting the surrounding environment. hamlets and school environments. The Adiwiyata program is carried out using a Participatory Rural Appraisal (PRA) approach. This service was carried out to overcome problems in the environment around the hamlet and school which looked dirty and unkempt, so that the service carried out by Ringinanom Village KKN Group 2 has provided a solution to overcome existing problems through the adiwiyata program and activities that have been implemented. The Adiwiyata program that has been implemented has provided results such as making the environment of Bedilan Hamlet and MI Al-Islam Ringinanom cleaner and appearing free of plastic waste strewn on the side of the road, as well as gutters full of wild plants now looking clean so they will not cause water blockages when it rains. The construction of gates and road signs which initially did not exist in Bedilan Hamlet have now been neatly installed as a manifestation of the construction of facilities/infrastructure carried out by Group 2 of the Ringinanom Village KKN. Based on the activities that have been carried out at MI Al-Islam Ringinanom and with some knowledge about the importance of protecting and preserving the environment, students are now more active in carrying out cleanliness pickets so that the activities with Group 2 of the Ringinanom Village KKN make students accustomed to keeping the classroom and school environment clean

Ashar Bakri; Muh. Nashir. T; Adnan Adnan

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2024 Asosiasi Riset Ilmu Teknik Indonesia

The construction of the Parepare City Twin Bridges resulted in increasing vehicle volumes and the occurrence of traffic jams which resulted in obstruction of traffic flow or congestion. The aim of this research is to determine the existing conditions, performance of intersections and road sections and their handling. The type of research used is quantitative, with the data collection method carried out (survey) and the data analysis used is MKJI 1997. The results of this research show that the existing condition of the intersection and road sections in segment 1 is at level of service (LoS) B, segment 2 v/c ratio is at level of service (LoS) A, and segment 3 v/c ratio value is at level of service (LoS) A. The performance of intersections and roads in Segment 1, namely Jl. The peak hour for the Makassar-Parepare axis is 16.00-17.00 (afternoon) Monday, the traffic flow value (Qtot) is 1812.5 pcu/hour, the saturation degree (DS) value is 0.21. Segment 2 is Jl. Gen. M. Yusuf and Jl. Arung Mampi peak hours are 16.00-17.00 (afternoon) on Mondays. The traffic flow value (Qtot) is 262.7 pcu/hour, the degree of saturation (DS) value is 0.05. The handling is installing traffic signs; installation of warning lights or traffic lights.

Jhon Fernando Siagian; Tika Ermita Wulandari

Prosiding Seminar Nasional Ilmu Teknik 2024 Asosiasi Riset Ilmu Teknik Indonesia

Soil has a very important role in construction, namely in buildings, roads, bridges, dams and other buildings, so soil with adequate technical properties is needed. Work will encounter difficulties if you encounter soil that has large shrinkage characteristics, this causes damage to the building standing on it. To improve the properties of peat soil in the field of civil engineering, soil stabilization is carried out. Soil stabilization is in principle to improve the quality of soil that is not good, or improve the quality of soil that is actually already classified as good. The characteristics of peat soil include: high organic content, easy degradation when exposed to water, and if the soil experiences dryness the soil shrinks. The liquid limit of the original soil was 63.505% and when the lime mixture was added it became 61.46% in a mixture of 5% lime, 53.47% in a mixture of 10% lime, 49.30% in a mixture of 15% lime, and 28.55% in a mixture of lime 20%. The plastic limit of the original soil was 24.03% and when the Gypsum lime mixture was added it became 29.16% in a mixture of 5% lime, 31.11% in a mixture of 10% lime, 34.15% in a mixture of 15% lime, and 36.14% in a 20% lime mixture. As the Plastic Limit value increases and the Liquid Limit value decreases in the soil, the plasticity index of the soil decreases and the cohesive properties of the soil decrease.

Syamsul Syamsul

Prosiding Seminar Nasional Ilmu Ekonomi dan Akuntansi 2024 Asosiasi Riset Ekonomi dan Akuntansi Indonesia

This research aims to analyze the allocation of village capital expenditure in Poso Regency. This research uses secondary data obtained from village government general cash book reports from 2019-2022. The data obtained was then analyzed using descriptive analysis techniques. The results of the analysis show that the majority of village government capital expenditure in Poso Regency goes to the construction of roads, irrigation and buildings. On the other hand, a small number of village governments allocate village capital expenditure for land acquisition, vehicle purchases, bridge construction, network construction and other assets. This research is useful in providing information about the main priorities for allocating village capital expenditure.

Allya Salsa Bilatul Kh; Diajeng Anugrah Cantika Sari; Fatkurohman Nur Rangga

WISSEN : Jurnal Ilmu Sosial dan Humaniora 2024 Asosiasi Peneliti Dan Pengajar Ilmu Sosial Indonesia

Indonesia, as a developing country, faces challenges in improving people's welfare through development that is not yet optimal. Under the leadership of President Joko Widodo, the government is focusing on significant infrastructure development in an effort to encourage economic growth and modernization. Using Harrod Domar's modernization theory, this research examines how investment in infrastructure can encourage Indonesia's economic growth. The method used is literature study, with analysis of literature related to infrastructure development and modernization theory. The results show that toll road construction has a positive impact on transportation efficiency, community mobility, and economic growth, although it also faces several challenges such as environmental impacts and community involvement. The construction of toll roads, especially through collaboration between the government and the private sector, is an example of the application of Harrod Domar's theory in the context of Indonesian modernization, showing that effective investment in infrastructure can increase productivity and community welfare.

Demak Purba; Dian G Purba; Dina Revani Saragih; Endang Silalahi; Grace Naibaho +5 more

Intellektika : Jurnal Ilmiah Mahasiswa 2024 STIKes Ibnu Sina Ajibarang

This research aims to determine the extent of development of community activities after infrastructure development, especially in the construction of road infrastructure in the Sinasih Village area, Silau Kahean District, Simalungun Regency, as well as aspects related to community participation in village infrastructure development. The approach taken in this research is a qualitative approach that uses informant analysis units with data collection techniques through in-depth interviews and document studies. The analysis used is qualitative descriptive analysis. The research results show that: first, the village road infrastructure that has been built step by step has had a significant influence on improving the welfare of the community, especially the community in the Sinasih Village area. Second, aspects related to community activities, namely the type of work and level of education, also influence the rate of increase in community welfare itself.

Harun Harasid

Venus: Jurnal Publikasi Rumpun Ilmu Teknik 2024 Asosiasi Riset Ilmu Teknik Indonesia

Aggregate is the main component of road pavement structure, namely 90-95% of the weight of the pavement. Such a large proportion means that the quality of the aggregate used will greatly determine the overall performance of the pavement. The availability of quality aggregate is absolutely necessary to ensure the sustainability of development in the road construction sector. One area that has aggregate potential that has not been utilized optimally is Kandang Mbelang Village, Lawe Bulan. The aim of this research is to determine the characteristics of the Marshall, UCS, ITS test values ​​and the permeability of asphalt mixtures using the excavated material of Kandang Mbelang, Lawe Bulan as aggregate. This research uses experimental methods carried out in the laboratory with variations in asphalt content of 4.5%, 5%, 5.5% and 6% for the Marshall test and obtains Optimum Asphalt Content (KAO). For ITS, UCS and permeability testing, Optimum Asphalt Content was used with three samples each. Hypothesis testing for data comparison uses the T test method. The use of Kandang Mbelang aggregate in the AC-WC spec IV mixture produces a stability value of 711.5 kg, a flow value of 3.48 mm, a porosity value of 16.077%, a density value of 2.016 gr/ cm3 and Marshall Quotient value 215.823 kg/mm ​​at Optimum Asphalt Content of 5.3%. The average ITS value is 319.024 KPa, the average UCS value is 6,982.237 KPa, while the average permeability coefficient value is 7.14x10-4 cm/s. Through the T test statistical method, it is known that the use of the Kandang Mbelang aggregate for the AC-WC spec IV mixture does not cause changes in the stability, flow, ITS and UCS values. Real changes only occur for density values, porosity values ​​and permeability coefficients.

Alfina Jana Vian Duri; Devalesio Kumara Wardhana; Mohamad Rahan Ardiansyah; Yohanes Godman Ora Etlatius Woda Sidi; Dika Ayu Safitri

Venus: Jurnal Publikasi Rumpun Ilmu Teknik 2024 Asosiasi Riset Ilmu Teknik Indonesia

Every development activity carried out will definitely have an impact on the environment, both positive and negative impacts. The construction of the Lamongan northern ring road is also inseparable from the environmental impacts it causes. Therefore, it is very important to pay attention to how to carry out this development in a way that produces maximum benefits for society while causing minimal negative impacts on the environment. One way to reduce the negative impact of development on the environment is to carry out an Environmental Impact Analysis (AMDAL). AMDAL is a formal and mandatory instrument for every development activity that may have a major impact on the environment. By carrying out an AMDAL, we can analyze the potential environmental impacts that will be caused by a development project and plan ways to reduce these impacts.This research aims to find out the parts of the AMDAL study and AMDAL problems in the Lamongan North Ring Road Construction and provide solutions or ways to overcome these problems. The research results show that activities observed from the aspect of environmental suitability are referred to as environmentally sound. In this case, there is a need for a comprehensive assessment of the potential environmental impacts that may arise as a result of the construction of the Lamongan northern ring road.In carrying out AMDAL, we need to pay attention to various aspects such as the impact on flora and fauna, air and water pollution, land use, and so on. By planning appropriate and sustainable management, we can minimize negative impacts on the environment and maximize the benefits that can be obtained from this development.

Hermansyah Hermansyah; Hamka Hamka; Imam Fadly

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2024 Asosiasi Riset Ilmu Teknik Indonesia

Road construction using aggregates. In Pinrang, the material used to make samples was brick ash. The aim of this research is to determine the aggregate properties and aggregate compatibility of AC-WC dan AC-BC asphalt concrete mixtures based on general specifications from Marga Buildings in 2018. This study, which was carried out in the laboratory from August to October 2023, used an experimental approach. According to the research results, the AC-WC dan AC-BC stability value obtained from adding 5% brick ash content with 5% asphalt content was 1975.31 kilograms and 6% asphalt content was 2995.74 kilograms. The MQ value is 833.46 Kg/mm 5%, and 6% 1109.53 Kg/mm, while the stability value obtained by adding 6% brick ash content with 5% asphalt content is 1564.59 kilograms and 6% asphalt content is 2399 .03 kilograms. The MQ value is 665.78 Kg/mm for 5% and 6% 891.83. The AC-BC stability value obtained from 5% brick ash with 5% asphalt content is 2023 ki.29 kilograms and 6% The large asphalt content is 2018.77 kilograms, the resulting MQ value is 613.12 from 5% and 6% is 531.25. The stability value resulting from the addition of 6% brick ash with 5% asphalt content is 1118.02 kilograms and 6% is 1122 .54 and the resulting MQ values were 272.69 from 5%, 267.27 from 6%. From the results of this research, the addition of 6% brick ash can reduce the stability of AC-WC and AC-BC, in contrast to 5% brick ash increasing stability.