Publication Search

67,732 articles from 582 journals · 1,699 citations tracked

Showing 21-38 of 38

Analytics

Zabadi, Fairus; Yuwana, Wahyu

Jurnal Teknik Sipil 2024 Faculty Of Engineering University 17 August 1945 Semarang

The working capital of construction work contractors is very influential in expediting the implementation of construction work and being able to meet work time scheduling targets. To gain profits, contractors must be able to manage existing resources. This research aims to determine working capital needs, profits and effectiveness. This type of research uses descriptive qualitative. Research data sources were obtained from secondary data and primary data. Data collection was obtained from library observations, interviews, observations and document studies. The data analysis used is based on the MC (Montly Certificate), Termin (Termyn Payment) and Final (Turnkey Payment) payment systems with several policy options, namely Source of contractor capital, Down payment, and Bank loan. The results of the analysis obtained are, Working capital requirements based on MC with Contractor Capital Resources IDR 3,000,000,000 and profit IDR 2,245,689,086, Down Payment IDR 2,963,637,000 and profit IDR 2,245,689,086, Bank Loan IDR 5,400,000,000 and profit IDR 2,072,889,086. Working capital requirements based on Terms with Contractor Capital Source IDR 3,000,000,000 and profit IDR 2,245,689,086, Down Payment IDR 2,963,637,000 and profit IDR 2,245,689,086, Bank Loan IDR 2,800,000,000 and profit IDR 2,156,089,086 .  Working capital requirements based on End with Contractor Capital Source IDR 3,000,000,000 + Loan IDR 3,600,000,000 and profit IDR 2,130,489,086, Bank Loan IDR 6,550,000,000 and profit IDR 2,036,089,086.  The highest percentage of capital effectiveness and profits is the Termin payment system with the bank loan option, 77%.

Edy Soesanto; Ridwan Zaidaan; Shidqul Azaim Ahiraf

Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan 2024 Asosiasi Riset Ilmu Teknik Indonesia

Cost Recovery is a vital element in production sharing contracts (PSCs) within the oil and gas sector, allowing contractors to recover costs incurred during exploration and production through revenues generated from oil and gas production. This mechanism has a direct impact on the sustainability of operations and the management of natural resources, which in turn plays a critical role in supporting the national economy.This study aims to analyze the role and contribution of the cost recovery scheme in enhancing Indonesia's economic development, focusing on optimizing state revenue, increasing both foreign and domestic investment, and promoting the development of sustainable energy infrastructure. The method used in this study is a literature review, which includes data from journals and published articles.The main findings of the study show that the cost recovery scheme not only functions as an instrument to ensure the sustainability of upstream oil and gas operations but also has a significant impact on other economic aspects. In the context of national economic development, this scheme contributes to increasing state revenue through taxes and royalties, creating jobs, and supporting local economic development in oil and gas-producing regions. Moreover, cost recovery opens up opportunities for technology transfer and enhances human resource capacity in the energy sector.

Iswandi L; Rahmawati Rahmawati; Andi Bustan Didi; Adnan Adnan

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2024 Asosiasi Riset Ilmu Teknik Indonesia

This study aims to determine the influence of cost factors in determining the success of the modernisation and rehabilitation project in saddang sub unit langnga pinrang district, determine the influence of time factors in determining the success of the modernisation and rehabilitation project in saddang sub unit langnga pinrang district. determine the influence of quality factors in determining the success of the modernisation and rehabilitation project in saddang sub unit langnga pinrang district, determine the influence of health, safety and environmental factors in determining the success of the modernisation and rehabilitation project in saddang sub unit langnga pinrang district.  This research was conducted using quantitative analysis, namely through distributing questionnaires and interviews to the owner, the contractor and the consultant, Data analysis carried out on the questionnaire collected using skinative statistics, namely the percentage to determine the main factors of the success of a project using the Statistical Package for The Social Sciens program.

Ahmad Mahatir H

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2024 Asosiasi Riset Ilmu Teknik Indonesia

This study aims to identify the success factors of building projects. The method used was data collection through questionnaires filled out by 30 respondents, including project owners, survey consultants, contractors, supervisors, and foremen. The results of validity and reliability tests showed that the variables of cost (X1), time (X2), quality (X3), and safety (K3L) were valid as they had an r-value greater than the r-table value of 0.361. The data analysis results indicated that the dominant factors influencing the success of building projects in the hypothesis testing were the t-values: Cost (X1) at 3.514, Time (X2) at 3.64, Quality (X3) at 4.66, and Safety (K3L) at 3.342. It can be concluded that the variables of Cost and Safety (K3L) are more significant or dominant compared to Quality and Time.  

Muhammad Fahri Faqihhuddin

Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim 2024 Fakultas Teknik Universitas Maritim AMNI Semarang

In the construction industry, management costs and construction project time are important factors for achieving project success. Cost overruns and time delays can result in significant financial losses for project owners and contractors. Therefore, it is important to adopt an effective approach to construction management to optimize project costs and time. One method for overcoming problems in achieving construction project cost and time targets is the Time Cost Trade Off (TCTO) method. The TCTO method is an approach used in construction project management to achieve a balance between project costs and time. The analysis results show that the FO Krian Development Project, which has a normal duration of 522 days, can be accelerated to 500 days (scenario 1) and 498 days (scenario 2). Direct costs tend to increase due to additional working hours and additional workforce. The alternative used or which is more profitable in completing the project is to use scenario 2, namely additional labor due to a decrease in duration of 24 days from the normal project time and experiencing a decrease in total project costs of IDR 292,008,708.16.

Iqbal F. Ibrahim; Mutia Cherawaty Thalib; Zulfikar Sarson

Jurnal Kajian Ilmu Sosial, Politik dan Hukum 2024 Asosiasi Peneliti dan Pengajar Ilmu Hukum Indonesia

The problems that occurred at MAN 1 Gorontalo City are closely related to the construction work contract agreement whose object is dormitories as one of the programs of the Ministry of Religion of the Republic of Indonesia which is intended for every school with madrasa status throughout Indonesia. Based on the data, it turns out that work that is already 30% in progress can be canceled because unexpected things happen, such as high rainfall in Gorontalo in September 2021 which resulted in work not being able to continue for some time. Apart from that, it turned out that 80% of the workers used by the contractor were Javanese and because the conditions and atmosphere at that time were still during the pandemic, the workers from Java could not go back to Gorontalo because the island of Java was in lockdown status. This is the reason why the Head of Development of Man 1 Dormitory, Gorontalo City, canceled the work contract because of the contract being castrated, in this case there was a target that was not achieved due to the condition of the workers, weather, and so on.

Farida, Ery; Sholihah, Qomariyatus; Andarini, Sri; Natsir, M. Halim

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 2024 Asosiasi Riset Ilmu Teknik Indonesia

he construction sector is a dynamic industry that produces projects in terms of infrastructure and buildings. This sector faces challenges, particularly in worker safety and health (K3) in every project. Statistics show that the increase in fatalities and permanent disability cases due to accidents at construction sites in Indonesia is among the highest compared to other industrial sectors. This study examines the key factors and challenges in meeting occupational safety and health (K3) standards to achieve quality infrastructure. The method used in this study is a literature review conducted through databases such as PubMed, Science Direct, and Google Scholar. After selection, 42 articles were used as sources for analysis in this study. The results indicate that technical aspects, both Internal Risks and Project Risks, are the most influential causes of health and safety risks in a building construction project. Meanwhile, External Non-Technical Risks are the least influential causes of health and safety risks in a building construction project. Risk control can be carried out through good working methods, the use of tools according to warning signs, the appropriate use of personal protective equipment (PPE), and clear explanations of accident risks and risk control methods by the contractor.

Rio Sandra; Muhamad Hasan Sebyar

Jurnal Ilmu Hukum Sosial dan Humaniora 2024 Lembaga Pengembangan Kinerja Dosen

Disputes between contractor service user companies and contractor service providers as a result of the contractors who bind themselves in the cooperation agreement cannot carry out their responsibilities properly. contracting work, infrastructure maintenance that is not in accordance with standards, the use of unqualified materials, the indiscipline of contractor workers in complying with work safety and work schedules that are not on time, so that things do not happen during the cooperation contract period, standard, clear and detailed regulations are needed at the beginning of making a cooperation agreement with the contractor in setting work standards, material specifications, and deadlines for work implementation, so that contractor service providers can carry out their responsibilities professionally and on time. That way the contractor service user company is not worried when entering into a cooperation agreement with the contractor service provider. Because the main focus is standards, empirical juridical research also investigates the empirical aspects. This research is used as descriptive research to show the effect of choosing a cooperation contract model, Types and Sources of Data, research data includes research data includes initial data secondary data. Primary data is data collected directly from respondents or informants, including experts and parties who have the competence to be interviewed. In this study, several legal regulations, including government, presidential, and regional regulations, serve as the legal umbrella for cooperation agreements between companies and contractors. It turns out that the various laws still suffer from norm vagueness, norm conflicts, and norm vacuums. This results in various interpretations of practice, which in turn affects various types of regulations. One of the problems that often occurs is about who participates in the joint Contract between the company & contractor, as well as the process of resolving legal disputes. 

Wesly Tumbur ML Tobing; Lukman Santoso; Reni Veliyanti

Jurnal Riset dan Inovasi Manajemen 2024 International Forum of Researchers and Lecturers

The purpose of this research is to examine the role of business process agility in creating a significant relationship between digital marketing capabilities and marketing performance in construction companies in Java. The research method was carried out quantitatively by collecting data by distributing questionnaires through electronic forms and printed formats which were delivered directly to respondents where the respondent was a director working for a contractor company on the island of Java. The sampling technique was carried out purposively based on the criteria for a director who has worked for at least five years in a contractor company on the island of Java. Based on these criteria, there are 211 company directors who have met these criteria. Data were analyzed using statistical software AMOS 22. The results showed that digital marketing capabilities had a positive and significant effect on business process agility. Digital marketing capabilities have a positive and significant effect on marketing performance. Likewise, business process agility has a positive and significant effect on marketing performance

Leonardo Karel Hurulean; Ali Maskur

Jurnal Hukum dan Sosial Politik 2024 International Forum of Researchers and Lecturers

A complex construction project entails the legal liability of the contractor and the process of its completion. The project of building a 2 tonne/day small-scale solar ice factory is in disarray due to a lack of funding in the completion process. The decline in local tax revenues and the loss of potential jobs for local communities, slumped local economic growth and the well-being of communities. The crumbling small-scale solar ice plant also hampers the potential for infrastructure development in Southwest Maluku district. The purpose of this research is to investigate the legal responsibility of contractors in corrupt construction projects as well as to identify the legal settlement process against contractors In the case of the Mangkrak project in the Fisheries Department of Maluku District West South. Qualitative research using empirical jurisprudence methods to obtain data on legal settlement processes in cases of crashed projects. The results of the research show that contractors have a legal responsibility to complete the project in accordance with the agreed contract. The process of legal settlement by means of negotiation between the parties concerned, arbitration and legal claims. The importance of monitoring the implementation of the project in order to avoid future projectcrashes

Edy Soesanto; Diah Ayu Kusuma Ningrum; Mohamad Rizqi Putra Prasetyo

Jurnal Hukum, Politik dan Humaniora 2024 Lembaga Pengembangan Kinerja Dosen

As a solution to overcome the problems in the Cost Recovery Production Sharing Contract system, the Government of Indonesia through the Ministry of Energy and Mineral Resources has issued Regulation of the Minister of Energy and Mineral Resources of the Republic of Indonesia Number 08 Year 2017 on Gross Split Production Sharing Contract. This new regulation was issued due to the decline in the discovery of oil and gas reserves and the decline in non-tax state revenue (PNBP) from the upstream oil and gas sector. The Gross Split Production Sharing Contract scheme also aims to reduce bureaucracy in investment to attract investors to conduct exploration and exploitation in Indonesia. This study aims to analyze the legal aspects related to Gross Split regulations in improving the investment climate in the upstream oil and gas sector, as well as to evaluate the role of the Oil and Gas Special Task Force as an institution responsible for controlling and supervising the activities of the Cooperation Contractor in the Production Sharing Contract.

Eugenia Audrey Hiendrata

Jurnal Kewirausahaan Cerdas dan Digital 2024 Asosiasi Riset Ilmu Manajemen Kewirausahaan dan Bisnis Indonesia

This study investigates the application of the percentage of completion (PPP) method in revenue recognition in contractor services companies. The PPP method has become a common choice for contractors to accurately recognize revenue in construction projects. In this context, this research analyzes various aspects related to the use of the PPP method in recognizing income, including the advantages, disadvantages, and factors that influence its application. Data were obtained through interviews with project managers and analysis of related documents. The research results highlight the importance of a good understanding of the PPP method and appropriate adjustments to project characteristics and market conditions to increase accurate revenue recognition in the contractor services business.

Yuda Ardiansyah; Dira Ernawati

Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika 2024 Asosiasi Riset Ilmu Teknik Indonesia

As Time And Human Civilization Progress, The Construction Industry Is Also Developing Rapidly, Starting From Advances In Technology Used To Increasing Competitors, Both Foreign Competitors And Local Competitors. The Application Of Supply Chain In The Construction Industry Is Believed To Be One Of The Strategic Efforts To Increase The Competitiveness And Performance Of A Construction Company. In This Research, An Analysis Of The Application Of Supply Chain Management (SCM) Will Be Carried Out In The Wadung Asri Market Drainage Channel Normalization Project. This Research Aims To Find Out Whether Contractors Have Implemented The Supply Chain Management (SCM) Concept In Their Material Procurement Process. The Research Results Show That In The Project Material Procurement Process, The Contractor Has Not Implemented The Supply Chain Management (SCM) Concept Significantly. This Can Be Seen From Decisions In Selecting Suppliers Which Are Only Based On The History Of Cooperation Without Considering Other Factors. Apart From That, There Were Delays In The Arrival Of Materials Which Resulted In Project Work Being Delayed From The Initial Plan. Therefore, It Is Necessary To Improve The Goods Procurement System That Has Been Running So Far By Implementing The Supply Chain Management Concept.    

Firdamarsha Benadikta; Fitri Nugraheni

Journal of Student Research 2024 Pusat Riset dan Inovasi Nasional

The accident rate of building construction projects in Indonesia reached 9 cases out of a total of 48 cases (20%) from 2017 to 2022. Out of these, 43 cases were attributed to technical negligence, 4 cases were due to natural factors, and 1 case is currently under investigation. Given the issues related to construction accidents, this research aims to identify construction safety variables that are likely to occur and subsequently conduct a risk level analysis. The research methodology employed is a case study, followed by a risk analysis based on the Ministry of Public Works and Housing Regulation No. 10 of 2021 regarding the Guidelines for Construction Safety Management Systems. The research findings indicate that out of 34 construction safety risk variables, there were 2 hazards (5.88%) classified as high risk (B), 22 hazards (64.71%) classified as medium risk (S), and 10 hazards (29.41%) classified as low risk (K).

Sri Hartono; Nanang Cendriono; Ita Yogi Pratama

Jurnal Ekonomi dan Pembangunan Indonesia 2023 Asosiasi Riset Ekonomi dan Akuntansi Indonesia

PLN is a monopoly trading company that sells electrical energy sources and manages all aspects of electricity in Indonesia, especially the Ponorogo area. In Ponorogo there is a company under the auspices of the Indonesian Electrical and Mechanical Contractors Association (AKLI) with the company name PT. Heroine of Eternal Blessing. In carrying out its work PT. Srikandi Berkah Abadi did not run smoothly, but there were many obstacles that disrupted the work process, one of which was the data input process. In this research we used a descriptive qualitative method where we carried out observations and direct interviews while conducting KKL within a period of 1 month. Based on the results of research that has been carried out previously, conclusions can be drawn, including: We carry out data processing activities on the implementation of connection work in people's homes, process data input on network maintenance and changes, and input employee hard disk data. While we were carrying out the KKL for 1 month, the problems we experienced were the ones we mentioned above, when inputting data in Microsoft Excel, it often had errors, crashes, and exited so that the data we were working on was lost and not saved.

Reno Ba'i Kurniawan; Herudini Subariyanti

Journal of Management and Social Sciences (JIMAS) 2023 Sekolah Tinggi Ilmu Administrasi (STIA) Yappi Makassar

PT Jaya Kencana is a company engaged in the field of mechanical and electrical contractors. One of the divisions at PT Jaya Kencana is engaged in the elevator escalator service division. This division is a division that offers elevator and escalator maintenance services. Where in this division the level of customer satisfaction is needed for the progress of the company. The independent variables in this study are marketing relationships and technician performance. The dependent variable in this study is customer satisfaction. The research uses statistical quantitative methods by determining the minimum number of samples using the slovin formula. The sample in this study was 101 respondents. Marketing relationship has a t count > t table (3.932 > 1.9844) with a significant value of 0.00 <0.05, which means that marketing relationships have an effect on customer satisfaction. Technician performance has a t count > t table (5.530 > 1.9844) with a significant value of 0.00 <0.05, which means that technician performance has an effect on customer satisfaction. Marketing relationship and technician performance have a significant value of 000 <0.05 and F count > F table (160.776 > 3.94), which means that marketing relationship and technician performance have a significant simultaneous effect on customer satisfaction. The results of this study can be used as input for related companies and can be used as an evaluation to increase company customer satisfaction.

Sugiono Sugiono; Setya Winarno

Jurnal Riset Rumpun Ilmu Teknik 2023 Pusat riset dan Inovasi Nasional

The application of VE in the construction sector is a systematic process by a multidisciplinary team focused on value and function. The adoption of EV in construction projects offers the potential for significant savings on project budgets. Seeing the current economic conditions, in the construction of ongoing works that require a sizable capital allocation, it is necessary to reconsider whether the design used is appropriate or not optimal. Among the many statements regarding the success factors of VE implementation in Indonesian construction, the knowledge and experience of VE of the construction parties is a key success factor as stated by the consultant and provided by the contractor.

Heri Kusairi

Journal of Management and Social Sciences (JIMAS) 2022 Sekolah Tinggi Ilmu Administrasi (STIA) Yappi Makassar

The development of business circumtances that always changes, leads companies to have competitive advantages in efficiency and effectivity. PT. Djinawi is a self-focused contractor company in optimalizing its human resources assets by adapting the empowerment to be successful in market competition. Such adapting of empowerment is viewed from four psychological empowerment dimensions that had been introduced by Spreitzer. Those foour dimensions are meaning, competence, self-determination, and impact. If all of these four dimensions, e.g., meaning, competence, self-determination, and impact is felt by employees, then the empowerment process will go through in good condition. This research used a holistic single case study, by using the technique of data collection by interview, direct-observation, and internal data of company. For the needs of mapping, a pra-case study had been carried out. From this research, it revealed that the adapting of empowerment can go through well, which viewed from the four dimensions, e.g, meaning, competence, self-determination, and impact that has been felt by employees. In line with it, from the triangulation may be obtained that the respondents also expressed some obstacles in project staff level. It can be concluded that if all of four dimensios, e.g, meaning, competence, self-determination, and impact could be felt by employees, then empowerment can go through well as well as make a company success in face against a tight of market competition.