SciRepID - Scientific Publication Search

Publication Search

54,413 articles from 425 journals · 1,456 citations tracked

Showing 1-2 of 2

Analytics

Muh. Saifuddin; Rr. Hawik Ervina Indiworo; Ika Indriasari

Maeswara : Jurnal Riset Ilmu Manajemen dan Kewirausahaan 2023 Asosiasi Riset Ilmu Manajemen Kewirausahaan dan Bisnis Indonesia

The problem in this research is that employee performance decreases based on service production lead time and income targets that are not achieved from the specified targets. And the aim of this research is to analyze the influence of teamwork, empowerment and training on employee performance at PT. Nasmoco Kaligawe. The population of this research is all employees of PT. Nasmoco Kaligawe with a total of 110 employees. The sampling technique used is a saturated sampling technique, namely making the entire population into the sample. The type of data used is primary and secondary data using questionnaire and literature study data collection methods. The analytical methods used are validity testing, reliability testing, classical assumption testing, multiple linear regression testing and hypothesis testing. The results obtained in this research are: teamwork has a significant influence on employee performance in a positive direction, meaning that if teamwork gets better, employee performance will increase. Empowerment has a significant influence on employee performance in a positive direction, meaning that if empowerment is implemented appropriately, employee performance will increase. Training has a significant influence on employee performance in a positive direction, meaning that if the training provided is better and more interesting for employees, then employee performance will increase. The Adjusted R Square value is 0.797, which shows that the influence of the variables teamwork, empowerment and training on the performance of PT Nasmoco Kaligawe employees is 79.7%. Meanwhile, the remaining 20.3% is influenced by other variables that were not observed in this research.  

Daniel T. Todapa; Juemi Juemi

Maeswara : Jurnal Riset Ilmu Manajemen dan Kewirausahaan 2023 Asosiasi Riset Ilmu Manajemen Kewirausahaan dan Bisnis Indonesia

Management of Village Fund Utilization in Infrastructure Development carried out by the Village Government to support community development and empowerment. Qualitative research method with a descriptive approach by examining four aspects, namely planning, organizing, mobilizing and supervising. Data collection techniques include observation, interviews, documentation and triangulation. The determination of informants was carried out "Purposively", namely deliberately selecting 5 people to become informants. The data analysis stages are: Data Collection, Data Condensation, Data Presentation, Conclusion Drawing. The results of this research show that the Management of Utilizing Village Funds in Infrastructure Development in Puse Village, South Dampal District, Toli-Toli Regency begins with the planning process, namely the Village Development Planning Conference (musrenbang). then in the organizing stage at this stage the organizing in terms of division of work is carried out by the village head. Implementation Process where the implementation of activities and supervision processes is carried out by supervisors from the sub-district village and district supervisors.