Publication Search

80,206 articles from 776 journals · 2,111 citations tracked

Showing 1-3 of 3

Analytics

Muhammad Yusuf Prayitno; Syamsul Hadi; Bagus Prakoso; David Avelino Anugerah Krishna Pamungkas; Ahmad Zulfa Sibro Malisi

Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri 2025 Asosiasi Riset Ilmu Teknik Indonesia

The decline in the performance of the die casting machine in 1998 after a long period of producing copper terminals showed dimensional defects and instability in product quality, especially in nozzle clogging, reduced copper flow, crust buildup on the gooseneck, plunger movement obstruction, and hydraulic pressure leaks. The purpose of planning the replacement and repair of die-casting machine components is to obtain replacement and repair costs, replacement and repair schedules for the period 2026, and the ratio of maintenance costs to profits. The replacement and repair planning method includes collecting previous maintenance data, applying the inspection-replace-repair-overhaul (IRRO) method, evaluating component conditions, predicting component service life, predicting labor costs, predicting supporting equipment to be used in maintenance, predicting the time to replace spare parts or reinstall repaired components, estimating replacement and repair costs for the period 2026, and calculating the ratio of replacement and repair costs to profits. The planning results obtained replacement and repair costs for the 2026 period are 75.770.000,- IDR with an estimated die casting machine rental rate of  1,500,000 IDR/hour which has the potential to be rented for 1,200 hours/year, and the ratio of maintenance costs to profits is 10,02 % which implies that the die casting machine with a capacity of 40 units/hour is still suitable for use and has the prospect of generating profits for the next few years.

Rismansyah Rismansyah; Syamsul Hadi; Muhammad Fauzan Hidayatu Ar Rijal; Venus Linggar Pribumi; Wildhan Hidayatullah

Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan 2025 Asosiasi Riset Ilmu Teknik Indonesia

The problem with the coconut grater machine is that the machine has decreased performance after being used for several years, especially in the mechanical components (electric motor, V belt, Pulley, grater knife, hopper) and its electricity. The purpose of maintenance and repair planning is to obtain costs, maintenance and repair schedules for the period 2026, and the ratio of maintenance costs to profit. The maintenance and repair planning method includes collecting previous maintenance data, applying the inspection-replace-repair-overhaul (IRRO) method, evaluating component conditions, predicting component lifespan, predicting labor costs, predicting supporting equipment that will be used in maintenance, predicting the time to replace spare parts or reinstall repaired components, estimating maintenance and repair costs for the 2026 period, and calculating the maintenance cost to profit ratio. The results of maintenance and repair planning obtained maintenance costs for the 2026 period were IDR 957,000 with an estimated coconut grater machine rental rate of IDR 10,000/hour which has the potential to be rented for 900 hours/year, and the maintenance cost to profit ratio was 10.6% which implies that the coconut grater machine with a capacity of 15 kg/hour is still prospective and feasible to use for the next few years.

Akmal Firdausy Fawaz Winahadi; Syamsul Hadi; Aufasiena Rafief Huda; Wahyu Endro Putra Rhendyansyah; Niki Cahyo Prasetyo

Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan 2025 Asosiasi Riset Ilmu Teknik Indonesia

Frequent damage to the grinding disc components and the transmission system of the 15 kg/hour rice flour grinder is a problem faced. The purpose of scheduling component maintenance and repairs is to obtain predictions of maintenance and repair schedules and costs for the period 2026. The component maintenance and repair scheduling method includes examining previous period maintenance and repair data, applying the inspection-replace-repair-overhaul (IRRO) method, assessing component conditions, estimating component life, estimating technician costs, estimating supporting work equipment and supporting materials to be used in maintenance, estimating the time for replacing spare parts or reinstalling components after repair, estimating maintenance and repair costs in 2026, and calculating the maintenance cost to profit ratio. The results of component maintenance and repair scheduling show that the maintenance cost in 2026 is Rp 1,370,000,- with an estimated annual profit potential of Rp 21,600,000, and the maintenance cost to profit ratio is 6.3%, which implies that the 15 kg/hour rice flour grinder is still quite prospective and feasible to use for the next few years.