Analysis of the Application of Hollow Core Slab to Cost and Time Efficiency in High Rise Building Construction Project

Jurnal Teknik Sipil 📅 2024 Vol 2, No 1
Abstract
. The floor slab is one of the factors that affect the cost and duration of construction projects because it has the largest volume of work among other jobs. The selection of the method of implementation of floor slab work also affects the efficiency of development. The use of precast slabs can be an alternative to conventional floor slabs because of their potential to increase cost efficiency, speed up implementation time, and increase structural durability. In this study, a comparative analysis of cost efficiency and scheduling time of precast hollow core slab (HCS) method as an alternative to conventional slabs was conducted, using primary data obtained from the project and in accordance with government regulations. Time analysis and scheduling were calculated with the help of Microsoft Project software and determination of plate work items. As for the cost analysis, it is calculated based on the literature and applicable regulations to get real results by field conditions. Based on the analysis, it is known that the implementation of the 4-storey building slab work with the alternative precast slab method takes 8 days and costs Rp. 1,691,887,497. While the conventional slab method takes 38 days with a total cost of Rp. 2,276,920,601.
Keywords
How to Cite

Fanny Ardiana Harijanto, et al. (2024). Analysis of the Application of Hollow Core Slab to Cost and Time Efficiency in High Rise Building Construction Project . Jurnal Teknik Sipil, 2(1).

Fanny Ardiana Harijanto; I Nyoman Dita Pahang Putra; Nia Dwi Puspitasari, "Analysis of the Application of Hollow Core Slab to Cost and Time Efficiency in High Rise Building Construction Project ," Jurnal Teknik Sipil, vol. 2, no. 1, 2024.

Fanny Ardiana Harijanto; I Nyoman Dita Pahang Putra; Nia Dwi Puspitasari. "Analysis of the Application of Hollow Core Slab to Cost and Time Efficiency in High Rise Building Construction Project ." Jurnal Teknik Sipil, vol. 2, no. 1, 2024.

Fanny Ardiana Harijanto; I Nyoman Dita Pahang Putra; Nia Dwi Puspitasari. "Analysis of the Application of Hollow Core Slab to Cost and Time Efficiency in High Rise Building Construction Project ." Jurnal Teknik Sipil 2, no. 1 (2024).

Fanny Ardiana Harijanto, et al. (2024) 'Analysis of the Application of Hollow Core Slab to Cost and Time Efficiency in High Rise Building Construction Project ', Jurnal Teknik Sipil, 2(1).

Fanny Ardiana Harijanto; I Nyoman Dita Pahang Putra; Nia Dwi Puspitasari. Analysis of the Application of Hollow Core Slab to Cost and Time Efficiency in High Rise Building Construction Project . Jurnal Teknik Sipil. 2024;2(1).

Artikel Terkait
Tren Sitasi Jurnal