Evaluasi Instalasi Kelistrikan Sesuai Standar Puil di CV Multi Teknik Perkasa Palembang

Abstract
Research conducted at CV Multi Teknik Perkasa Palembang indicates that the total installed power for various panels is 18,448 watts, consisting of 448 watts for lighting panels, 5100 watts for induction motor power panels, 9000 watts for cooling panels, and 3900 watts for lamp and socket panels. Further analysis reveals that the power consumption does not exceed the available power. Therefore, the electrical installation at CV Multi Teknik Perkasa Palembang is in good and safe condition for use.
Keywords
How to Cite

Riko Saputra, et al. (2024). Evaluasi Instalasi Kelistrikan Sesuai Standar Puil di CV Multi Teknik Perkasa Palembang. Uranus: Jurnal Ilmiah Teknik Elektro, Sains dan Informatika, 2(3). https://doi.org/10.61132/uranus.v2i3.300

Riko Saputra; M. Saleh Al Amin; Yudi Irwansi, "Evaluasi Instalasi Kelistrikan Sesuai Standar Puil di CV Multi Teknik Perkasa Palembang," Uranus: Jurnal Ilmiah Teknik Elektro, Sains dan Informatika, vol. 2, no. 3, 2024.

Riko Saputra; M. Saleh Al Amin; Yudi Irwansi. "Evaluasi Instalasi Kelistrikan Sesuai Standar Puil di CV Multi Teknik Perkasa Palembang." Uranus: Jurnal Ilmiah Teknik Elektro, Sains dan Informatika, vol. 2, no. 3, 2024.

Riko Saputra; M. Saleh Al Amin; Yudi Irwansi. "Evaluasi Instalasi Kelistrikan Sesuai Standar Puil di CV Multi Teknik Perkasa Palembang." Uranus: Jurnal Ilmiah Teknik Elektro, Sains dan Informatika 2, no. 3 (2024).

Riko Saputra, et al. (2024) 'Evaluasi Instalasi Kelistrikan Sesuai Standar Puil di CV Multi Teknik Perkasa Palembang', Uranus: Jurnal Ilmiah Teknik Elektro, Sains dan Informatika, 2(3). doi: 10.61132/uranus.v2i3.300.

Riko Saputra; M. Saleh Al Amin; Yudi Irwansi. Evaluasi Instalasi Kelistrikan Sesuai Standar Puil di CV Multi Teknik Perkasa Palembang. Uranus: Jurnal Ilmiah Teknik Elektro, Sains dan Informatika. 2024;2(3).