Peramcangan dan Pemasangan Instalasi Listrik di SDQ Amirul Mukminin

Abstract
Based on the results of initial observations at SDQ Amirul Mukminin, there were 4 classrooms that had not been installed with electrical installations according to standards. The community service activity consisted of 3 stages, namely: (1) Preparation Stage; ((2) Implementation Stage; and (3) Evaluation Stage. This activity lasted for 6 days, from 6–27 July 2024. The community service activity of Designing and Installing Electrical Installations at SDQ Amirul Mukminin which was carried out by the Electrical Engineering Vocational Education Study Program, Faculty of Teacher Training and Education, Sultan Ageng Tirtayasa University went well, with the results of the electrical installation having been installed according to standards at SDQ Amirul Mukminin
Keywords
How to Cite

Bagus Dwi Cahyono (2025). Peramcangan dan Pemasangan Instalasi Listrik di SDQ Amirul Mukminin. Jurnal Pelaksanaan Pengabdian Bergerak bersama Masyarakat, 3(2). https://doi.org/10.61132/natural.v3i2.1249

Bagus Dwi Cahyono, "Peramcangan dan Pemasangan Instalasi Listrik di SDQ Amirul Mukminin," Jurnal Pelaksanaan Pengabdian Bergerak bersama Masyarakat, vol. 3, no. 2, 2025.

Bagus Dwi Cahyono. "Peramcangan dan Pemasangan Instalasi Listrik di SDQ Amirul Mukminin." Jurnal Pelaksanaan Pengabdian Bergerak bersama Masyarakat, vol. 3, no. 2, 2025.

Bagus Dwi Cahyono. "Peramcangan dan Pemasangan Instalasi Listrik di SDQ Amirul Mukminin." Jurnal Pelaksanaan Pengabdian Bergerak bersama Masyarakat 3, no. 2 (2025).

Bagus Dwi Cahyono (2025) 'Peramcangan dan Pemasangan Instalasi Listrik di SDQ Amirul Mukminin', Jurnal Pelaksanaan Pengabdian Bergerak bersama Masyarakat, 3(2). doi: 10.61132/natural.v3i2.1249.

Bagus Dwi Cahyono. Peramcangan dan Pemasangan Instalasi Listrik di SDQ Amirul Mukminin. Jurnal Pelaksanaan Pengabdian Bergerak bersama Masyarakat. 2025;3(2).

Artikel Terkait
Tren Sitasi Jurnal