SciRepID - Optimalisasi Produktivitas dan Keselamatan Kerja Penambangan Menggunakan Metode Highdump Dumping Overburden


Optimalisasi Produktivitas dan Keselamatan Kerja Penambangan Menggunakan Metode Highdump Dumping Overburden

Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri
Asosiasi Riset Ilmu Teknik Indonesia (ARITEKIN)

📄 Abstract

Coal mining activities involve three main activities, namely loading, hauling, and dumping. This research focuses on the technical study of overburden (OB) dumping highdump activities In Pit Dump area with the aim of planning, implementing and evaluating technical, operational, economic, and HSE aspects. This research method includes field observations, stage plan making, and high dumping over water. Actual conditions show a difference in critical dumping height over water with geotechnical recommendations to minimize landslide risk and potential hazards. The study involved the collaboration of Mine Engineer, Geotech Engineer, Safety, and Production, and the use of equipment such as Komatsu HD 785 and Komatsu Dozer D155 & D85. The results showed that these changes could be carried out productively and safely, supporting coal production targets and adding economic value to the government and Mining Business License holders.

🔖 Keywords

#mining; overburden; dumping; work; safety

ℹ️ Informasi Publikasi

Tanggal Publikasi
23 December 2024
Volume / Nomor / Tahun
Volume 2, Nomor 4, Tahun 2024

📝 HOW TO CITE

Muhammad Osaegi Restu Amrulloh; Ade Putro Setyo Wibowo; Endik Riyanto, "Optimalisasi Produktivitas dan Keselamatan Kerja Penambangan Menggunakan Metode Highdump Dumping Overburden," Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri, vol. 2, no. 4, Dec. 2024.

ACM
ACS
APA
ABNT
Chicago
Harvard
IEEE
MLA
Turabian
Vancouver

🔗 Artikel Terkait dari Jurnal yang Sama

📊 Statistik Sitasi Jurnal

Tren Sitasi per Tahun