Analisis Penataan Ruang Parkir Pasar Keputran Kota Surabaya
Based on the results of the analysis that has been carried out, the following results were obtained, Parking volume on peak days reached 343 vehicles with details of 281 for motorbikes and 62 for cars. While only 160 SRP are available, this means that the existing parking space is no longer able to be a parking lot to accommodate the number of vehicles. The average parking duration of motorcycles is 196 minutes per day, and the average parking duration of cars is 218 minutes per day. The turnover rate of motorcycles in one day reaches 2.10 times, then for cars in one day it reaches 2.38 times. Meanwhile, the forecast for vehicle parking growth that will occur in the next 5 years is increasing every year, where for motorcycles it is 10.64%, and cars are 7.13%. The 2021 SRP for motorcycles is 147 SRP and cars are 36 SRP. The 2022 SRP for motorcycles is 177 SRP and cars are 40 SRP. The 2023 SRP for motorcycles is 210 SRP and cars are 45 SRP. The 2024 SRP for motorcycles is 247 SRP and cars are 50 SRP. The 2025 SRP for motorcycles is 28 SRP and cars are 56 SRP. SRP in 2026 for motorcycles is 332 SRP and cars is 61 SRP.
Aditia Eka Wicaksono (2025). Analisis Penataan Ruang Parkir Pasar Keputran Kota Surabaya. Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil, 3(3). https://doi.org/10.61132/konstruksi.v3i3.943
Aditia Eka Wicaksono, "Analisis Penataan Ruang Parkir Pasar Keputran Kota Surabaya," Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil, vol. 3, no. 3, 2025.
Aditia Eka Wicaksono. "Analisis Penataan Ruang Parkir Pasar Keputran Kota Surabaya." Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil, vol. 3, no. 3, 2025.
Aditia Eka Wicaksono. "Analisis Penataan Ruang Parkir Pasar Keputran Kota Surabaya." Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil 3, no. 3 (2025).
Aditia Eka Wicaksono (2025) 'Analisis Penataan Ruang Parkir Pasar Keputran Kota Surabaya', Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil, 3(3). doi: 10.61132/konstruksi.v3i3.943.
Aditia Eka Wicaksono. Analisis Penataan Ruang Parkir Pasar Keputran Kota Surabaya. Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil. 2025;3(3).
Optimasi Penggunaan Pondasi Micropile sebagai Pondasi Mesin Turbin: Studi Kasus Pabrik Gula Candi Baru Sidoarjo
Muhammad Rusydan; Agus Tugas; Abdul Halim
Penyempurnaan Desain dan Pembuatan Shock Breaker Belakang Tipe Pegas Sepeda Listrik
Alhafi Faidh Alisfahani; Syamsul Hadi; Dimas Adam Wijaya; Aura Krisna Jati; Fengky Adie Perdana; Pipit Wahyu Nugroho; Talifatim Machfuroh
Analisis Produktivitas dan Efisiensi Mobile Crane dalam Produksi Tiang Pancang: Studi kasus di PT. Adhi Beton Kabupaten Purwakarta
Assyfa Hermalia Puteri; Ananda Edo Pratama; Indra Ginanjar; Defagy Faudril; Moch Paridzi Almauludy; Salva Handika; Rifan Rizky Sabila; Deny Ernawan
Analisis Peran Manajer Lapangan dalam Optimalisasi Manajemen Sumber Daya Manusia pada Proyek Konstruksi di Kota Malang
Kartika Dian Rahmawati; Dafid Irawan; Riman Riman
Analisis Ketersedian dan Keterjangkauan Sarana Prasarana di Kelurahan Mawang Kecamatan Somba Opu Kabupaten Gowa
Amat Solleh
Kajian Penataan Jalur Pedestrian sebagai Unsur Fisik Pembentuk Karakter Visual dan Aktivitas Penggunjung: Studi Kasus : Gerbang Selamat Datang Simpang Kepur Kota Muara Enim
Mita Hargianti; Rika Septiana; Asia Afriani; Husnul Hidayat