SciRepID - Optimalisasi Kegiatan Setting Function Pada Proyek Pembangunan Kapal Menggunakan Metode CPM dan PERT


Optimalisasi Kegiatan Setting Function Pada Proyek Pembangunan Kapal Menggunakan Metode CPM dan PERT

Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan
Asosiasi Riset Ilmu Teknik Indonesia (ARITEKIN)

📄 Abstract

Planning project activities is one of the important foundations for project implementation so that the project can be carried out optimally. The schedule is part of project planning which is a parameter for the success of a project. Scheduling needs to be considered to determine the duration and sequence of project activities, so that a logical and realistic project schedule can be formed. The aim of this research is to obtain the critical path of a project activity along with the duration required during the project and to obtain the probability of the project reaching the expected target. In this research the Critical Path Method (CPM) and the Program Evaluation Review Technique (PERT) method are used. . Based on the results of the calculations and discussion, it can be concluded that in the function setting activity a critical path was obtained which consists of 7 activities, namely A – B – F – G – H – I – J with a duration of 57 days. It was also found that the probability of the project reaching the expected target within 76 days or less was 0.9978 or 99.78%.
 
 
 

🔖 Keywords

#CPM; Critical Path; PERT; Schedulling

ℹ️ Informasi Publikasi

Tanggal Publikasi
19 June 2024
Volume / Nomor / Tahun
Volume 2, Nomor 3, Tahun 2024

📝 HOW TO CITE

Alika Kurnia Agustin; Hafid Syaifullah, "Optimalisasi Kegiatan Setting Function Pada Proyek Pembangunan Kapal Menggunakan Metode CPM dan PERT," Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan, vol. 2, no. 3, Jun. 2024.

ACM
ACS
APA
ABNT
Chicago
Harvard
IEEE
MLA
Turabian
Vancouver

🔗 Artikel Terkait dari Jurnal yang Sama

📊 Statistik Sitasi Jurnal

Tren Sitasi per Tahun