SciRepID - The Role of Scheduling in Reducing Delays in Infrastructure Projects


The Role of Scheduling in Reducing Delays in Infrastructure Projects

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil
Asosiasi Riset Ilmu Teknik Indonesia (ARITEKIN)

📄 Abstract

Large delays in infrastructure projects may lead to budget overruns, worse quality, and stakeholder dissatisfaction. This study examines scheduling tools and methods to decrease delays in large infrastructure projects. It compared Primavera P6 and MS Project projects with traditional scheduling methods. Detailed case studies indicate that improved scheduling improves project timetables, resource allocation, and cost management. Results demonstrate that advanced scheduling may boost project productivity and save delays by 50%. At the study's conclusion, risk management, real-time tracking, and critical path analysis were suggested for scheduling. 

🔖 Keywords

#Critical Path Method; MS Project; Infrastructure Delays; Primavera P6; Project Scheduling

ℹ️ Informasi Publikasi

Tanggal Publikasi
03 March 2025
Volume / Nomor / Tahun
Volume 3, Nomor 2, Tahun 2025

📝 HOW TO CITE

Alhamza Ahmed Hasan, "The Role of Scheduling in Reducing Delays in Infrastructure Projects," Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil, vol. 3, no. 2, Mar. 2025.

ACM
ACS
APA
ABNT
Chicago
Harvard
IEEE
MLA
Turabian
Vancouver

🔗 Artikel Terkait dari Jurnal yang Sama

📊 Statistik Sitasi Jurnal

Tren Sitasi per Tahun