Perhitungan Waste Material Pekerjaan Penulangan, Pengecoran Serta Pemasangan Bekisting Pada Proyek Pembangunan Menara 17 PWNU Jawa Timur

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil
Asosiasi Riset Ilmu Teknik Indonesia (ARITEKIN)

📄 Abstract

In the current era of globalization, students are not only required to learn theory, but are also required to study in the field. Therefore, students receive a Practical Work course with a weight of 2 credits which is carried out for a minimum of 2 months or the equivalent of 320 hours. This practical work aims to fulfill the requirements for passing the course and learn what you don't get in college. The Practical Work Project that we are carrying out is the East Java Nahdatul Ulama (PWNU) Regional Management Tower 17 Tower Construction project.

🔖 Keywords

#Waste Materials; Calculations; Development Project

ℹ️ Informasi Publikasi

Tanggal Publikasi
26 April 2024
Volume / Nomor / Tahun
Volume 2, Nomor 2, Tahun 2024

📝 HOW TO CITE

Mohammad Arif Rahman; Ibni Aqiel; Dika Ayu Safitri, "Perhitungan Waste Material Pekerjaan Penulangan, Pengecoran Serta Pemasangan Bekisting Pada Proyek Pembangunan Menara 17 PWNU Jawa Timur," Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil, vol. 2, no. 2, Apr. 2024.

ACM
ACS
APA
ABNT
Chicago
Harvard
IEEE
MLA
Turabian
Vancouver

🔗 Artikel Terkait dari Jurnal yang Sama

📊 Statistik Sitasi Jurnal

Tren Sitasi per Tahun