Analisis Faktor Penunjang Keberhasilan Proyek Konstruksi Gedung Buddhi Dharma

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil
Asosiasi Riset Ilmu Teknik Indonesia (ARITEKIN)

📄 Abstract

Project success is the ultimate goal of every project. The difference in the success factors (Buddhi Dharma Building construction project) projects are due to each project having different influencing factors. Therefore, each party involved must have a certain strategy for the success of the project, namely knowing the most influential factors on the success (success) of the construction implementation. This researcher aims to identify the factors that support the success (Buddhi Dharma Building Construction project) Construction project in the southern Banten city of Tangerang. The research method used is descriptive analysis using a questionnaire with data on construction projects that are currently or have been done. Or the respondents are the main director, project manager, site manager, implementation, technical staff, quantity and quality control. From the returning quisoner, the data was tested using SPSS. There are 30 questionnaires distributed. The response rate is 100%. From the research data there are 4 factors with sub factors / variables. These 4 factors are project management factors, cost, time, quality of work, work safety. The results of the validation test, obtained 4 factors and 7 valid variables. The results of the reliability test, all valid factors are also reliable. From data analysis with SPSS version, 2.4, the most dominant factors on construction costs are: for project management, the plans and schedules used, affecting of project management factors, the most dominant sub-factor is the implementation schedule is not in accordance with schedule, which is  of the time, the most dominant sub-factor is the project bidding method, which is 4.7. Equipment factor, the most dominant sub-factor is the monitoring and planning capacity used, which is  The results of this researcher are later expected to be taken into consideration for all parties involved in the implementation of construction projects in order to achieve project success.

🔖 Keywords

#Project success; construction project; Buddhi Dharma Building

ℹ️ Informasi Publikasi

Tanggal Publikasi
24 January 2024
Volume / Nomor / Tahun
Volume 2, Nomor 1, Tahun 2024

📝 HOW TO CITE

Yadi Asso, "Analisis Faktor Penunjang Keberhasilan Proyek Konstruksi Gedung Buddhi Dharma," Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil, vol. 2, no. 1, Jan. 2024.

ACM
ACS
APA
ABNT
Chicago
Harvard
IEEE
MLA
Turabian
Vancouver

🔗 Artikel Terkait dari Jurnal yang Sama

📊 Statistik Sitasi Jurnal

Tren Sitasi per Tahun