Analisis Perencanaan dan Pengendalian Proyek Kapal X di PT XYZ dengan Menggunakan Metode Earn Value Management

Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil
Asosiasi Riset Ilmu Teknik Indonesia (ARITEKIN)

📄 Abstract

XYZ is a shipyard company in Indonesia. The company PT. However, the shipbuilding process experienced a delay in the project completion target due to the Covid-19 pandemic. In this research, it is devoted to monitoring ship projects for 30 months, so the EVM earnings value management method is needed to calculate CPI and SPI in order to get results of late calculations for the project and so that it can be re-evaluated using the EVM method, in the results of the EVM CPI and SPI method calculations occur. The delay was due to the impact of Covid-19, while for the SPI in the first 10 months the budget realization was small so it didn't require a lot of costs because the SPI result was greater than 1. However, for the CPI value of the Ship.

 
 

🔖 Keywords

#EVM; ship; PT XYZ

ℹ️ Informasi Publikasi

Tanggal Publikasi
05 January 2024
Volume / Nomor / Tahun
Volume 2, Nomor 1, Tahun 2024

📝 HOW TO CITE

Fredika Aura K.A; Rizqi Novitasari, "Analisis Perencanaan dan Pengendalian Proyek Kapal X di PT XYZ dengan Menggunakan Metode Earn Value Management," Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil, vol. 2, no. 1, Jan. 2024.

ACM
ACS
APA
ABNT
Chicago
Harvard
IEEE
MLA
Turabian
Vancouver

🔗 Artikel Terkait dari Jurnal yang Sama

📊 Statistik Sitasi Jurnal

Tren Sitasi per Tahun