SciRepID - Risk Management Analysis in the Implementation of Building Construction Projects


Risk Management Analysis in the Implementation of Building Construction Projects

International Journal of Mechanical, Electrical and Civil Engineering
Asosiasi Riset Ilmu Teknik Indonesia (ARITEKIN)

📄 Abstract

This research aims to identify risks and determine responses to risks that can affect the implementation of the Bojonegoro Regency Oncology Specialised Hospital Construction Project Phase 2. The research was conducted using literature study and field study methods. Primary data was obtained through documentation, field surveys, and interviews, while secondary data included the Cost Budget Plan (RAB), project schedule, and weekly project reports. Sampling was conducted using the Slovin technique to obtain a representative number of respondents. The results showed that there were 31 relevant risk variables, grouped into 8 categories, namely force majeure, material, equipment, labour, contractual, construction, design and technology, and management risks. Significant risks were identified using the Severity Index method, which measures probability and time impact. The results of the risk analysis using the severity index method showed that there were 24 risks included in the low risk level, 3 risks included in the medium risk level, and 2 risks included in the high risk level.

🔖 Keywords

#Construction Project; Risk Management; Risk Probability; Risk Impact

ℹ️ Informasi Publikasi

Tanggal Publikasi
13 January 2025
Volume / Nomor / Tahun
Volume 2, Nomor 1, Tahun 2025

📝 HOW TO CITE

Titin Rahayuningsih; Laksono Djoko Nugroho; Haris Muhammadun, "Risk Management Analysis in the Implementation of Building Construction Projects," International Journal of Mechanical, Electrical and Civil Engineering, vol. 2, no. 1, Jan. 2025.

ACM
ACS
APA
ABNT
Chicago
Harvard
IEEE
MLA
Turabian
Vancouver

🔗 Artikel Terkait dari Jurnal yang Sama

📊 Statistik Sitasi Jurnal

Tren Sitasi per Tahun