SciRepID - Manajemen Risiko terhadap Nilai Klaim Asuransi Rangka Kapal Berdasarkan ITC (Institute Time Clause) Hull 1.10.83 Clause 280 (All Risks Comprehensive) Pada Kapal BG. TRG 06

📅 02 September 2024
DOI: 10.61132/jupiter.v2i5.543

Manajemen Risiko terhadap Nilai Klaim Asuransi Rangka Kapal Berdasarkan ITC (Institute Time Clause) Hull 1.10.83 Clause 280 (All Risks Comprehensive) Pada Kapal BG. TRG 06

Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika
Asosiasi Riset Ilmu Teknik Indonesia (ARITEKIN)

📄 Abstract

This qualitative study aims to examine the implementation of risk management in hull insurance by collecting data through interviews with the risk management staff of Asuransi Mitra Pelindung Mustika Ltd. The findings revealed that this company has applied the risk management process, including risk identification, risk analysis, risk evaluation, risk control, risk transfer through other insurance policies, monitoring, and review. The company covers losses due to fire, explosion, violent theft, piracy, accidents involving installations, collisions with aircraft or similar objects, earthquakes, volcanic eruptions, lightning strikes, accidents during loading or refuelling, boiler explosions, machinery shaft breakage, or latent defects in the machinery, hull, or frame of the insured vessel. Asuransi Mitra Pelindung Mustika Ltd. also compensates for losses due to the negligence of the captain, officers, or crew of the insured vessel, as well as the shipyard. Time to process the claim becomes a significant challenge in fulfilling the insured's rights in the claim for the BG. TRG 06 vessel because it takes up to 14 days to gather all the necessary documents. This company will cover all repair costs and labor expenses, with an estimated total value of IDR 7,611,100,000.00.

🔖 Keywords

#risk management; hull insurance; claim

ℹ️ Informasi Publikasi

Tanggal Publikasi
02 September 2024
Volume / Nomor / Tahun
Volume 2, Nomor 5, Tahun 2024

📝 HOW TO CITE

Muhammad Faris Putratama; Minto Basuki, "Manajemen Risiko terhadap Nilai Klaim Asuransi Rangka Kapal Berdasarkan ITC (Institute Time Clause) Hull 1.10.83 Clause 280 (All Risks Comprehensive) Pada Kapal BG. TRG 06," Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika, vol. 2, no. 5, Sep. 2024.

ACM
ACS
APA
ABNT
Chicago
Harvard
IEEE
MLA
Turabian
Vancouver

🔗 Artikel Terkait dari Jurnal yang Sama

📊 Statistik Sitasi Jurnal

Tren Sitasi per Tahun