Analisis Beban Kerja Operator Mesin Cnc Laser Salvagnini Dengan Metode Fte Di PT. Xyz
XYZ is one of the largest manufacturers of bus houses in Indonesia as a safe and reliable means of transportation with almost 50 years of experience. In carrying out the production process, employees are required to always be optimal in completing their work, but on the other hand, employees have limited workloads. The aim of this research is to determine the workload conditions received by Salvagnini CNC Laser machine operators, as well as to provide suggestions for improvements to the preparation department (Salvagnini). In order to find out the workload conditions for operators from this department, workload calculations are carried out using the FTE (Full Time Equivalent) method which is obtained from observing job descriptions, units of output or types of activities produced by operators (units/activities), vol-umes containing the number of production results. , as well as the duration of work carried out by the operator. The operator's workload conditions on the first and third days were FTE values of 0.671 and 0.949 (underload) because the FTE value was <0.99, while on the second day the workload condition was 1.033 (fit) because the FTE value was between 1-1.28.
Muhammad Ilham Romadoni & Rr. Rochmoeljati (2024). Analisis Beban Kerja Operator Mesin Cnc Laser Salvagnini Dengan Metode Fte Di PT. Xyz. Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika, 2(1). https://doi.org/10.61132/jupiter.v2i1.65
Muhammad Ilham Romadoni; Rr. Rochmoeljati, "Analisis Beban Kerja Operator Mesin Cnc Laser Salvagnini Dengan Metode Fte Di PT. Xyz," Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika, vol. 2, no. 1, 2024.
Muhammad Ilham Romadoni; Rr. Rochmoeljati. "Analisis Beban Kerja Operator Mesin Cnc Laser Salvagnini Dengan Metode Fte Di PT. Xyz." Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika, vol. 2, no. 1, 2024.
Muhammad Ilham Romadoni; Rr. Rochmoeljati. "Analisis Beban Kerja Operator Mesin Cnc Laser Salvagnini Dengan Metode Fte Di PT. Xyz." Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika 2, no. 1 (2024).
Muhammad Ilham Romadoni & Rr. Rochmoeljati (2024) 'Analisis Beban Kerja Operator Mesin Cnc Laser Salvagnini Dengan Metode Fte Di PT. Xyz', Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika, 2(1). doi: 10.61132/jupiter.v2i1.65.
Muhammad Ilham Romadoni; Rr. Rochmoeljati. Analisis Beban Kerja Operator Mesin Cnc Laser Salvagnini Dengan Metode Fte Di PT. Xyz. Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika. 2024;2(1).
Menurunkan Frequency Kecelakaan Subkontraktor dan Meningkatkan Kepuasan Pelanggan Melalui Penguatan Pilar Safety Governance di PT Putra Perkasa Abadi Jobsite Bib
Muhammad Osaegi Restu Amrulloh; Berthoni Gantino
Perancangan Tata Letak Fasilitas pada Area Inspecting Menggunakan Metode Activity Relationship Chart (ARC) di PT X
Annida Haya Fadhilah; Bekti Nugrahadi; Anita Oktaviana Trisna Devi
Effectiveness of Mineral Downstreaming Policy in Encouraging Regional Economic Transformation : A Case Study of RKEF And HPAL Integration In Obi Island, South Halmahera
Muhammad Djody Satriani
Perbandingan Simulasi Pengukuran Aliran Gas Menggunakan USM Dengan Simulasi Melalui Aplikasi Kelton Pada Proyek Pipa Gas di PT. X
Marisa Ayuwandhira Paitaha; Wasis Waskito Adi; Novan Akhiriyanto
Perencanaan Strategi Pemasaran Kerajinan Kayu untuk Meningkatkan Volume Penjualan Menggunakan Analisis SWOT dan QSPM
Viki Uswatul Khoridah; Anita Oktaviana Trisna Devi; Erna Indrianingsih
Penerapan Metode Collaborative Planning Forecasting & Replenishment (CPFR) dalam Perencanaan Persediaan untuk Meningkatkan Kepatuhan Lead Time Supply terhadap KPI pada Studi Kasus PT XYZ
Qisma Rosalina Wahda; Erna Indriastiningsih; Bekti Nugrahadi