Analisis Urgency, Seriousness, Growth (Usg) Untuk Minimalisasi Jam Berhenti Giling Pada Stasiun Gilingan Di Pt. Pg Xyz
PG XYZ is a company part of agribusiness which operates in the sugar cane agroindustry in the Sidoarjo area. PT. PG XYZ is trying to minimize the stopping hours for each mill for six months. With the Urgency, Seriousness, Growth (USG) analysis method, the causes and effects can be identified and minimized so that the company gets maximum profits in an efficient time. The sugar cane milling activity is an important part of the company's production system and has risks that have a very large impact and often occur when milling machines stop working. This is due to factors that influence the milling machine. Based on the research results, it was found that PT. PG XYZ, the biggest thing that happened and had a lot of weight was the root causes that had an impact on the machine, namely the drive engine protection device didn't work, the limit switch didn't work, the backup device was damaged, the electric motor caught fire, the oil cylinder leaked, the gearbox shaft broke. Meanwhile, for the weighting of the solution. PT. PG XYZ doubles the driving machine as a double drive, upgrades the driving machine, buys a bigger chain, adds human resources, makes spare tools. With this weighting, it is hoped that we can control stopping hours based on problem data and the most effective solutions and industrial activities run well and produce the best quality.
Febby Ficha Shekina & Tranggono (2024). Analisis Urgency, Seriousness, Growth (Usg) Untuk Minimalisasi Jam Berhenti Giling Pada Stasiun Gilingan Di Pt. Pg Xyz. Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika, 2(1). https://doi.org/10.61132/jupiter.v2i1.57
Febby Ficha Shekina; Tranggono, "Analisis Urgency, Seriousness, Growth (Usg) Untuk Minimalisasi Jam Berhenti Giling Pada Stasiun Gilingan Di Pt. Pg Xyz," Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika, vol. 2, no. 1, 2024.
Febby Ficha Shekina; Tranggono. "Analisis Urgency, Seriousness, Growth (Usg) Untuk Minimalisasi Jam Berhenti Giling Pada Stasiun Gilingan Di Pt. Pg Xyz." Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika, vol. 2, no. 1, 2024.
Febby Ficha Shekina; Tranggono. "Analisis Urgency, Seriousness, Growth (Usg) Untuk Minimalisasi Jam Berhenti Giling Pada Stasiun Gilingan Di Pt. Pg Xyz." Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika 2, no. 1 (2024).
Febby Ficha Shekina & Tranggono (2024) 'Analisis Urgency, Seriousness, Growth (Usg) Untuk Minimalisasi Jam Berhenti Giling Pada Stasiun Gilingan Di Pt. Pg Xyz', Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika, 2(1). doi: 10.61132/jupiter.v2i1.57.
Febby Ficha Shekina; Tranggono. Analisis Urgency, Seriousness, Growth (Usg) Untuk Minimalisasi Jam Berhenti Giling Pada Stasiun Gilingan Di Pt. Pg Xyz. Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika. 2024;2(1).
Menurunkan Frequency Kecelakaan Subkontraktor dan Meningkatkan Kepuasan Pelanggan Melalui Penguatan Pilar Safety Governance di PT Putra Perkasa Abadi Jobsite Bib
Muhammad Osaegi Restu Amrulloh; Berthoni Gantino
Perancangan Tata Letak Fasilitas pada Area Inspecting Menggunakan Metode Activity Relationship Chart (ARC) di PT X
Annida Haya Fadhilah; Bekti Nugrahadi; Anita Oktaviana Trisna Devi
Effectiveness of Mineral Downstreaming Policy in Encouraging Regional Economic Transformation : A Case Study of RKEF And HPAL Integration In Obi Island, South Halmahera
Muhammad Djody Satriani
Perbandingan Simulasi Pengukuran Aliran Gas Menggunakan USM Dengan Simulasi Melalui Aplikasi Kelton Pada Proyek Pipa Gas di PT. X
Marisa Ayuwandhira Paitaha; Wasis Waskito Adi; Novan Akhiriyanto
Perencanaan Strategi Pemasaran Kerajinan Kayu untuk Meningkatkan Volume Penjualan Menggunakan Analisis SWOT dan QSPM
Viki Uswatul Khoridah; Anita Oktaviana Trisna Devi; Erna Indrianingsih
Penerapan Metode Collaborative Planning Forecasting & Replenishment (CPFR) dalam Perencanaan Persediaan untuk Meningkatkan Kepatuhan Lead Time Supply terhadap KPI pada Studi Kasus PT XYZ
Qisma Rosalina Wahda; Erna Indriastiningsih; Bekti Nugrahadi