Comparative Analysis of the RAB for the Kampi Sunter Hotel Development Project Structural Work Package between AHSP 2024 and AHSP 2025

Abstract
the dynamics of the building  materials market and labor costs. Therefore, a constantly updated  reference is needed to ensure accurate and efficient project cost  estimates. One such reference is the Work Unit Price Analysis  (AHSP) which is released by the government periodically. This  study aims to analyze and compare the Cost Budget Plan (RAB)  value for structural work on the Kampi Sunter Hotel construction  project based on the Work Unit Price Analysis (AHSP) versions  2024 and 2025. The method used is a quantitative approach  through cost estimation calculations using both versions of the  AHSP. The results show that the total cost of structural work  based on the 2024 AHSP is Rp15,384,577,550, while based on the  2025 AHSP it is Rp13,830,592,539. There is a difference of  Rp1,553,985,011 or a decrease of approximately 10.1% in the  2025 AHSP. This decrease is caused by changes in the unit price  of materials, one of which is the price of Ready Mix Concrete  K300 which decreased from Rp1,048,722.00 (2024) to  Rp931,683.00 (2025). Therefore, it is important for project  planners to always update the AHSP reference used to match the  applicable year to be more relevant.
Keywords
How to Cite

Afif Budi Santoso, et al. (2025). Comparative Analysis of the RAB for the Kampi Sunter Hotel Development Project Structural Work Package between AHSP 2024 and AHSP 2025 . International Journal Science and Technology (IJST), 4(3). https://doi.org/10.56127/ijst.v4i3.2290

Afif Budi Santoso; Yuliyanti, Ervina, "Comparative Analysis of the RAB for the Kampi Sunter Hotel Development Project Structural Work Package between AHSP 2024 and AHSP 2025 ," International Journal Science and Technology (IJST), vol. 4, no. 3, 2025.

Afif Budi Santoso; Yuliyanti, Ervina. "Comparative Analysis of the RAB for the Kampi Sunter Hotel Development Project Structural Work Package between AHSP 2024 and AHSP 2025 ." International Journal Science and Technology (IJST), vol. 4, no. 3, 2025.

Afif Budi Santoso; Yuliyanti, Ervina. "Comparative Analysis of the RAB for the Kampi Sunter Hotel Development Project Structural Work Package between AHSP 2024 and AHSP 2025 ." International Journal Science and Technology (IJST) 4, no. 3 (2025).

Afif Budi Santoso, et al. (2025) 'Comparative Analysis of the RAB for the Kampi Sunter Hotel Development Project Structural Work Package between AHSP 2024 and AHSP 2025 ', International Journal Science and Technology (IJST), 4(3). doi: 10.56127/ijst.v4i3.2290.

Afif Budi Santoso; Yuliyanti, Ervina. Comparative Analysis of the RAB for the Kampi Sunter Hotel Development Project Structural Work Package between AHSP 2024 and AHSP 2025 . International Journal Science and Technology (IJST). 2025;4(3).