Cost and Time Analysis for the Elevation and Relocation of the Sutt Tower in the Ancol Timur – Pluit Toll Road Project

Abstract
The construction of the Ancol Timur – Pluit Toll Road as part of a national strategic project in Jakarta faces technical challenges in the form of the presence of High Voltage Transmission Towers (SUTT) that interfere with the construction route. This study aims to analyze the cost and time required to elevate and relocate the SUTT towers, as well as evaluate their efficiency in terms of project management. The study employs cost analysis methods using the BOW, SNI, and AHSP approaches, along with scheduling techniques such as Bar Chart, CPM, and PERT. The results indicate relatively close cost estimates across methods but variations in implementation duration among scheduling methods. Project efficiency is determined by the accuracy of estimates, inter-sectoral coordination, and the utilization of construction technology. These findings are expected to provide practical contributions to the implementation of similar infrastructure projects and serve as an academic reference in construction management.
Keywords
How to Cite

Melky Rawis & Reynold Andika Pratama (2025). Cost and Time Analysis for the Elevation and Relocation of the Sutt Tower in the Ancol Timur – Pluit Toll Road Project . Jurnal Ilmiah Teknik (JUIT), 4(3). https://doi.org/10.56127/juit.v4i2.2237

Melky Rawis; Reynold Andika Pratama, "Cost and Time Analysis for the Elevation and Relocation of the Sutt Tower in the Ancol Timur – Pluit Toll Road Project ," Jurnal Ilmiah Teknik (JUIT), vol. 4, no. 3, 2025.

Melky Rawis; Reynold Andika Pratama. "Cost and Time Analysis for the Elevation and Relocation of the Sutt Tower in the Ancol Timur – Pluit Toll Road Project ." Jurnal Ilmiah Teknik (JUIT), vol. 4, no. 3, 2025.

Melky Rawis; Reynold Andika Pratama. "Cost and Time Analysis for the Elevation and Relocation of the Sutt Tower in the Ancol Timur – Pluit Toll Road Project ." Jurnal Ilmiah Teknik (JUIT) 4, no. 3 (2025).

Melky Rawis & Reynold Andika Pratama (2025) 'Cost and Time Analysis for the Elevation and Relocation of the Sutt Tower in the Ancol Timur – Pluit Toll Road Project ', Jurnal Ilmiah Teknik (JUIT), 4(3). doi: 10.56127/juit.v4i2.2237.

Melky Rawis; Reynold Andika Pratama. Cost and Time Analysis for the Elevation and Relocation of the Sutt Tower in the Ancol Timur – Pluit Toll Road Project . Jurnal Ilmiah Teknik (JUIT). 2025;4(3).

Artikel Terkait
Tren Sitasi Jurnal