PERENCANAAN JADWAL INDUK PRODUKSI PADA PRODUK TEMPE DI RUMAH TEMPE INDONESIA
These problems can be solved through production planning using the selected aggregate planning strategy or the strategy that produces the lowest total production costs. This strategy is implemented in the preparation of a production master schedule to estimate the quantity of tempe products that must be met in the next period. In this study, two strategies were used, namely the level strategy with a production cost of 1,403,904,740.04, - and the chase strategy with a production cost of 1,404,149,544.96, -. Based on these considerations of production costs, the strategy chosen to be continued in making the master production schedule is the level strategy.
The Master Production Schedule is made based on the calculation results of the disaggregation process on the production units of each brand for each period. The amount of Tempekita and Tempe Kim's production based on the Master Production Schedule (JIP) respectively for the 1st period was 2790 and 13099 pcs, the 2nd period was 1901 and 10624 pcs, the 3rd period was 2104 and 10421 pcs, the 3rd period 4th period 3224 and 8897 pcs, 5th period 4196 and 8329 pcs, 6th period 4117 and 8004 pcs, 7th period 3735 and 8790 pcs, 8th period 4799 and 7726 pcs, 7th period 9th of 3700 and 7613 pcs, 10th period of 5409 and 7116 pcs, 11th period of 5329 and 6792 pcs, 12th period of 5070 and 7455 pcs.
Bellinda Ayustina, et al. (2023). PERENCANAAN JADWAL INDUK PRODUKSI PADA PRODUK TEMPE DI RUMAH TEMPE INDONESIA. Jurnal Ilmiah Teknik (JUIT), 2(1). https://doi.org/10.56127/juit.v2i1.497
Bellinda Ayustina; Arief Nurdini; Ardhy Lazuardy, "PERENCANAAN JADWAL INDUK PRODUKSI PADA PRODUK TEMPE DI RUMAH TEMPE INDONESIA," Jurnal Ilmiah Teknik (JUIT), vol. 2, no. 1, 2023.
Bellinda Ayustina; Arief Nurdini; Ardhy Lazuardy. "PERENCANAAN JADWAL INDUK PRODUKSI PADA PRODUK TEMPE DI RUMAH TEMPE INDONESIA." Jurnal Ilmiah Teknik (JUIT), vol. 2, no. 1, 2023.
Bellinda Ayustina; Arief Nurdini; Ardhy Lazuardy. "PERENCANAAN JADWAL INDUK PRODUKSI PADA PRODUK TEMPE DI RUMAH TEMPE INDONESIA." Jurnal Ilmiah Teknik (JUIT) 2, no. 1 (2023).
Bellinda Ayustina, et al. (2023) 'PERENCANAAN JADWAL INDUK PRODUKSI PADA PRODUK TEMPE DI RUMAH TEMPE INDONESIA', Jurnal Ilmiah Teknik (JUIT), 2(1). doi: 10.56127/juit.v2i1.497.
Bellinda Ayustina; Arief Nurdini; Ardhy Lazuardy. PERENCANAAN JADWAL INDUK PRODUKSI PADA PRODUK TEMPE DI RUMAH TEMPE INDONESIA. Jurnal Ilmiah Teknik (JUIT). 2023;2(1).
Analysis and Improvement of Rubber Roll Production Line Balancing Using Ranked Positional Weight (RPW) and Region Approach Methods at CV. ABC
Rahman, Fatur; Widiasih, Wiwin
Design of a Shallot Peeling Machine for EA Kitchen MSME Using Voice of Customer, Quality Function Deployment, and Anthropometric Analysis
Herlambang, Indah Putri; Widiasih, Wiwin
Consumer Preference-Based Redesign of Vanish Detergent Packaging Using Conjoint Analysis
Maulana, Rifky; Rohman, Muhammad Daffa Fadhlur; Herawan, Candra; Saragih, Jeims Strong; Akidnaram, Arya; Wahyudi, Rizqi
Quality Control of Plastic Pallet Products Using the Taguchi Method to Reduce Product Rejection: A Case Study on the Sound 1800 Machine
Kusuma, Febiola Alyza; Khoiroh, Siti Muhimatul
Integrated Biorefinery Pathways for Organic Waste Valorisation: A Systematic Literature Review of Biological, Thermochemical, and Anaerobic Digestion Technologies
Liwun, Stephanus Benedictus Bera; Indrasti, Nastiti Siswi; Suprihatin, Suprihatin; Djatna, Taufik
Implementation of Laplacian-Based Image Sharpening on X-Ray Images
Wibowo, Priyo Sarjono; Maurits, Ivan